Loading...
BLD RESPONSE 1 4.15.20Hi Denise:   Thank you again for assisting on this project:  18300 Andover Street Addition/Remodel.  Mr. Akau has been reviewing the project, and recently working with Sim Singh from our office.  They have been discussing some minor modifications to the drawings and calculations.    The following is being forwarded to you related to this project: Supplementary Calculation Package:  Mr. Akau requested that the high roof framing headers be labeled properly.  We have created a supplementary calculation package for the high roof framing headers, and they are attached.  Additional Building Envelope Specifications:  Mr. Akau requested additional information about the mechanical ventilation requirements.  We are providing some additional notes to revise the ‘Mechanical Ventilation’ and ‘Mechanical Ventilation and Outdoor Air Intake’ notes listed on sheet 1.1 of the original drawings titled ‘Adams Residence Addition/Remodel’ dated March 16, 2020.  We have prepared the attached Supplemental Detail SD-1 that can be attached to the drawings.    If you or Mr. Akau have any additional questions or require anything more, please let us know.  Also, if you have any updates (or where we might be able to look online) so I can advise the client who is also on this email, that would be helpful.   I hope you are all staying safe!   NOTICE: We want to let you know that the government-imposed COVID-19 regulations could affect some of our staff and that we will strive to keep communications and projects our top priority, but there may be some delay due to these extraordinary circumstances. Thank you for your understanding.      Michael P. Smith, P.E., S.E. Principal P: (206) 281-7500 x106 | michaelp@pacengtech.com   PACIFIC Engineering Technologies, Inc. 2150 North 107th Street Suite 320 Seattle, Washington 98133       From: Sim Singh <SSingh@pacengtech.com>  Sent: Tuesday, April 14, 2020 4:51 PM To: donovan.akau@edmondswa.gov Cc: denise.nelson@edmondswa.gov; Mike Smith <MichaelP@pacengtech.com> Subject: Adams Res Addition/remodel - Andover St.   Hello Donovan,   We are currently working on the revisions for the mechanical ventilation notes and calculations. We will send the revisions to Denise by tomorrow.   Thank you    NOTICE: We want to let you know that the government-imposed COVID-19 regulations could affect some of our staff and that we will strive to keep communications and projects our top priority, but there may be some delay due to these extraordinary circumstances. Thank you for your understanding.    Gursimranjot (Sim) Singh Design Engineer PACIFIC Engineering Technologies, Inc. Error! Filename not specified. P: (206) 281-7500, Ext. 114 | ssingh@pacengtech.com 2150 North 107th Street Suite 320 Seattle, Washington 98133