ENG COMPACTION REPORT (2)Earth 'Solution NWi« Earth Solutions NW, LLC LETTER OF TRANSMITTAL To: Select Homes Inc. 16531 — 13th Ave W, A107 Lynnwood, WA 98037 Attn: Mr. Gary Klick Email: gary@selecthomeswa.com No. of Date: February 3, 2021 ESNW No.: 6999.03 Project: 82" d Single Family Residences Copies Date Description 1 1/11/2021 Daily Field Report(s) # 2 Comments: CC: 1: ATTN: 2: ATTN: 3: ATTN: 4: ATTN: 5: ATTN: Transmitted By: Earth Solutions NW, LLC PM: Henry Wright, P.E. 15365 NE 901h Street, Suite 100 Redmond, WA 98052 (425) 449-4704 FAX (425) 449-4711 Earth Solutions NWLLC ESNW Rep. Project No. Page Report No. GFB 6999.03 1 of 2 2 15365 NE Street, Suite 100 Time On Site Time Off Site Date Da of Week y Redmond,n WA 98052 V Main (425) 449-4704 1 Fax (425) 449-4711 11:25 11:55 1 /11 /21 Mon www.esnw.com Travel Time Weather DAILY FIELD REPORT .75 hr Rain, 40°F Project Name Job Location Client/Owner 82nd Single — Family Residences 21328 — 82nd PI. W, Edmonds Select Homes, Inc. Contractor #1 Contact Field Supervisor Reviewed LAC Contractor #2 Contact Project Manager Revieyved HTW AYITV Are approved plans/permits on site? Yes Project No. Permit No. Test Test Location Reference Maximum Fill Test % of Number (See Map) Elevation Compaction Dry Density Moisture Dry Density Maximum Curve (pcf) (%) (pcf) Dry Density 4 Sidewalk backfill SG 134.2 4.40 129.6 97 2 5 Sidewalk backfill SG 134.2 4.92 128.1 95 As requested by the contractor, ESNW rep. was onsite to observe and test the sidewalk backfill. Sidewalk observations: Upon arrival, ESNW rep. observed the contractor had graded out the sidewalk to SG and had then placed —4" of crushed rock to act as the base for the sidewalk. ESNW rep. observed the contractor has compacted the material to a dense and stable state using portable plate whackers. ESNW rep. took surface compaction tests in the material while onsite. While onsite, ESNW rep. also collected a proctor sample for laboratory analysis. Compaction testing: ESNW rep. took compaction tests at the SG elevation in the sidewalk backfill. Density test results indicate adequate compaction of at least 95% at all the tested locations. The locations of these tests are approximately shown in the attached plans. / ESNW rep. will return when ! requested. Greg Buzitis ESNW Senior Field Technician (206)488-4151- 0 a s tF� Earth Solutions NWLLC ESNW Rep. Project No. Page Report No. 15365 NE Street, Suite 100 Redmond,n WA 98052 V GFB 6999.03 2 of 2 2 Time On Site Time Off Site Date Da of Week Y Main (425) 449-4704 1 Fax (425) 449-4711 11:25 11:55 1 /11 /21 Mon www.esnw.com DAILY FIELD REPORT Travel Time .75 hr Weather Rain, 40°F Project Name Job Location Client/Owner 82nd Single — Family Residences 21328 — 82nd PI. W, Edmonds Select Homes, Inc. Contractor #1 Contact Field Supervisor Reviewed LAC Contractor #2 Contact Project Manager HTW Reviewed YOW Are approved plans/permits on site? Yes Project No. Permit No. IkL ="pper� A I � �19RIOGR� � �`C2K.r ---------- PARCEL C R 1 � PON I 1 Approx. locations of tests in sidewalk o backfill. I` �----------- ------- ----- ---- --- S EINe PARCEL O 1 , PARCEL C ..- wgmtes • r,Rtr 1 la' 1 !� arouor � i I oa.nw.ar:s� � I 1 ' I nawn�war 1� I .nn I --�;.- -- ...trb,®Ro•YR10 --------------------------------------------- ------ -- 0 5 rt 0 irE SOUlM tO . iJEO io TNEGtt1FiER i c�anM� 3