ENG COMPACTION REPORTEarth 'Solution NWi« Earth Solutions NW, LLC LETTER OF TRANSMITTAL To: Select Homes Inc. 16531 — 13th Ave W, A107 Lynnwood, WA 98037 Attn: Mr. Gary Klick Email: gary@selecthomeswa.com No. of Date: October 13, 2020 ESNW No.: 6999.03 Project: 82" d Single Family Residences Copies Date Description 1 10/5/20 Daily Field Report(s) # 1 Comments: CC: 1: ATTN: 2: ATTN: 3: ATTN: 4: ATTN: 5: ATTN: Transmitted By: Earth Solutions NW, LLC PM: Henry Wright, P.E. 15365 NE 901h Street, Suite 100 Redmond, WA 98052 (425) 449-4704 FAX (425) 449-4711 Earth Solutions NWLLC ESNW Rep. Project No. Page Report No. GFB 6999.03 1 of 2 1 15365 NE Street, Suite 100 Time On Site Time Off Site Date Da of Week y Redmond,n WA 98052 V Main (425) 449-4704 1 Fax (425) 449-4711 9:40 10:10 10/5/20 Mon www.esnw.com Travel Time Weather DAILY FIELD REPORT .75 hr Cloudy, 55°F Project Name Job Location Client/Owner 82nd Single Family Residences 21328 — 82nd PI. W, Edmonds Select Homes, Inc. Contractor #1 Contact Field Supervisor Reviewed LAC Contractor #2 Contact Project Manager Reviieweed' / HTW vi'/lf/ Are approved plans/permits on site? Yes Project No. Permit No. Test Test Location Reference Maximum Fill Test % of Number (See Map) Elevation Compaction Dry Density Moisture Dry Density Maximum Curve (pcf) (%) (pcf) Dry Density 1 Sewer backfill SG 1 135.6 4.68 128.6 95 2 Sewer backfill SG 135.6 5.20 130.7 96 3 Sewer backfill SG 135.6 5.91 129.4 95 As requested by the contractor, ESNW rep. was onsite to observe and test sewer line backfill in the road offsite. Sewer observations: Upon arrival, ESNW rep. observed the contractor had previously installed the sewer line in the street offsite some time ago and had covered the trench with cold patch asphalt. ESNW rep. observed the contractor tear up a small amount of asphalt and then compact the subgrade backfill material that was disturbed by the asphalt removal. ESNW rep. then took compaction test in the sewer line backfill and the power line backfill. While onsite, ESNW rep. also collected a proctor sample for laboratory analysis. Compaction testing: ESNW rep. took compaction tests at the SG elevation in the sewer line backfill. Density test results indicate adequate compaction of at least 95% at all the tested locations. The locations of these tests are approximately shown in the attached plans. ESNW rep. will return when requested Greg Buzitis ESNW Senior Field Technician (206) 488-4151 Earth Solutions NWLLC ESNW Rep. Project No. Page Report No. 15365 NE Street, Suite 100 Redmond,n WA 98052 V GFB 6999.03 2 of 2 1 Time On Site Time Off Site Date Da of Week Y Main (425) 449-4704 1 Fax (425) 449-4711 9:40 10:10 10/5/20 Mon www.esnw.com DAILY FIELD REPORT Travel Time .75 hr Weather Cloudy, 55°F Project Name Job Location Client/Owner 82nd Single Family Residences 21328 — 82nd PI. W, Edmonds Select Homes, Inc. Contractor #1 Contact Field Supervisor Reviewed LAC Contractor #2 Contact Project Manager HTW Reviewed � / Y �' lit/ Are approved plans/permits on site? Yes Project No. Permit No. I � AR/ /'I1 0 I i twos I nas k r PARCEL L i I I r rCir w.z i 4 v. 1 I •Lrli, Approx. locations of I tests in sewer backfill. C ; IrM[saK I\ IL1----------- --- 1 PARCEL O PARCELC..-.....�.....�.... wAie • r,RtM 1 la' 1 !� arouor � i I m�nyc.rnrsl � I I ' I nawn�waE 1� I .zsn I --------------------------------------------- ------ -- 1 3 2 777. 0 rt 0 irE SOUIM t0 . iJEO io THE Gtt 1FiER i c�anM� 3