Engineering Comments-2of ED40CITY OF EDMONDS
�° PLAN REVIEW COMMENTS
ENGINEERING DIVISION
�sr_ ig90 (425) 771-0220
City Website: www.edmondswa.gov
DATE: April 29, 2019 Comment Letter #2
FROM: JoAnne Zulauf, Engineering Technician
Joanne.zulauf@edmondswa.gov
RE: Application #: BLD20190183
Project: Mulanax — Remodel/Addition
Project Address: 8307 215th St SW
During review of the plan resubmittal, it was found that the following information, corrections, or
clarifications are needed. Please submit revised plans/documents including a written response to
each item below.
GENERAL
1) 4/29 Please submit. Any work beyond the property line is in the ROW. The new water
meter will be installed in the ROW. Submit ROW Permit Application form
2) 4/29 Please submit. A clean -out will need to be provided that is accessible. Submit Side
Sewer Permit Application form, if the sewer will be disconnected or moved.
3) 4/29 The water meter connection shall be shown all the way to the public water main.
The line from the meter to the water main must be installed. Show all City utilities that
are adjacent to the site.
4) 4/29 Show the sewer from the public main to the connection on private property. Both
the lateral (from main to property line) and the side sewer (property line to the house)
are expected to be reused. All utilities should be shown from the city main line/lateral to
the structure
5) Done.
TESC
1) Done.
2) Done.
3) 4/29 Add to the site plan. Please add note: All disturbed soils will be compost amended per
BMP T5.13.
4) 4/29 Add to the site plan. Add note: Install and maintain all TESC measures according to
approved plans, City of Edmonds standard details, and all other measures that may be
required during construction.
WATER
1) Done.
2) Done.
3) Done.
4) 4/29 New Comment: The response letter states that the existing water meter will be
used for irrigation. Please label old meter to identify this use.
SEWER
1) Done.
2) Done.
3) Done.
4) Done.
5) Done.
6) Done.
7) 4/29 New Comment: Since the side sewer is also intended to be reused, please add the
following note. (The note that was added before was referring to the sewer lateral)
Please keep both notes on plans.
"If reusing existing side sewer: Property owner must have condition verified. Provide
report to City's Public Works Dept."
STORM
1) 4/29 Please add shed to chart. Please provide a total existing impervious and a total
final project impervious amounts. Provide the following information regardless of
whether your new impervious is under 2000 sf. Impervious Areas chart: Provide a
breakdown for all the impervious surfaces.
Type of area
Square footage
Existing Impervious
New Impervious
Page 2 of 2