Loading...
The URL can be used to link to this page
Your browser does not support the video tag.
ENG2020-0399
RIGHT OF WAY EUC PERMIT City of • • • www.cityofedmonds.gov Description: ZIPLY CLOSING LANE ON 196TH TO VERIFY FACILITIES FOR 84TH ISSUED: 10/08/2020 Address: 8420 196TH ST SW EDMONDS WA 98026-6312 EXPIRES: 10/08/2021 rmit Type: RIGHT OF WAY EUC Permit Subtype: STANDARD Parcel Number: 27041900200100 Permit i NAME TYPE NAME ADDRESS PHONE APPLICANT ZIPLY FIBER 1800 41ST ST, EVERETT WA 98201 (425)949-0230 CONTRACTOR Pacific Cable Const PO Box 573, Woodinville wa 98072 OWNER PHYVE LLC 4728JEFFERSON HWY, NEW ORLEANS LA70121 FEE INFORMATION DESCRIPTION AMOUNT PAID CITY TECHNOLOGY FEE CHARGED PER PERMIT $40.00 $0.00 ENGINEERING INSPECTION FEE $220.00 $0.00 RIGHT OF WAY STANDARD - EUC PERMIT FEE $330.00 $0.00 • REQUIREMENT TYPE NOTES TRAFFIC CONTROL Traffic control and public safety shall be in accordance with City regulations as required by the City Engineer. Every flagger must be trained as required by WAC 296-155-305 and must have certification verifying completion of the required training in their posession. RESTORATION Restoration is to be in accordance with City codes. All street -cut trench work shall be patched with asphalt or City approved material prior to the end of the workday - No Exceptions WARRANTY The contractor is responsible for workmanship and materials for a period of one year following the final inspection and acceptance of the work. INSPECTION SCHEDULING: WWW.MYBUILDING PERMIT.COM 24 HR NOTICE REQUIRED INDEMNITY The Applicant has signed an application which states he/she holds the City of Edmonds harmless from injuries, damages or claims of any kind or description whatsoever, foreseen or unforeseen, that may be made against the City of Edmonds or any of its departments or employees, including but not limited to the defense of any legal proceedings including defense costs and attorney fees by reason of granting this permit. ', f RELEASED BY THIS DOCUMENT IS NOT VALID UNTIL FEES ARE PAID AND THE CITY ENGINEER OR HIS/HER DEPUTY HAS SIGNED BELOW 10/8/2020 DATE Printed: Thursday, October 08, 2020 4:22:55 PM 1 of 2 -KRWOF WAY EUC PERMIT City of • • • www.cityofedmonds. ov/425.771.0220 CONDITIONS CONDITION TYPE Easement and/or permission from adjacent property owner is required prior to entry or work within ADJACENT PROPERTY an adjacent property. Contractor/Owner shall be responsible for repair/replacement of all damage to utilities and/or DAMAGE TO FRONTAGE frontage improvements in city right of way per city standards that is caused by or occurs during the IMPROVEMENTS permitted project. Alert affected residents and/or businesses prior to work start. Verify clear bore crossings. ENGINEERING OTHER Restore landscape to like or better conditions. Call for required inspections as noted. ESC REQUIRED Maintain erosion & sediment control per city standards. Applicant on behalf of his or her spouse heirs assigns and successors in interests, agrees to indemnify defend and hold harmless the City of Edmonds, Washington, its officials, employees, and agents from HOLD HARMLESS any and all claims for damages of whatever nature, arising directly or indirectly from the issuance of this permit. Issuance of this permit shall not be deemed to modify, waive