Loading...
ENG2020-0387RIGHT OF WAY EUC PERMIT PERMIT NUMBER City of Edmonds 1 1 1 ' www.cityofedmonds.gov Description: OVWSD REPLACE WATER MAINLINE VALVE IN CONDO DWY NO ROAD CUT ISSUED: 10/02/2020 Address: 8025 234TH ST SW 101 EDMONDS WA 98026-9323 EXPIRES: 04/02/2021 Permit Type: RIGHT OF WAY EUC Permit Subtype: MINOR Parcel Number: 01041200010100 Isle] NAME TYPE NAME ADDRESS PHONE APPLICANT OLYMPIC VIEW WATER & SEWER ATTN: LYNNE DANIELSON, EDMONDS WA 98026 (425)774-7769 DISTRICT CONTRACTOR OLYMPIC VIEW WATER & SEWER ATTN: LYNNE DANIELSON, EDMONDS WA 98026 (425)774-7769 DISTRICT OWNER GIN HEATHER M 8025 234TH ST SW UNIT 101, EDMONDS WA 98026 FEE INFORMATION DESCRIPTION AMOUNT PAID CITY TECHNOLOGY FEE CHARGED PER PERMIT $40.00 $0.00 RIGHT OF WAY MINOR - EUC PERMIT FEE $110.00 $0.00 THIS DOCUMENT IS NOT VALID UNTIL FEES ARE PAID AND THE CITY ENGINEER OR HIS/HER DEPUTY HAS SIGNED BELOW 10/2/2020 RELEASED BY DATE Printed: Friday, October 02, 2020 4:35:49 PM 1 of 2 -KRWOF WAY EUC PERMIT PERMIT NUMBER City of • • • •:• •ENG2020-0387 www.cityofedmonds. ov/425.771.0220 CONDITIONS CONDITION TYPE Easement and/or permission from adjacent property owner is required prior to entry or work within ADJACENT PROPERTY an adjacent property. Contractor/Owner shall be responsible for repair/replacement of all damage to utilities and/or DAMAGE TO FRONTAGE frontage improvements in city right of way per city standards that is caused by or occurs during the IMPROVEMENTS permitted project. Alert affected residents and/or businesses prior to work start. Verify clear bore crossings. ENGINEERING OTHER Restore landscape to like or better conditions. Call for required inspections as noted. ESC REQUIRED Maintain erosion & sediment control per city standards. Applicant on behalf of his or her spouse heirs assigns and successors in interests, agrees to indemnify defend and hold harmless the City of Edmonds, Washington, its officials, employees, and agents from HOLD HARMLESS any and all claims for damages of whatever nature, arising directly or indirectly from the issuance of this permit. Issuance of this permit shall not be deemed to modify, waive or reduce any requirements of any City ordinance nor limit in any way the City's ability to enforce any ordinance provision. Sound/Noise originating from temporary construction sites as a result of construction activity are exempt from the noise limits of ECC Chapter 5.30 only during the hours of 7:00am to 6:00pm on SOUND OR NOISE weekdays and 10:00am to 6:00pm on Saturdays, excluding Sundays and Federal Holidays. At all other times the noise originating from construction sites/activities must comply with the noise limits of Chapter 5.30, unless a variance has been granted pursuant to ECC 5.30.120. UNDERGROUND UTILITY Call for locates of underground utilities prior to any excavation. LOCATES !IMOL INSPECTION TYPE DATE RESULT NOTES lip COMPLETE X-2 ENGINEERING FINAL** Printed: Friday, October 02, 2020 4:35:49 PM 2 of 2 OLYMPIC VIEW WATER & SEWER DISTRICT EDMONDS BLANKET PERMIT BEGINNING NOTIFICATION Site Address: 8025 2341h St SW Scope of Work: Replace 8" broken water mainline valve -Asphalt cut is in the driveway of the Breve condominiums. It will not be a road cut. Asphalt or Concrete Cut: Yes Start date: 10/6/2020 Olympic View Water & Sewer District 8128 228th ST SW Edmonds WA. 98026 Phone Number 425 774 7769 Fax Number 425 670 1856 Contact: Marty Henninger E-mail: marty@ovwater.com Olympic View Water & Sewer District 8128 228th ST SW Edmonds WA. 98026 Phone Number 425 774 7769 Fax Number 425 670 1856 Contact: Cody Gray E-mail: CodyG(ab-ovwater.com . Traffic control shall be in accordance with the MUTCD. . All flaggers shall be trained and certified as required by WAC 296-155-305. . Restoration shall be in accordance with City of Edmonds standards. • All asphalt or concrete cut surfaces shall be patched with City of Edmonds approved materials prior to the end of the day. Applicant shall repair/replace all damage to utilities or frontage improvements in City right-of-way per city standards that is caused or occurs during the permitted project. ENGINEERING DIVISION OWNER/CONTRACTOR IS RESPONSIBLE FOR APPROVED AS NOTED EROSION CONTROL AND DRAINAGE 10/02/2020