Loading...
ENG2019-0429RIGHT OF WAY EUC PERMIT PERMIT NUMBER City of Edmonds .•0• 04• www.cityofedmonds.gov Description: The proposed work in r/w is to bury 88' of (1) 2" conduit by ISSUED: 05/11/2020 Address: 123 2ND AVE S EDMONDS WA 98020-8457 EXPIRES: 11/11/2020 Permit Type: RIGHT OF WAY EUC Permit Subtype: MINOR Parcel Number: 00454800102000 NAME TYPE NAME ADDRESS PHONE APPLICANT COMCAST 1525 75TH ST SW, EVERETT WA 98203 (425)967-1158 CONTRACTOR Cablecom LLC 1316 Bonneville Ave, Snohomish WA 98290 OWNER ENTERPRISES LLCALCAZAR 1844016TH AVE NW, SHORELINE WA98177 FEE INFORMATION DESCRIPTION AMOUNT PAID RIGHT OF WAY MINOR - EUC PERMIT FEE $100.00 X-TECHNOLOGY FEE $35.00 REQUIREMENTS REQUIREMENT TYPE NOTES TRAFFIC CONTROL Traffic control and public safety shall be in accordance with City regulations as required by the City Engineer. Every flagger must be trained as required by WAC 296-155-305 and must have certification verifying completion of the required training in their posession. RESTORATION Restoration is to be in accordance with City codes. All street -cut trench work shall be patched with asphalt or City approved material prior to the end of the workday - No Exceptions WARRANTY The contractor is responsible for workmanship and materials for a period of one year following the final inspection and acceptance of the work. INSPECTION SCHEDULING: WWW.MYBUILDING PERMIT.COM 24 HR NOTICE REQUIRED INDEMNITY The Applicant has signed an application which states he/she holds the City of Edmonds harmless from injuries, damages or claims of any kind or description whatsoever, foreseen or unforeseen, that may be made against the City of Edmonds or any of its departments or employees, including but not limited to the defense of any legal proceedings including defense costs and attorney fees by reason of granting this permit. THIS DOCUMENT IS NOT VALID UNTIL FEES ARE PAID AND THE CITY ENGINEER OR HIS/HER DEPUTY HAS SIGNED BELOW Q 5/11/2020 RELEASED BY & DATE Printed: Monday, May 11, 2020 12:17:07 PM 1 of 2 -1RRRTF WAY EUC PERMIT City of • • • •:• • • • ., CONDITIONS CONDITION TYPE Alert Affected Properties Alert affected residents and/or businesses prior to work start. Bore Crossings Verify clear bore crossings Conform to approved plans Conform to approved working drawings and Traffic Control plan. Work approved under this permit may or may not qualify as an essential or allowed activity per the Governors Stay Home, Stay Healthy Order. Refer to the Order and the Citys website for up-to-date information related to development activities during COVID-19. Issuance of this permit does not COVID-19 NOTICE certify that construction is allowed to immediately occur, and inspections may or may not be granted accordingly. Construction activities and all required inspections