or reduce any requirements of any City ordinance nor limit in any way the City's ability to enforce any ordinance provision. Sound/Noise originating from temporary construction sites as a result of construction activity are exempt from the noise limits of ECC Chapter 5.30 only during the hours of 7:00am to 6:00pm on SOUND OR NOISE weekdays and 10:00am to 6:00pm on Saturdays, excluding Sundays and Federal Holidays. At all other times the noise originating from construction sites/activities must comply with the noise limits of Chapter 5.30, unless a variance has been granted pursuant to ECC 5.30.120. UNDERGROUND UTILITY Call for locates of underground utilities prior to any excavation. LOCATES • L INSPECTION TYPE DATE RESULT NOTES lip COMPLETE E-7 TRAFFIC CTRL X-2 ENGINEERING FINAL" Printed: Thursday, October 08, 2020 4:22:55 PM 2 of 2 .I OF EUA.1n. -,NC. I sc) u ROW PERMIT NO.: ENG ISSUE DATE: RIGHT-OF-WAY CONSTRUCTION PERMIT APPLICATION PROJECT NAME: CONTRACTOR: Pacific Cable Construction Mailing Address: PO Box 573, Woodinville, WA 98072 State License #: 3636CON1096 City Business License #: PACIFCC954PJ ADDRESS OR INTERSECTION OF CONSTRUCTION: CONTACT: Krystal Buoy & Mike HaKahan Phone #: 425-261-6488 & 425-949-0230 Fax #: Email #: kystal.buoy@ziply.com & mike.hakahan@ziply.com ❑ Liability Insurance ❑ Bonded ROW WORK ASSOCIATED WITH THE FOLLOWING TYPE OF PROJECT: ❑ Commercial ❑ Subdivision ❑ City Project ❑ Traffic Control (Only) ❑ Multi -Family ❑ Single Family ❑ Other [V EUC (PUD, VERIZON, PSE, COMCAST, OVWSD): Is this permit part of a blanket permit? ANY ASSOCIATED PERMITS? ❑ Yes [V7 No BLD# ENG# DESCRIPTION OF PROPOSED WORK (Be Specific) : Ziply to close lane temporarily along 196th St SW especially in vicinity of 84th Ave W to perform facilities verification for project design with Jaime Hawkins. WAS STREET OVERLAYED WITHIN THE LAST FIVE (5) YEARS? YES ❑ NOM Of Year: PAVEMENT CUT: ❑ Yes [V� No If yes, indicate size of cut: x CONCRETE CUT: ❑ Yes q No If yes, indicate size of cut: x RIGHT-OF-WAY CLOSURE AREA I TOTAL DURATION (NUMBER OF MONTHS) Sidewalk 48 Hrs + LF X LF SF Alley 72 Hrs + LF X LF SF Parking 72 Hrs + LF X LF SF APPLICANT TO READ AND SIGN *Traffic control and public safety shall be in accordance with City regulations as required by the City Engineer. Every flagger must be trained as required by (WAC) 296-155-305 and must have certification verifying completion of the required training in their possession. *Restoration is to be in accordance with City codes and Standards. All street -cut trench work shall be patched with asphalt or City approved material prior to the end of the workday — NO EXCEPTIONS. Indemnity: The Applicant has signed an application which states he/she hold the City of Edmonds harmless from injuries, damages or claims of any kind or description whatsoever, foreseen or unforeseen, that may be made against the City of Edmonds or any of its departments or employees, including defense costs and attorney fees by reason of granting this permit. I have read the above statements and understand the permit requirements and acknowledge that I must follow all requirements in order for the permit to be valid. SIGNATURE DATE 10/7/2020 Contractor or Agent NO WORK SHALL BEGIN PRIOR TO PERMIT ISSUANCE NOTIFY ENGINEERING PRIOR