Loading...
ENG2020-0439RIGHT OF WAY EUC PERMIT PERMIT NUMBER City of Edmonds -0439 www.cityofedmonds.gov Description: COMCAST-PROOF & PULL NEW CATV FROM VAULT 1 TO VAULT 2 ISSUED: 11/23/2020 Address: 229 MAIN ST EDMONDS WA 98020-3133 EXPIRES: 05/24/2021 rmit Type: RIGHT OF WAY EUC Permit Subtype: MINOR Parcel Number: 00434400700100 i NAME TYPE NAME ADDRESS PHONE APPLICANT COMCAST 1525 75TH ST SW, EVERETT WA 98203 (425)921-8201 CONTRACTOR Cablecom LLC 20021 120TH AVE NE, SUITE 101, BOTHELL WA 98011 (360)668-1300 OWNER WA FEDERAL SAVINGS 425 PIKE ST BR 137, SEATTLE WA 98101 FEE INFORMATION DESCRIPTION AMOUNT PAID CITY TECHNOLOGY FEE CHARGED PER PERMIT $40.00 $0.00 ENGINEERING INSPECTION FEE $110.00 $0.00 RIGHT OF WAY MINOR - EUC PERMIT FEE $110.00 $0.00 • REQUIREMENT TYPE NOTES TRAFFIC CONTROL Traffic control and public safety shall be in accordance with City regulations as required by the City Engineer. Every flagger must be trained as required by WAC 296-155-305 and must have certification verifying completion of the required training in their posession. RESTORATION Restoration is to be in accordance with City codes. All street -cut trench work shall be patched with asphalt or City approved material prior to the end of the workday - No Exceptions WARRANTY The contractor is responsible for workmanship and materials for a period of one year following the final inspection and acceptance of the work. INSPECTION SCHEDULING: WWW.MYBUILDING PERMIT.COM 24 HR NOTICE REQUIRED INDEMNITY The Applicant has signed an application which states he/she holds the City of Edmonds harmless from injuries, damages or claims of any kind or description whatsoever, foreseen or unforeseen, that may be made against the City of Edmonds or any of its departments or employees, including but not limited to the defense of any legal proceedings including defense costs and attorney fees by reason of granting this permit. THIS DOCUMENT IS NOT VALID UNTIL FEES ARE PAID AND THE CITY ENGINEER OR HIS/HER DEPUTY HAS SIGNED BELOW 11 /23/2020 :»•>/F9:1H ]1 DATE Printed: Monday, November 23, 2020 11:45:05 AM 1 of 2 -KRWOF WAY EUC PERMIT City of • • • www.cityofedmonds. ov/425.771.0220 CONDITIONS CONDITION TYPE Easement and/or permission from adjacent property owner is required prior to entry or work within ADJACENT PROPERTY an adjacent property. Contractor/Owner shall be responsible for repair/replacement of all damage to utilities and/or DAMAGE TO FRONTAGE frontage improvements in city right of way per city standards that is caused by or occurs during the IMPROVEMENTS permitted project. Alert affected residents and/or businesses prior to work start. Verify clear bore crossings. ENGINEERING OTHER Restore landscape to like or better conditions. Call for required inspections as noted. ESC REQUIRED Maintain erosion & sediment control per city standards. Applicant on behalf of his or her spouse heirs assigns and successors in interests, agrees to indemnify defend and hold harmless the City of Edmonds, Washington, its officials, employees, and agents from HOLD HARMLESS any and all claims for damages of whatever nature, arising directly or indirectly from the issuance of this permit. Issuance of this permit shall not be deemed to modify, waive or reduce any requirements of any City ordinance nor limit in any way the City's ability to enforce any ordinance provision. Sound/Noise originating from temporary construction sites as a result of construction activity are exempt from the noise limits of ECC Chapter 5.30 only during the hours of 7:OOam to 6:OOpm on SOUND OR NOISE weekdays and 10:OOam to 6:OOpm on Saturdays, excluding Sundays and Federal Holidays. At all other times the noise originating from construction sites/activities must comply with the noise limits of Chapter 5.30, unless a variance has been granted pursuant to ECC 5.30.120. UNDERGROUND UTILITY Call for locates of underground utilities prior to any excavation. LOCATES • �� INSPECTION TYPE DATE RESULT NOTES lip COMPLETE X-2 ENGINEERING FINAL** E-7 TRAFFIC CTRL Printed: Monday, November 23, 2020 11:45:05 AM 2 of 2 E L)'tlo v� RECEIVED 11/4/20 ANC. 19 O ROW PERMIT NO.: ENG 2020-0439 ISSUE DATE: 11/23/20 RIGHT-OF-WAY CONSTRUCTION PERMIT APPLICATION PROJECT NAME: CONTRACTOR: COMCAST - CABLE COM Mailing Address: COMCAST-1525 75TH ST SW EVERETT, WA 98203 CABLE COM 20021 120TH AVE NE BOTHELL. WA 98001 State License #: CABLEL*971DP City Business