will resume when the Order has been lifted. Damage to Frontage Applicant shall repair/replace all damage to utilities or frontage improvements in City right-of-way per Improvements City standards that is caused by or occurs during the permitted project. ESC Required Maintain erosion & sedimentation control. Keep street clean. Applicant, on behalf of his or her spouse, heirs, assigns, and successors in interests, agrees to indemnify defend and hold harmless the City of Edmonds, Washington, its officials, employees, and Hold Harmless agents from any and all claims for damages of whatever nature, arising directly or indirectly from the issuance of this permit. Issuance of this permit shall not be deemed to modify, waive or reduce any requirements of any City ordinance not limit in any way the City's ability to enforce any ordinance provision. Inspections Call for required inspections as noted. Landscape Restoration Restore Landscape to like or better conditions. ROW Restoration Restore ROW to City standards Sound/Noise originating from temporary construction sites as a result of construction activity are exempt from the noise limits of ECC Chapter 5.30 only during the hours of 7:OOam to 6:OOpm on Sounds/Noise weekdays and 10:OOam and 6:OOpm on Saturdays, excluding Sundays and Federal Holidays. At all other times the noise originating from construction sites/activities must comply with the noise limits of Chapter 5.30, unless a variance has been granted pursuant to ECC 5.30.120. Traffic Control Handout Traffic Control per approved plan and MUTCD. Refer to City of Edmonds traffic control requirements. Underground Utility Locates Call for locates of underground utilities prior to any excavation. Utility Patch Restoration Utility patch restoration to be in accordance with Edmonds Standard detail E2.3 INSPECTIONS INSPECTION TYPE DATE RESULT NOTES COMPLETE ENGINEERING FINAL Printed: Monday, May 11, 2020 12:17:07 PM 2 of 2 nF EVA,1(-), ANC. I sc) u ROW PERMIT NO.: ENG 2019-0429 ISSUE DATE: 5/11/20 RIGHT-OF-WAY CONSTRUCTION PERMIT APPLICATION PROJECT NAME: JB-127924 CONTRACTOR: CABLECOM, LLC CONTACT: Jourden Lawrence Phone #: 425-967-1158 Mailing Address:1525 75th St. SW,EVERETT, WA 98201 Fax 1h State License #: CABLEL-971 DP Email #: jourden_lawrence@comcast.com City Business License #: NR-021818 0 Liability Insurance 0 Bonded 123 2ND AVE S, EDMONDS, WA 98020 ADDRESS OR INTERSECTION OF CONSTRUCTION: Alley between 2nd Ave S & 3rd Ave S ROW WORK ASSOCIATED WITH THE FOLLOWING TYPE OF PROJECT: ❑ Commercial ❑ Subdivision ❑ City Project ❑ Traffic Control (Only) ❑ Multi -Family ❑ Single Family ❑ Other ❑ EUC (PUD, VERIZON, PSE, COMCAST, OVWSD): Is this permit part of a blanket permit9 ANY ASSOCIATED PERMITS? ❑✓ Yes ❑ No BLD# ENG# DESCRIPTION OF PROPOSED WORK (Be Specific) : The