Loading...
ENG2020-0223OF WAY EUC PERMIT PERMITNUMBER, City of Edmonds AveRIGHT 9:0ENG2020-0223 F31 www.cityofedmonds.gov Description: COMCAST-BORE FOR 2" CONDUIT AND PLACE CARSON ISSUED: 09/01/2020 Address: 18416 HIGH ST EDMONDS WA 98020-2341 EXPIRES: 03/01/2021 rmit Type: RIGHT OF WAY EUC Permit Subtype: MINOR Parcel Number: 00565600100200 i NAME TYPE NAME ADDRESS PHONE APPLICANT COMCAST 1525 75TH ST SW, EVERETT WA 98203 (425)921-8201 CONTRACTOR PRINCE TELECOM 13701 24TH ST E, BLDG G, SUMNER WA98390 OWNER MCMAHON GEOFFREY P & 18416 HIGH ST, EDMONDS WA98020 VANDERHEI DEBORAH L FEE•• DESCRIPTION AMOUNT PAID CITY TECHNOLOGY FEE CHARGED PER PERMIT $40.00 $0.00 ENGINEERING INSPECTION FEE $110.00 $0.00 RIGHT OF WAY MINOR - EUC PERMIT FEE $110.00 $0.00 • REQUIREMENT TYPE NOTES TRAFFIC CONTROL Traffic control and public safety shall be in accordance with City regulations as required by the City Engineer. Every flagger must be trained as required by WAC 296-155-305 and must have certification verifying completion of the required training in their posession. RESTORATION Restoration is to be in accordance with City codes. All street -cut trench work shall be patched with asphalt or City approved material prior to the end of the workday - No Exceptions WARRANTY The contractor is responsible for workmanship and materials for a period of one year following the final inspection and acceptance of the work. 77 INSPECTION SCHEDULING: WWW.MYBUILDING PERMIT.COM 24 HR NOTICE REQUIRED INDEMNITY The Applicant has signed an application which states he/she holds the City of Edmonds harmless from injuries, damages or claims of any kind or description whatsoever, foreseen or unforeseen, that may be made against the City of Edmonds or any of its departments or employees, including but not limited to the defense of any legal proceedings including defense costs and attorney fees by reason of granting this permit. THIS DOCUMENT IS NOT VALID UNTIL FEES ARE PAID AND THE CITY ENGINEER OR HIS/HER DEPUTY HAS SIGNED BELOW 9/1 /2020 RELEASED BY DATE Printed: Tuesday, September 01, 2020 9:47:35 AM 1 of 2 -1RRRTF WAY EUC PERMIT City of • • • •:• •ENG2020-0223 ., CONDITIONS CONDITION TYPE Easement and/or permission from adjacent property owner is required prior to entry or work within ADJACENT PROPERTY an adjacent property. Contractor/Owner shall be responsible for repair/replacement of all damage to utilities and/or DAMAGE TO FRONTAGE frontage improvements in city right of way per city standards that is caused by or occurs during the IMPROVEMENTS permitted project. Alert affected residents and/or businesses prior to work start. Verify clear bore crossings. ENGINEERING OTHER Restore landscape to like or better conditions. Call for required inspections as noted. ESC REQUIRED Maintain erosion & sediment control per city standards. Applicant on behalf of his or her spouse heirs assigns and successors in interests, agrees to indemnify defend and hold harmless the City of Edmonds, Washington, its officials, employees, and agents from HOLD HARMLESS any and all claims for damages of whatever nature, arising directly or indirectly from the issuance of this permit. Issuance of this permit shall not be deemed to modify, waive or reduce any requirements of any City ordinance nor limit in any way the City's ability to enforce any ordinance provision. Sound/Noise originating from temporary construction sites as a result of construction activity are exempt from the noise limits of ECC Chapter 5.30 only during the hours of 7:OOam to 6:OOpm on SOUND OR NOISE weekdays and 10:OOam to 6:OOpm on Saturdays, excluding Sundays and Federal Holidays. At all other times the noise originating from construction sites/activities must comply with the noise limits of Chapter 5.30, unless a variance has been granted pursuant to ECC 5.30.120. UNDERGROUND UTILITY Call for locates of underground utilities prior to any excavation. LOCATES • �� INSPECTION TYPE DATE RESULT NOTES lip COMPLETE X-2 ENGINEERING FINAL** E-7 RESTOR LIMITS Printed: Tuesday, September 01, 2020 9:47:35 AM 2 of 2 0 \:L L?,11(7. "'VC. I S'� J ROW PERMIT NO.: ENG 2020-0223 ISSUE DATE: 9/l/20 RIGHT-OF-WAY CONSTRUCTION PERMIT APPLICATION PROJECT NAME: COMCAST # 731167 CONTRACTOR: PRINCE TELECOM Mailing Address: 13701 