License #: NR - 021818 CONTACT: COMCAST- JOURDEN LAWRENCE CABLE COM - SUNSHINE CRABBS Phone #: JOURDEN LAWRENCE - 425.921.8201 SUNSHINE CRABBS - 360.312.32559 Fax #: Email #: COMCAST -JOURDEN_LAWRENCE@COMCAST.COM CABLE COM-SNOHOMISH.PERMITTING@CABLECOMLLC.NET Liability Insurance Bonded ADDRESS OR INTERSECTION OF CONSTRUCTION: 229 MAIN ST. ROW WORK ASSOCIATED WITH THE FOLLOWING TYPE OF PROJECT: ❑ Commercial ❑ Subdivision ❑ City Project ❑ Traffic Control (Only) ❑ Multi -Family ❑ Single Family Sf EUC (PUD, VERIZON, PSE, COMCAST, OVWSD): Is this permit part of a blanket permit? ANY ASSOCIATED PERMITS? ❑ Other ❑ Yes ❑ No BLD# ENG# DESCRIPTION OF PROPOSED WORK (Be Specific) : STARTING WITH VAULT 1 NEAR 201 MAIN ST WE WILL PROOF AND PULL APPROX. 20' OF NEW CATV TO VAULT 2 NEAR 229 MAIN ST. CONTINUE WORK ON PRIVATE PROPERTY JB0000374911 WAS STREET OVERLAYED WITHIN THE LAST FIVE (5) YEARS? YES ❑ NO ❑ Year: PAVEMENT CUT: ❑ Yes F1 No If yes, indicate size of cut: x CONCRETE CUT: ❑ Yes M No If yes, indicate size of cut: x RIGHT-OF-WAY CLOSURE AREA TOTAL DURATION (NUMBER OF MONTHS) Sidewalk 48 Hrs + LF X LF SF Alley 72 Hrs + LF X LF SF Parking 72 Hrs + LF X LF SF APPLICANT TO READ AND SIGN *Traffic control and public safety shall be in accordance with City regulations as required by the City Engineer. Every flagger must be trained as required by (WAC) 296-155-305 and must have certification verifying completion of the required training in their possession. *Restoration is to be in accordance with City codes and Standards. All street -cut trench work shall be patched with asphalt or City approved material prior to the end of the workday — NO EXCEPTIONS. Indemnity: The Applicant has signed an application which states he/she hold the City of Edmonds harmless from injuries, damages or claims of any kind or description whatsoever, foreseen or unforeseen, that may be made against the City of Edmonds or any of its departments or employees, including defense costs and attorney fees by reason of granting this permit. I have read the above statements and understand the permit requirements and acknowledge that I must follow all requirements in ord r fo e permit to be valid. SIGNATURE DATE 11 /3/2020 C ractor or Agent NO WORK SHALL BEGIN PRIOR TO PERMIT ISSUANCE Ccomcast PROJECT LOCATED AT 229 MAIN ST EDMONDS D1dRATION OF WORK APPROXIMATELY TBD ENGINEERING DIVISION APPROVED AS NOTED HOIARS OF OPERATION M.F, 8AM.4PM JOB NI,4MBERI JB0000374911 Sunshine Crabbs sunshine.crabbs ancablecomIIc.nLi BELL ST Ci 350-31-2-3259 101 LEGENDS ................. N ADVANCE WARNING SIGN LOCATION EM WORK VEHICLE R1 S.2 ROAD CLOSED LOCATION Applicant shall repair/replace all damage to utilities or frontage improvements in City right-of-way per city standards that is caused or occurs during the permitted project. 2ND AVE N OWNER/CONTRACTOR IS RESPONSIBLE FOR EROSION CONTROL AND DRAINAGE MAIN ST POLICE AND FIRE TO BE NOTIFIED OF ALLEY CLOSURE AT LEAST 48 HOURS PRIOR TO CLOSURE. COORDINATE CLOSURE WITH TRASH HAULERS. 11 /19/2020 R11.4 ROAD CLOSED TO THRIO TRAFFIC N w-<�E s NOT TO SCALE TRAFFIC CONTROL PLAN #1 OF S STREET IIASE PERMIT # ALLEY CLOSED AHEAD ALLEY STREET CLOSED CLOSED AHEAD AI SCHEDULE TRAFFIC CONTROL INSPECTION DURING WORK 3RD AVE S TRAFFIC CONTROL SERVICES FELIPE J. MACIAS,TCS #008890 h ack(cbtraff1ccontrolservlces. net OFFICE # (425) 658.3656 SEPTEMBER 55, 2051P Legend 1 :n. f New Ped Pole ® New Vault Existing U/G ����� Lock Box L J Footage 150' • �. Existing Aerial Text Box Text New U/G New Aerial Existing Private U/G . . . . Callout Arrow New Tap Q Phase Identifier 1 ❑ 040 j� �►. '-^ ' �'ir New Private U/G �. w �� � , Vault 1 3'` • "' � •: x- vault 2 . \- .;� �' �.. _ • �, %' � • Route Overview • Construction Notes: STARTING WITH VAULT 1 NEAR 201 MAIN ST WE WILL PROOF AND PULL APPROX. 20' OF NEW CATV TO VAULT 2 NEAR 229 MAIN ST. CONTINUE WORK ON PRIVATE PROPERTY. 4%, r If I 101- do Walkout P2 Task ID JB0000374911 Project Name LVL3_washington Federal Bank Address 229 Main St 1^ Prepared By: Scott Vermeys Rev. Date Sheet Number: �.; Route Overview Date: 9/16/2020 ENGINEERED FOR: 0 Project Manager: Chris Olsen CableCom s COMCAST Walkout I P2 Task ID JB0000374911 Project Name LVL3_Washington Federal Bank Address 229 Main St N Prepared By: Scott Vermeys Rev. Date Sheet Number: .. L3 Date: 9/16/2020 o rE ENGINEERED FOR: 0 Project Manager: Chris Olsen Right of Way CableCom 2 s COMCAST