proposed work in the right of way is to bury 88' of (1) 2" conduit by means of open cut, minimum of 36", pull (1) 12ct from existing vault located at SW corner of intersecting alleys between Main St/James St and 3rd Ave S / 2nd Ave S to address 123 2nd Ave S, Edmonds, WA 98020. WAS STREET OVERLAYED WITHIN THE LAST FIVE 5 YEARS? YES ❑ NO ❑ Year: PAVEMENT CUT: 0 Yes ❑ No If yes, indicate size of cut: CONCRETE CUT: ❑ Yes ❑✓ No If yes, indicate size of cut: 88, x 1' x RIGHT-OF-WAY CLOSURE AREA TOTAL DURATION (NUMBER OF MONTHS) Sidewalk 48 Hrs + LF X LF SF Alley 72 Hrs + LF X LF SF Parking 72 Hrs + LF X LF SF APPLICANT TO READ AND SIGN *Traffic control and public safety shall be in accordance with City regulations as required by the City Engineer. Every flagger must be trained as required by (WAC) 296-155-305 and must have certification verifying completion of the required training in their possession. *Restoration is to be in accordance with City codes and Standards. All street -cut trench work shall be patched with asphalt or City approved material prior to the end of the workday — NO EXCEPTIONS. Indemnity: The Applicant has signed an application which states he/she hold the City of Edmonds harmless from injuries, damages or claims of any kind or description whatsoever, foreseen or unforeseen, that may be made against the City of Edmonds or any of its departments or employees, including defense costs and attorney fees by reason of granting this permit. I have read the above statements and understand the permit requirements and acknowledge that I must follow all requirements in order for the permit to be valid. SIGNATURE .��Z-- DATE 8/23/2019 Contractor or Agent NO WORK SHALL BEGIN PRIOR TO PERMIT ISSUANCE SCOPE OF WORK - r • - lh: r 2.1) FROM TIE POINT SP.WALY.0760 �? BURY NEW 2" CONDUIT AND 48CT FOC. CORE INTO ELECTRIC ROOM. 4.1) FROM TIE POINT SP.WALY.0760 •c.i� • BURY NEW 2" CONDUIT AND 48CT : J r '. �`•. l FOC. CORE INTO THE ELECTRIC •� '� ROOM. PLACE 48CT FOC. MOUNT i NEW IM SPLICE ON WALL. ROUTE 524) i NEW 12CT FOC THROUGH EXISTING _ CONDUIT INTO LOCBOX TO TARGET • j ��1 LOCATION. �l� / �,/ ' TIE-IN > ( if SP.WALY.0760 n �. 4.2) ROUTE NEW 12CT FOC • e �1I �` ,���, f THROUGH EXISTING CONDUIT INTO BURY NEW 2" CONDUIT • �`; %� AND 48CT FOC MIN 36" LOCBOX TO THE CUSTOMER • J / DEPTH SERVER ROOM. THREE LEVEL BUILDING M/ op`` 88 ,� SPOKE TO BUILDING OWNER/BOARD ~ �~ �/ ►�. � ems.:''►. MEMBER DEBBIE ABOUT NEW � ROUTE TO LOCATION '�•� 0 r PHONE NUMBER: 206-999-9360 All work and appurtenances' shall occur within the h l • right-of-way. If any work or 'I ' appurtenances are located on private property approval and 1 !f - -ri easements needs to be obtained from the private •.e property owner and Snohomish County PUD. -U - JB-127924 SITE: Portrait Displays