TO START OF WORK SO INSPECTOR HOAo �o AND TRANSPORTATION i ENGINEER CAN BE ON SITE TO INSPECT AHE WEAD TRAFFIC CONTROL. o n ©l SIDEWALK CLOSED AHEAD UP z -ANNELIZING DEVICE SPACING (ET) CD MPH TAPER TANGENT 40 80 0 105 150 205 11 115 165 225 180 245 ENGINEERING DIVISION APPROVED AS NOTED %?.2t OXE 10/08/2020 TRAFFIC CONTROL APPROVAL ONLY PER TRANSPORTATION ENGINEER BERTRAND HAUSS o� W1-4(L) © o�Q 84TH AVE W LIGHTED ARROW BOARD REQUIRED Applicant shall repair/replace all damage to utilities or frontage improvements in City right-of-way per city standards that is caused or occurs during the permitted project. OWNER/CONTRACTOR IS RESPONSIBLE FOR EROSION CONTROL AND DRAINAGE �o Do O O D LANE ? AHEAD °o W LIGHTED ARROW +� ROAD BOARD REQUIRED WOR SS/55 MPH LxP" L.L,nj1.,,vs RURAL ROADS 45 55 MPH URBAN ARTERIALS 35/40 MPII— URBAN STREETS RESIDENTIAL & 25/3C MPH 200" — BUSINESS DISTRICTS ZIPLY TRAFFIC CONTROL PLAN CLOSE RIGHT LANE TEMPORARILY 10/7/2020 W0869680 date ro iect a 00 00 >TH ST SW PERMIT I MUNICIPALITY: CITY OF EDMONDS - _ - - ❑ BLANKET ❑NO PERMIT REQUIRED CONSTRUCTION NOTES ® ❑ DETAILRED(NOT BLANKET) • The purpose of this project is to perform a field audit of existing facilities to see if there) rR� JOINT POLE are conflicts with a proposed city light base. JFN/NJUNS TICKET u ' • The City of Edmonds will be placing a new pedestrian light pole at the NE & SE POLE OWNER: intersection corners with 84th Ave W by digging down for a new concrete base. I FROM: I �RM� • Please audit MH10 as shown on page 4 to see if any Ziply infrastructure heads west CONSTRUCTION REQUIREMENTS from that point, or if the duct bank does not exist heading westward. ' ❑ FLAGGING • Please verifythe cables the l vicinity tokthe ❑ BRUSHING e aerial caes wgeneral y make sure y are ❑CONTRACTOR accounted for, especially all around the NE corner of 84th Ave W. I POINTS OF CONTACT • A circular bullseye has been placed at X-CONN DCD on the west and MH10 on the SCHEDULING:JOHN WOOD - 425-261-1412 east. There is no recorded underground duct bank system listed in between these ENGINEER: MIKE HAKAHAN -425-949-0230 FACILITIES: PATRICK WINKLER - 425-263-4010 two points. The only underground shown is to the west of X-CONN DCD and to the CUSTOMER CONTACT: east of MH 1 0. CALL BEFORE YOU DIG! - 811 • All underground or direct buried cables shown in records have been emphasized with 1 CONSTRUCTION START: red font. I IN SERVICE DATE: Stay safe and have a great day! 1 ; I CERTIFY THAT THE WORK I COMPLETED ON THIS WORK ORDER AND 2422.10 ; JD 360 I AS -BUILT IS IN COMPLIANCE WITH FRONTIER QUALITY STANDARDS AS AE 6 24 a IDENTIFIED ON THE IPQIP CHECKLIST. 216 YJD H6003 = %� CO I 2421.101 -SIT (SIGNATURE AND DATE) 901 CQF 2700 C95ES DC 00 1 / 2423.101\ II ' SS 9 14 I UNITS/ACCT CODES / AEF 200 24 4-4"PVC I I 2422.10 2422.101�I AEF 25 AKF 25 24 HLLKWAXX22 HLLKWAXX 22A_� —---®----- --- O 196TH S f SW --- / ® HLLKWAXX 2 HL KWAXX 2 �- 16 YJD H6003 SS900 2421.101 024 500 i 500 2421.101 2422.10— AKF 900 24 I AEF 100 24 2421.101 I AKF 900 24 2421.101 SS 900 24 Wai I / REVISIONS I I 1 ziply HLLK-INQ duct bank audit for ped x-ing light base MH audit and aerial cables verification �` / / NUMBERPROJECT W0869680 C.O. AREA, 51419 EXCH.CODE: WA HALLS LAKE DRAWN DATE: 1011/2020 ENGR: MIKE HAKAHAN PHONE: 425.949-0230 CNTY: Snohomish FILE: W0869680.DWG X / SCALE, 1:100 TAX DISTRICT: ---- DWG 1 OF 4 � TWNSHP: ---- RNG, -�-- SEC: ® ® I /—YJD 360 2421.10 SS 300 24 8 YGD T14,9-16 2421.101 —. 