ENG COMPACTION REPORT (2)Earth
'Solution
NWi«
Earth Solutions NW, LLC
LETTER OF TRANSMITTAL
To: Select Homes Inc.
16531 — 13th Ave W, A107
Lynnwood, WA 98037
Attn: Mr. Gary Klick
Email: gary@selecthomeswa.com
No. of
Date: February 3, 2021
ESNW No.: 6999.03
Project: 82" d Single Family Residences
Copies Date Description
1 1/11/2021 Daily Field Report(s) # 2
Comments:
CC:
1:
ATTN:
2:
ATTN:
3:
ATTN:
4:
ATTN:
5:
ATTN:
Transmitted By: Earth Solutions NW, LLC
PM: Henry Wright, P.E.
15365 NE 901h Street, Suite 100 Redmond, WA 98052
(425) 449-4704 FAX (425) 449-4711
Earth Solutions NWLLC
ESNW Rep.
Project No.
Page
Report No.
GFB
6999.03
1 of 2
2
15365 NE Street, Suite 100
Time On Site
Time Off Site
Date
Da of Week
y
Redmond,n WA 98052
V
Main (425) 449-4704 1 Fax (425) 449-4711
11:25
11:55
1 /11 /21
Mon
www.esnw.com
Travel Time
Weather
DAILY FIELD REPORT
.75 hr
Rain, 40°F
Project Name
Job Location
Client/Owner
82nd Single —
Family Residences
21328 — 82nd PI.
W, Edmonds
Select Homes, Inc.
Contractor #1
Contact
Field Supervisor
Reviewed
LAC
Contractor #2
Contact
Project Manager
Revieyved
HTW
AYITV
Are approved plans/permits on site? Yes Project No. Permit No.
Test
Test Location
Reference
Maximum
Fill
Test
% of
Number
(See Map)
Elevation
Compaction
Dry Density
Moisture
Dry Density
Maximum
Curve
(pcf)
(%)
(pcf)
Dry Density
4
Sidewalk backfill
SG
134.2
4.40
129.6
97
2
5
Sidewalk backfill
SG
134.2
4.92
128.1
95
As requested by the contractor, ESNW rep. was onsite to observe and test the sidewalk backfill.
Sidewalk observations:
Upon arrival, ESNW rep. observed the contractor had graded out the sidewalk to SG and had then placed —4" of
crushed rock to act as the base for the sidewalk. ESNW rep. observed the contractor has compacted the material
to a dense and stable state using portable plate whackers. ESNW rep. took surface compaction tests in the
material while onsite.
While onsite, ESNW rep. also collected a proctor sample for laboratory analysis.
Compaction testing:
ESNW rep. took compaction tests at the SG elevation in the sidewalk backfill. Density test results indicate
adequate compaction of at least 95% at all the tested locations. The locations of these tests are approximately
shown in the attached plans. /
ESNW rep. will return when !
requested.
Greg Buzitis
ESNW Senior Field Technician
(206)488-4151-
0
a s
tF�
Earth Solutions NWLLC
ESNW Rep.
Project No.
Page
Report No.
15365 NE Street, Suite 100
Redmond,n WA 98052
V
GFB
6999.03
2 of 2
2
Time On Site
Time Off Site
Date
Da of Week
Y
Main (425) 449-4704 1 Fax (425) 449-4711
11:25
11:55
1 /11 /21
Mon
www.esnw.com
DAILY FIELD REPORT
Travel Time
.75 hr
Weather
Rain, 40°F
Project Name
Job Location
Client/Owner
82nd Single — Family Residences
21328 — 82nd PI.
W, Edmonds
Select Homes, Inc.
Contractor #1
Contact
Field Supervisor
Reviewed
LAC
Contractor #2
Contact
Project Manager
HTW
Reviewed
YOW
Are approved plans/permits on site? Yes Project No.
Permit No.
IkL
="pper� A
I � �19RIOGR� � �`C2K.r ----------
PARCEL C R
1 � PON
I
1
Approx. locations of
tests in sidewalk
o backfill.
I`
�----------- ------- ----- ---- ---
S EINe
PARCEL O
1 ,
PARCEL C ..- wgmtes
• r,Rtr
1
la'
1 !� arouor � i
I oa.nw.ar:s� �
I 1
' I nawn�war 1�
I .nn
I
--�;.- -- ...trb,®Ro•YR10
--------------------------------------------- ------ --
0
5
rt 0 irE SOUlM tO
. iJEO io TNEGtt1FiER
i c�anM�
3