ADDRESS: 123 2ND AVE S STE 200 EDMONDS WA 98020 ROUTE OVERVIEW 1� REV. DA 11 N ROW AERIAL = 0' SHEET NUMBER: ROW UG = 88' Ccomcast. qcystems w E REPAIREDBY: C.HENDRICKSON PRIVATE EXTERIOR = 0' CONSTRUCTION SUPERVISOR- FIELD OPERATIONS - ATE: 8/ 1 6/ 1 9 P R I VAT E INTERIOR = 146' CASEY BROWN WKE SNOWDON (425)-754-0064 (906)-282-3670 S TOTAL - 234' O F 6 CASEY_BROWN2QCABLE.COMCAST.COM MBCE.SNOWDONQCCISYSTEMS.COM _ SCOPE OF WORK 2.1) FROM TIE POINT SP.WALY.0760 BURY NEW 2" CONDUIT AND 48CT FOC. CORE INTO ELECTRIC ROOM. 4.1) FROM TIE POINT SP.WALY.0760 BURY NEW 2" CONDUIT AND 48CT FOC. CORE INTO THE ELECTRIC ROOM. PLACE 48CT FOC. MOUNT NEW IM SPLICE ON WALL. ROUTE NEW 12CT FOC THROUGH EXISTING CONDUIT INTO LOCBOX TO TARGET LOCATION. 4.2) ROUTE NEW 12CT FOC THROUGH EXISTING CONDUIT INTO LOCBOX TO THE CUSTOMER SERVER ROOM. THREE LEVEL BUILDING SPOKE TO BUILDING OWNER/BOARD MEMBER DEBBIE ABOUT NEW ROUTE TO LOCATION PHONE NUMBER: 206-999-9360 All work and appurtenances shall occur within the right-of-way. If any work or appurtenances are located on private property approval and easements needs to be obtained from the private property owner and Snohomish County PUD. JB-127924 its BURY NEW 2" CONDUIT AND 48CT FOC MIN 36" DEPTH SITE: I Portrait Displays ADDRESS: 123 2ND AVE S STE 200 EDMONDS WA 98020 1"Ado Comcast. CONSTRUCTION SUPERVISOR- CASEY BROWN (425)-754-0064 CASEY_BROWN2QCABLE.COMCAST.COM � v, systems FIELD OPERATIONS - MBCE SNOWDON (906)-282-3670 MBCE.SNOWDONQCCISYSTEMS.COM NREV w E S ROW AERIAL = 0' ROW UG = 88' PRIVATE EXTERIOR = 0' P R I VAT E INTERIOR = 146' TOTAL = 234 t� PREPAIRED BY: C.HENDRICKSON ATE: 8/ 1 6/ 1 9 04 ROUTE OVERVIEW SHEET NUMBER: 1 OF 6 CALL OUT BOX xxx' FOOTAGE CALL OUT NEW STRAND/COAX OVERLASH (EXISTING STRAND) NEW RISER EXISTING RISER NEW ROW U/G EXISTING ROW U/G NEW PRIVATE EXISTING PRIVATE U/G NEW BUILDING EXTERIOR EXISTING BUILDING EXTERIOR NEW BUILDING INTERIOR — — — — — EXISTING BUILDING INTERIOR JB-127924 Comcast. CONSTRUCTION SUPERVISOR- CASEY BROWN (a2s)-754 " CASEY_BRO WN2QCABLE.COMCAST.COM 5 L FIELD OPERATIONS - MIKE SNOWDON (906)-282-3670 M KE.SNOWDON®CCISYSTEMS.COM SITE: I Portrait Displays ATIE POINT O NEW SPLICE CASE EXISTING SPLICE CASE 1-j NEW BULLET PED ElEXISTING BULLET PED ff�o ff� NEW DOG HOUSE EXISTING DOG HOUSE NEW VAULT EXISTING VAULT ❑ LOCKBOX JUNCTION BOX CORE DRILL • FIREWALL PENETRATION ADDRESS REV. I I DATE 111REPAIREDBY:1 C.HENDRICKSON DATE: 1 7/26/19 POTENTIAL HARD SURFACE RESTORATION LOCATION DIG AND INTERCEPT LOCATION • UTILITY POTHOLE 5' x 3' BORE PIT GAS WATER PHONE FIBER ELECTRIC SEWER STORM DRAIN 123 2ND AVE S STE 200 EDMONDS WA 98020 LEGEND SHEET NUMBER: 2 OF 6 GENERAL NOTES: FIBER PLACEMENT NOTES: 1. ALL VAULTS / HANDHOLES TO BE EQUIPPED WITH SECURITY LIDS WITH LOCKING BOLTS. 