4 FTTP PIGTAIL 150OFT SS 9 24 I I HLLKWAXX I 534 HLLK X 2 2422.1011 500 2422.10 `j 4-15 GCMB-1 � AEF 25 24 AKF 25 24 I HILL WAXX 2 .0 HLLKWAXX 2 HLLKWAXX 22A �I � iII-ILKWAXX 221 Snn ----------------------- 196TH ST SW HLLKWAXX j V1dA<X 521 a / 522 1-49 2-15 o',' I I I I I �tl 8 YGD T14,9-16 8 YGD T14,9-16 2421.101 SS 900 24 2421.101 SS 300 24 HLLKWAXX 19 500 JD 360 H6003 2421.101 AE 25 26 2421.101 AE 25 24 2421.101 AE 50 26 2421.101 AKF 50 24 � III IIII -(RM I 72 YJD H6004 2423.10 i AKF 100 26 'V HLLKWAXX 18 I IC14 I 500 rl_ 1-1_. 196TH ST SW 2423.101 AKF 25 26 II UNITS/ACCT CODES I II REVISIONS I ziply HLLK-INQ duct bank audit for ped x-ing light base MH audit and aerial cables verification PROJECT NUMBER: : W0869680 XCH.: WA HALLS LAKE EXCH.0 ODEWAH DRAWN DATE 1011/2020 ENGR: MIKE HAKAHAN PHONE:425.949-0230 CNTY: Snohomish FILE: W0869680.DWG SCALE, 1:100 TAX DISTRICT: I DWG 2 OF 4 2 TWNSHP: ---- RNG, ISEC -- TRM ------ I I I 1RM I I LW� � IIan I ------- I 1 - I 2421.10 I I SS 400 24 1 81 YJD 1 it i �M I 60 YJD I I 2421.10 I �M FTTP MULTIPORT AE 600 24 1 I I I I I I i FTTP MULTIPO T ---- I YGD T14,9-16 r----J RBN YJD 288 I I Ij i I 2422.10 AEF 50 24 2422.101 �tM I I I I 1 rRM SS 900 2 UNITS/ACCT CODES SS421.1 24 I ® I I �— 2421.101 �2 YJD H6004 ii 1 I SS 1200 24 o i 2423.107- , Ir I - — 8 YG > , I 2421.101 I `-- N i AEF 50 24 I I QI I W SS 300 2 00 SS 4 o �I ---��--- ----- 72 YJD H6004 --- 196TH S S - - LK4A-XX I ---- --- - ®� 3 505 o f I 8 YGD T14 1 HLLKWA 1 ®; r--- \\ C14 I Y D? FC1032,1-- 7RM - HLLKWAXX 1 Q I j � _ 500 oI I I -12421.10 4-169 00I i 10- SS 900 24 2421.10 I� 00 SS 300 24 � ( REVISIONS 196TH PL SW I 1 I ZI i I I fiber HLLK-INQ duct bank audit for ped x-ing light base I Wes- I I MH audit and aerial cables verification PROJEC I NUMBER: W0869680 C.O. AREA: WAH EXCH. CODE: WA HALLS LAKE DRAWN DATE: ENGR: MIKE HAKAHAN CNTY: Snohomish 10/112020 PHONE:425.949-0230 FILE: W0669680.DWG I SCALE, 1:100 ITAX DISTRICT: ---- DWG 3 OF 4 —rFi TWNSHP: IRN& --- SEC — SR $24 . I I \,O The above design from the City of Edmonds shows two pedestrian light crosswalk poles being installed at the NE and SE corners of the intersection with 196th St SW & 84th Ave W. Please determine if there might be an existing Ziply underground duct bank along the NE corner of this intersection. The below image is the duct bank that was found on the far east side of this project area. It was located to the east of MH10 (detail shown on this page) between MH10 and 80th Ave W. Please audit MH10 with rodder if necessary to see if there are any ducts that travel west towards 84th Ave W. ] o M 48 O U U 196TH ST SW & 80TH AVE W WO UNKNOWN TYPE 4484TA L001 2 2100 HALES LAKE W.O,# DATE 3F001BP 1 27 94 )ATE: II UNITS /ACCT CODES I u27N4E18D REVISIONS ziply fiber HLLK-INQ duct bank audit for ped x-ing light base MH audit and aerial cables verification G S # M H 10 E A C # M H 0 4 PROJECT W0869680 C.O.AREA: 51419 NUMBER: EXCH.CODE: WA HALLS LAKE WAH DRAWN DATE: ENGR: MIKE HAKAHAN CNTY: Snohomish 10/112020 PHONE:425-949-0230 FILE: W0669680.DWG SCALE: 1:100 TAX DISTRICT: — I DWG 4 OF 4 TWNSHR — RNG: — SEC: —