0941_001ARCHITECTURE 8. DESIGN
38321 VISTA KEY DRIVE NE, HANSVILLE, WA 98340
CITY OF EDMONDS
DEVELOPMENT SERVICES DEPARTMENT — PLANNING DIVISION
425 771 0220
REGARDING PERMITS:
PROJECT #BLD2019-0183
BRAD SHIPLEY —ASSOCIATE PLANNER
Please see below a restatement of your comments for your convenience followed by a written response from W.E.A.D. in
bold. If there is any additional information needed, please don't hesitate to contact this office by phone or email. The
comments addressed pertain only to the section from Height Calculations.
HEIGHT CALCULATION
1. Please revise the site plan to include the covered front entry and deck. Include placement of support posts
Front landing and front covered entry now shown including support posts. Entire sheet revised to
include existing view of entire site plan as well new site plan.
2. Indicate covered portions of the deck -consistent with sheet A-103 — and note if the deck is permeable or
impervious.
Back deck shown and marked as Permeable. Roof edge overhang so indicated. Overhangs
accounted for in calculations on sheet G-001.
3. Adjust height rectangle to include the covered front entry.
Height rectangle shown revised on "new" portion of site plan. Calculations shown on right side of
layout sheet in framed box reflect revision to height rectangle.
4. Once revisions are made, update average grade, actual height, and maximum height on sheet A-201
See sheet A-201 for clouded revisions to above displayed heights.
206 915 5203 WWW.WESTEDGEARC.COM
[your Phone[ [Wob Addiess]