24TH ST E BLDG G SUMNER, WA 98390 State License #: PRINCTL862PS City Business License #: ADDRESS OR INTERSECTION OF CONSTRUCTION: CONTACT: COMCAST C/O JOURDEN LAWRENCE Phone #: 425-967-1158 Fax #: Email #: jourden_lawrence@comcast.com X❑ Liability Insurance X❑ Bonded ROW WORK ASSOCIATED WITH THE FOLLOWING TYPE OF PROJECT: ❑ Commercial ❑ Subdivision ❑ City Project ❑ Traffic Control (Only) ❑ Multi -Family ❑ Single Family ❑ Other X❑ EUC (PUD, VERIZON, PSE, COMCAST, OVWSD): Is this permit part of a blanket permit? ANY ASSOCIATED PERMITS? ❑ Yes X❑ No BLD# ENG# DESCRIPTION OF PROPOSED WORK (Be Specific) : Contractor to start bore at the pole northwest side of 18403 High St and bore south for 70' and con't west for 29' of 2" conduit and place Carson on 18416 High St Property line. Revised route will ensure a min of 5' horizontal seperation of all mains, and 1 Oft horizontal of utility structures. Tie in at existing CATV PED, The 7" flush mount carson to be placed on customer property line WAS STREET OVERLAYED WITHIN THE LAST FIVE 5 YEARS? YES ❑ NO ❑ Year: PAVEMENT CUT: ❑ Yes ❑X No If yes, indicate size of cut: CONCRETE CUT: ❑ Yes ❑X No If yes, indicate size of cut: x x RIGHT-OF-WAY CLOSURE AREA TOTAL DURATION (NUMBER OF MONTHS) Sidewalk 48 Hrs + LF X LF SF Alley 72 Hrs + LF X LF SF Parking 72 Hrs + LF X LF SF APPLICANT TO READ AND SIGN *Traffic control and public safety shall be in accordance with City regulations as required by the City Engineer. Every flagger must be trained as required by (WAC) 296-155-305 and must have certification verifying completion of the required training in their possession. *Restoration is to be in accordance with City codes and Standards. All street -cut trench work shall be patched with asphalt or City approved material prior to the end of the workday — NO EXCEPTIONS. Indemnity: The Applicant has signed an application which states he/she hold the City of Edmonds harmless from injuries, damages or claims of any kind or description whatsoever, foreseen or unforeseen, that may be made against the City of Edmonds or any of its departments or employees, including defense costs and attorney fees by reason of granting this permit. I have read the above statements and understand the permit requirements and acknowledge that I must follow all requirements in order for the permit to be valid. SIGNATURE ' g -L'� DATE 8/27/2020 Contractor or Agent NO WORK SHALL BEGIN PRIOR TO PERMIT ISSUANCE SIGN SPACING = X (1) RURAL ROADS & URBAN ARTERIALS 35 140 MPH 350't RURAL ROADS, URBAN ARTERIALS, 25 130 MPH 200't (2) RESIDENTIAL & BUSINESS DISTRICTS URBAN STREETS 25 MPH OR LESS 1001t (2) (1) ALL SPACING MAY BE ADJUSTED TO ACCOMMODATE INTERSECTIONS AND DRIVEWAYS. (2) THIS SPACING MAY BE REDUCED IN URBAN AREAS TO FIT ROADWAY CONDITIONS. MINIMUM SHOULDER TAPER LENGTH = L/3 (feet) SHOULDER Posted Speed (mph) WIDTH (feet) 25 30 35 40 45 50 55 60 65 70 8' 40 40 60 90 - - - - - - 10' 40 60 90 90 USE A 3 DEVICES TAPER FOR SHOULDERS LESS THEN 8' APPIIcarst s1�a11 ra Palr/ra Place all cfamaga to ut111tlas or Fro rataga IN Pc ov smerats Ira Gity rig causeor occ asy to r�cJa rds that t J ur cJurtr�g the parmttte J project_ BUFFER DATA LONGITUDINAL BUFFER SPACE = B SPEED (MPH) 25 30 35 40 45 50 55 60 65 70 LENGTH (feet) 155 200 250 305 360 425 495 570 645 730 TRANSPORTABLE ATTENUATOR ROLL AHEAD DISTANCE = R HOST VEHICLE WEIGHT 9,900 TO 22,000 lbs. HOST VEHICLE WEIGHT > 22,000 lbs. < 45 MPH 45-55 MPH > 55 MPH < 45 MPH 45-55 MPH > 55 MPH 100 PROTECTIVE VEHICLE (WORK VEHICLE) = R NO SPECIFIED DISTANCE REQUIRED CHANNELIZATION DEVICE SPACING feet MPH TAPER TANGENT 35/40 30 60 25/30 20 40 O 9 b 4 ® ® �¢ WORK AREA X X L/3 B R 50, 48' ROAD A P P Ifs O V O WORK <WO>R AHEAD 48' W20-1 W21-5 I III I IIIII NOTES LEGEND 1. DEVICE SPACING FOR THE DOWNSTREAM TAPER SHALL BE 20'(FT). K TEMPORARY SIGN LOCATION DER CLOSURE -LOW SPEED 2. ALL SIGNS ARE BLACK ON ORANGE. O CHANNELIZING DEVICES (40 MPH OR LESS) PROTECTIVE VEHICLE YNOT TO SCALE FILE NAME S:\Desi n R P& SW-Standardsl2-Plan Sheet Libra 101-Published PSL\ TC Work Zone Traffic Control\ TC-5 Shoulder Closure - Low Speed (40 MPI= or Less)\TC-5.dgn Plot 1 TIME 2,59,41 PM sT"Ts FED.AID PROJ.NO. Amokxnx asr DATE 1/212018 Y�/� PLOTTED BY Ilddslf AS �I/ TCSro DESIGNED BY h � +w xuse ENTERED BY Washington State sxra. CHECKED BY Department of Transportation or PROJ. ENGR. T. "<.E TRAFFIC CONTROL PLAN xx� MAINTAIN MINIMUM 5' HORIZONTAL AND 'I'VERTICAL SEPARATION FROM ALL CITY UTILITIES. 