2. GROUND RESTORATION/RIGHT-OF-WAY SHALL BE RESTORED TO ORIGINAL OR BETTER CONDITION. 3. ALL 90 DEGREE BENDS IN CONDUIT CONSTRUCTION WILL BE A MINIMUM OF 36' RADIUS UNLESS SPECIFIED OTHERWISE. 4. BURIED FIBER OPTIC WARNING SIGNS SHALL BE PLACED AT EACH SIDE OF ALL ROAD CROSSINGS, AT CULVERTS, DITCHES AND IN A STRAIGHT LINE OF SIGHT SPACING OF APPROXIMATELY 500 FEET. 5. DEVIATIONS FROM THE ENGINEERED ROUTE REQUIRES A PROJECT MANAGER AND RIGHT-OF-WAY OWNER OR CARETAKER APPROVAL PRIOR TO CONSTRUCTION. 6. WHERE PERMITS FROM STATE, COUNTY, CITY, RAILROAD OR GOVERNMENT AGENCIES ARE REQUIRED, ALL WORK PERFORMED WILL COMPLY WITH THESE AGENCIES STANDARD SPECIFICATIONS. 7. THE PROJECT MANAGER WILL NOTIFY BUILDING MANAGEMENT WHEN WORK WILL BEGIN ON BUILDING. CONTRACTOR TO COORDINATE ROOM ACCESS AND WORK START AND STOP TIMES WITH BUILDING MANAGEMENT. 8. THE PROJECT MANAGER IS TO BE NOTIFIED BY THE CONTRACTOR 24 HOURS PRIOR TO CONSTRUCTION. SEE COMPANY CONTACT LIST FOR CONTACT NAME(s) AND TELEPHONE NUMBER(s). 9. THE PROJECT MANAGER WILL RESERVE THE RIGHT TO INSPECT AT ANY TIME THE WORK BEING PERFORMED BY THE CONTRACTOR. IF PROJECT MANAGER DETERMINES THAT THE WORK IS NOT BEING PERFORMED TO MINIMUM QUALITY STANDARDS, THEN THE CONTRACTOR SHALL PROVIDE REWORK AT HIS OWN COST. 10. ANY CHANGE IN PROJECT SCOPE, INCLUDING BUT NOT LIMITED TO, CONDUIT LENGTH, CONDUIT PATH, AERIAL PATH ETC., MUST BE APPROVED BY THE PROJECT MANAGER. 11. ALL CORING/CONSTRUCTION THAT WILL CAUSE NOISE AND/OR VIBRATION SHALL BE DONE WITHIN ALLOWED (9AM-3PM) BUSINESS HOURS. 12. ANY AND ALL UNDERGROUND UTILITIES ENCOUNTERED ARE THE RESPONSIBILITY OF THE CONTRACTOR TO LOCATE, PROTECT, AND REPAIR, IF DAMAGED. 13. ALL FOOTAGES ARE BASED ON FIELD GATHERED MEASUREMENTS, AS SUCH SOME VARIANCE SHOULD BE ANTICIPATED. ADJUST AS NEEDED. 14. ALL BURIED CONDUIT/CABLE WILL BE PLACED AT 36" MINIMUM COVER. SITE HAS POTENTIAL FOR ROCK THAT WOULD PREVENT THE ABILITY TO PROVIDE THE MINIMUM COVER. IN CASES WHERE THE MINIMUM COVER CAN NOT BE ACHIEVED, THE CONDUIT SHALL BE PLACED IN A SCH 40 EMT SLEEVE OR APPROVED EQUIVALENT. 15. WATER, SEWER, STORM SEWER AND EASEMENT LOCATIONS ARE BASED OFF OF CITY MAPS,NOT FIELD VERIFIED. 16. BORING OF AC PAVING IS REQUIRED AT ALL LOCATIONS AS INDICATED ON PLANS. 17. AT NO TIME SHALL CURBS, GUTTERS OR HANDICAP BE DISTURBED. 18. DOOR HANGERS ARE TO BE PLACED A MINIMUM OF 72 HOURS PRIOR TO START OF CONSTRUCTION WHEN APPLICABLE. 19. PRIOR TO START OF CONSTRUCTION, CONTRACTOR SHALL PLACE MESSAGE BOARDS STATING LANE CLOSURES, AND DELAYS A WEEK IN ADVANCE. LOCATION OF THE MASSAGE BOARD SHALL BE COORDINATED WITH THE CITY INSPECTOR AT THE PRE -CONSTRUCTION MEETING. 20. LANE CLOSURES CANNOT EXCEED MORE THAN 300 FT. AT A TIME. FOR SAFETY PURPOSES THERE SHALL BE ONLY ONE CLOSURE AT A TIME ALONG INTERNATIONAL BLVD. MORE FLAGGERS WILL BE NECESSARY TO HELP VEHICLES AND PEDESTRIANS IN THE WORK ZONES DURING THE LANE CLOSURES. 