Loading...
1298_001A R C H lT E C T U R E & D ES lG N 3g32r"vrsîAKryDRrvËNË,HANsvrLLË,wAsB34o Ittatt )Ã 1ñ'lQ CITY OF EDMONDS ENGINEERING DIVISION 425771 0220 REGARDING PERMITS: PROJECT #BLD2O1 9.01 83 JOANNE ZULAUF - ENGINEERING TECHNICIAN Please see below a restatement of your comments for your convenience followed by a written response from W.E.A.D. in bold. lf there is any additional information needed, please don't hesitate to contact this office by phone or email. The comments addressed pertain only to the section from Engineering Division Review. o¡¡¡¡AL 1. Submit ROW Permit Application form. 4129- Any work beyond the property line is in the ROW. The new water will be installed in the ROW. Gontractor will or already has submitted this' 2. Submit Side Sewer Permit Application form. 4129- A clean-out will need to be provided that is accessible. Gontractor will or already has submitted this. lf clean-out does not exist, owner will supply one. 3. Show all City utilities that are adjacent to the site. 4129-The water meter connection shall be shown all the way to the public water main. The line from the meter to the water main must be installed. See revised Site Plan SP-001 4. All utilities should be shown from the City main line/lateral to the structure. 4129- Show the sewer from the public main to the connection on private property. Both the lateral (from main to property line) and the side sewer (property line to the house) are expected to be reused. See revised Site Plan SP-001. 5. DONE TESC 1. DONE. 2. DONE. 3. Add note: Alldisturbed soils willbe compost amended per BMP T5.13. 4129- Add to site plan See revised Site Plan SP-001 206 915 5203 lYôr¡r PhôneJ WWW.WESTEDGEARC.COM iw!'b AddrÊssj RESI.'B MAY 3 I 20t9 "'&'fi lluroÈouffû8'[ßE* ARCHITECTURE &D E S I G N 3s321vtsîA t(ry DRtvE Nr, HANSVTLLE, wA es340 TESC 4. Add note: lnstall and maintain aii TESC measures accr.ri'rjii'rg io app¡'oved plans, City of Edmonds standard details, and all other measures that may be required during construction ' 4129' Add to the site plan' See revised Site Plan SP-001 WATER 1. DONE. 2. DONE. 3. DONE. 4. New Comment: The response letter states that the existing water meter will be used for irrigation. Please label old meter to identify this use. See revised Site Plan SP-001 SEWER '1. DoNE. 2. DONE. 3. DONE. 4. DONE 5. DONE. 6. DONE. 7. New Comment: Since the side sewer is also intended to be reused, please add the following note. (The note that was added before was referring to the sewer lateral) Please keep both notes on plans. ,,lf reusing existing side sewer: property owner must have condition verified. Provide report to City's Public Works Department." See revised Site Plan SP'001 STORM WATER 1. provide lmpervious Areas charL. 4129- Please add shed to chart. Please provide a total existing impervious and a total final project impervious amounts. See revised Site Plan SP'001 )\ WWW.WESTEDGEARC.COM iWeb Adr!r:ssJ 206 915 5203 [Your Phone]