731168 GEOFF MCMAHON 18416 HIGH ST EDMONDS SECTIONS: COVER PAGE 1 SOW OVERVIEW DETAIL 2 SOW DETAIL VIEW 3 CONTACTS: Area Manager Ron Grosvenor(253)254-9658 ESS COMCAST Jourden Lawrence (425)967-1158 SITE CONTACT ANGELIQUE LOISELLE (206)641-9903 SOW DETAIL VIEW 4 LEGEND ® Tie in Point Bore Path New Flush Mount Carson Bore/Drill New UG = 99 Trench New UBuilding New OH = Overlash = Existing UG = Riser = New Building Interior= New Building Exterior= TOTALFOOTAGE 99 x Cut To Expose Utilities BUII Attachment Drop Path New Lock Box New Pedestal POE VERIFY CLEAR BORE CROSSINGS. RECEIVED 8/20/20 18401 40 w NEW FLUSH MOUNT CARSON 7 18411 M� 1 84 1 ? BORE PATH FOR 99' r SO 1 287 CONDUIT. ALL SILL BSTRU- V 18 4 18 4 1,3 4-30 Qy� 431 4.28 4-27 8 I ! IV ?CIARSON Cs93 ye Af PwA / fB A". BORE PATH FOR 99' ALL SUBSTRUCTREI 36" COVER. /r RoAo COVER SHEET DATE IBY: REASON: 'P"6kON DESCRIPTIONS 6/22/2020 ANGELIQUE LOISELLE DROP BURY ENGINEERED FOR: REVISION REgUEST:Contractor to start bare at the pole northwest side of 18403 High St and bore soutM1 for ]0' and con't west for 29' of 2" conduit antl place Carson on ComcQst. 18416 High St Property line. Revised route will ensure a min of S' horizontal seperation of all mains, and 10ft horizontal of utility structures. Tie in at existing CAN PED, The 7" flush mount carson to be placed on customer property line From: Loiselle, Ancieliaue To: Edmonds Engineering Permits Cc: Moore, Michele; Lawrence, Jourden Subject: Re: Permit application for 18416 High St Edmonds, WA - Comast # 731168 (ENG2020-0223) Date: Thursday, August 20, 2020 12:23:14 PM Attachments: imaae001.pna 731168 PLANSET REVISION 2.pdf Good afternoon Natalie, I have attached a revised planset and answers to your questions are listed below in blue. • The site plan does not show all utilities in the High St ROW. In addition to the City water main, there is a City sewer main and a City storm main. Please revise to show all utilities. All utilities are now included on the revised planset. • The revised plans show a perpendicular crossing and a bore path on the east side of High St that is parallel to the ROW. Please show that the minimum 5' horizontal and 1' vertical separation between the bore path/service and all City utilities can be achieved. Power and Gas are shown on the east side of the ROW. Make sure that the proposed bore path has at least 12" of horizontal separation from the gas main. Revised route will ensure a min of 5' horizontal separation of all mains, and 1Oft horizontal of utility structures. • Is the proposed flush monument in the ROW? If so, what are its dimensions? The 7"flush mount carson to be placed on customer property line • What is the tie in point? Is it an existing structure or will a new structure be placed? Please clarify. We will tie in at an existing CATV PED as I have added a picture in the top right corner of the planset. On Wed, Aug 19, 2020 at 3:13 PM Edmonds Engineering Permits <EngineeringPermits &.edmondswa.gov> wrote: Hi Michele, I have reviewed the revised plans showing the new proposed bore path, and I have the following comments: • The site plan does not show all utilities in the High St ROW. In addition to the City water main, there is a City sewer main and a City storm main. Please revise to show all utilities. • The revised plans show a perpendicular crossing and a bore path on the east side of High St that is parallel to the ROW. Please show that the minimum 5' horizontal and 1' vertical separation between the bore path/service and all City utilities can be achieved. Power and Gas are shown on the east side of the ROW. Make sure that the proposed bore path has at least 12" of horizontal separation from the gas main. • Is the proposed flush monument in the ROW? If so, what are its dimensions? • What is the tie in point? Is it an existing structure or will a new structure be placed? Please clarify. Let me know if you have any questions. Natalic City of Edmonds, Engineering Division Permitting EngineeringPermits anV edmondswa.gov Natalie Griggs, Engineering Technician (425) 771-0220 ext. 1353