1. CONTRACTOR IS RESPONSIBLE FOR LOCATING ALL UTILITIES 48 HOURS PRIOR TO CONSTRUCTION ACTIVITY SEE LOCAL DIRECTORY FOR CONTACT TELEPHONE NUMBER OF LOCAL CALL BEFORE YOU DIG AGENCY. 2. CONTRACTOR SHALL RECORD SEQUENCE # OF FIBER CABLE AT EVERY WORK POLE, MANHOLE, FIBER STORAGE LOOP AND TAIL LOCATION. CONTRACTOR TO PROVIDE PROJECT MANAGER WITH SEQUENCE NUMBERS AT PROJECT COMPLETION. 3. SLACK LOOP AND SNOWSHOE STORAGE LOCATIONS SHALL BE DETERMINED ON CONSTRUCTION DRAWINGS, HOWEVER, REEL LENGTHS OF FIVE HUNDRED FEET (500') OR LESS ON LARGE COUNT FIBER OR THREE HUNDRED FEET (300') OR LESS ON SMALL COUNT FIBER ARE DIFFICULT TO USE AND SHOULD BE PLACED AS FSL'S, NOT CUT AND RETURNED. 4. FIBER OPTIC IDENTIFICATION TAGS SHALL BE PLACED AT EVERY WORK POLE, MANHOLE, FIBER, STORAGE LOOPS, SPLICE CASES AND WHERE INDICATED BY PROJECT MANAGER. TAGS NEED TO BE PLACED SO AS TO BE READ FROM THE GROUND. S. CABLE LUBRICATION SHALL BE USED TO REDUCE PULLING TENSION. LUBRICANTS MUST NOT CONTAIN ANY PETROLEUM PRODUCTS. 6. A 100 FOOT FIBER COIL MUST REMAIN IN ALL VAULTS UNLESS OTHERWISE NOTED. 7. ALL BURIED INFRASTRUCTURE MUST BE ACCOMPANIED WITH WARNING TAPE AND A TRACER WIRE, AT RISER POLES THE LOCATE WIRE SHALL BE ACCESSIBLE AT THE BASE OF THE RISER. 8. ALL RISERS WILL BE CAPPED AT ALL TIMES. 9. ALL FIBER SHALL BE MARKED AS TO DIRECTION IN EACH VAULT. RED -NORTH, GREEN-SOUTH,YELLOW-EAST, AND BLUE -WEST. DO NOT TAPE FIBER CABLES TOGETHER IN RISER. DISCLAIMER: 1. IT IS THE RESPONSIBILITY OF THE CONSTRUCTION CONTRACTOR TO VERIFY ALL RIGHT OF WAY BEFORE CONSTRUCTION IS TO BEGIN. NO UNDERGROUND INSTALLATION REPRESENTED WITHIN THESE PLAN SHEETS IS PROPOSED OUTSIDE OF THE RIGHT OF WAY. 2. THE UNDERGROUND ROUTE DEPICTED IS PRELIMINARY AND WILL/MAY VARY ONCE UTILITIES HAVE BEEN FIELD LOCATED. 3. ANCHORING FOR THE AERIAL CONSTRUCTION IS TYPICALLY DETERMINED DURING CONSTRUCTION AND IS COLLECTED IN THE AS -BUILT PHASE. JB-127924 SITE: Portrait Displays ADDRESS: 123 2ND AVE S STE 200 EDMONDS WA 98020 GENERAL NOTES 1� CONSTRUCTION SUPERVISOR- CASEY BROWN (425)-754-0064 CASEY_BROWN2QCABLE.COMCAST.COM cyst FIELD OPERATIONS - MULE SNOWDON (906)-282-3670 MIKE.SNOWDONQCCISYSTEMS.COM REV. DATE SHEET NUMBER: 3 O F 6 CPREPAIREDBY: .HENDRICKSON ATE: 7/26/ 1 9 SCOPE OF WORK POINT OF 2 2.1) FROM TIE POINT SP.WALY.0760 ENTRY BURY NEW 2" CONDUIT AND 48CT _ FOC. CORE INTO ELECTRIC ROOM. wmkL JB-127924 limp Ccomcast. CONSTRUCTION SUPERVISOR- CASEY BROWN (425)-754-0064 CASEY_BRO W N2QCABLE.COMCAST.COM 5systems FIELD OPERATIONS - MllCE SNOWDON (906)-282-3670 MIICE.SNOWDONQa CCISYSTEMS.COM (88') SITE: I Portrait uisplays TIE-IN SP.WALY.0760 ADDRESS REV. DATE awl IPREPAIREDBY] C.HENDRICKSON DATI E: 1 8/16/19 123 2ND AVE S STE 200 EDMONDS WA 98020 RIGHT OF WAY SHEET NUMBER: 4 OF 6 �- City of Edmonds JB 127924 / 7-322 7-7- 0 ' qw Lyn- 9 Mountlake ' o 7- 253 7-2 Legend Storm Catch Basins 7- - 7/ •%� ❑ <all other values> n Yes • • � - ;5: �. ♦ a • ^® 1 1�2 FS� • Storm Manholes p <all other values> /= f1 �. �r �k79 � / riJ���'" • {7- 0 Yes • • - 749 �O -'S Detention Facilities Culvert V / F. <all other values> ' ��... o Yes 55 L � . 32F Facility Feature Creeks 1"•p_ p� 1 / al 7 Storm Line <all other values> * ' 7 32 E Yes PD7-64 PD7-11 V . ' A Facility Lines 7 1 27 7- 2 9 F Storm Ditch Hydrants 7-1 1� J 7-128 7- ��7�PD7-12 r 7Q q0 i`� -2 / E h� f34 7-- _ « Edmonds C( Other 7-31 A 414 I PRV Valves I - 3 L. L'S1 1033 _ . L� j+� - Cb ` OPEN ;, CLOSED Ell owoffs hk - Cl t 1: 1,126 7-1310_ Notes 0 46.91 93.8 Feet This map is a user generated static output from an Internet mapping site and is for reference only. Data layers that appear on this map may or may not be accurate, WGS_1984_Web _Mercator _Auxiliary © City of Edmonds -Sphere current, or otherwise reliable. THIS MAP IS NOT TO BE USED FOR DESIGN OR CONSTRUCTION ALLEY BETWEEN 2ND AVE S&3RDAVE S Additional signage to be placed at cross street- alley between Main St & James St- \` W20-1, W21-7,W20-7A ROAD + WORK �z AHEAD wz0-1 UTILITY WORK AHEAD + * W21 7 I OR + P ED !,P ST Q� W20-713 (OPTIONAL IF 40 MPH OR LESS) W20-7A Appllcarii sYiall reps Ir/replace all cla maga io �a i111i1a Tro ritaga p-mperov merlin 11-'i ClYay 19 riY-oT-wa er itv sta r,dardz xr, @� �i.- OR occurs duri rig the permit a protect_ ROAD TRUCK MACHINERY CROSSING AHEAD W21-3 W8-6 W11-2 * OR OTHER APPROPRIATE WARNING SIGNS LEGEND FLAGGING STATION - RECOMMENDED DI SIGN LOCATION ® ® 0 CHANNELIZING DEVICES (OPTIONAL) RM � A N O 4 N O 00 ON SIGN SPACING = X (FEET) ( 1 ) RURAL HIGHWAYS 60 / 65 MPH 800't RURAL ROADS 45 / 55 MPH 500't RURAL ROADS & URBAN ARTERIALS 35 / 40 MPH 350'i RURAL ROADS, URBAN ARTERIALS 25 / 30 MPH RESIDENTIAL & BUSINESS DISTRICTS 200't (2) URBAN STREETS 25 MPH OR LESS 100't (2) ALL SIGNS ARE 48" x 48" BLACK ON ORANGE UNLESS OTHERWISE DESIGNATED. (1) All spacing may be adjusted to accommodate intersections and driveways. (2) This spacing may be reduced in urban areas to fit roadway conditions. W20-7A W20-7B (OPTIONAL IF 40 MPH OR LESS) W21-7 UTILITY * old _ WORK i W20-1 AHEAD ROAD WORK AHEAD NOTES 1. Night work requires additional roadway lighting at flagging stations. 2. Coordinate with Region Traffic office for work hours and stop durations 0 0 N CD Cn S O i;- CD 3 v 0 Cn O E CD [n TJ N y 3. The roadway in the work area shall have no materials, equipment, rt or restrictions until both flaggers have stopped traffic, and before p flaggers release traffic. a TYPICAL SHORT TERM TRAFFIC STOP WITH FLAGGERS TCP 20 AP P FZOV �� O 3 f0 ut