Loading...
END COMPACTION REPORTEarth Solutions NW«� Field Rep, Project No Page 1 of 2 Report No. TSH 6919 t 1805 13V Place NE, FAX: _1 Date Day of Week _ Time On Site Time Off Site Suite 201 (425) 449-4711 Bellevue, WA 98005 1:00 2:30 8/20/2019 Tuesday (425) 449-4704 Travel Time DAILY FIELD REPORT Weather 1.513T I 75°F, Partly Cloudy Project Name Job Location Client / Owner Homeland Pavement Subgrade 515 Homeland Drive, Edmonds General Contractor General Contractor's Superintendent Received Onsite By Complete Excavation Justin Grading Contractor Grading Foreman Checked By 1 , Are approved Plans/Permits onsite ® YES NO Project No. Permit No. As requested, ESNW representative was on site to observe and test stormwater utility trench backfill compaction. While onsite the following was observed: Compaction Testing (Stormwater Utility Trench, Subgrade): ESNW rep arrived onsite as requested by the contractor to observe and test vault utility trench backfill. Upon arrival during the afternoon, ESNW rep observed the contractor to have backfilled the shallow stormwater utility trench (approximately 3ft depth) to subgrade, and observed contractor to have utilized imported 1 VV crushed rock as backfill material. ESNW rep was informed by the contractor that backfill was compacted via a jumping jack compactor. ESNW rep observed the compacted crushed rock fill to be firm and unyielding, consistent with crushed rock soils compacted to 96% of maximum density. ESNW rep observed the compacted crushed rock suitable for pavement subgrade ESNW rep will return as requested. Trevor Healy, G.I.T Senior Field Technicia (206)-945-3345 COPY TO: CONTINUED ON NEXT PAGE Earth Solutions NWLLC Field Rep. Project No. Page 2 of 2 Report No. TSH 6919 1 F 1805 136'h Place NE, FAX: Time On Site Time Off Site Date Day of Week Suite 201 (425) 449-4711 Bellevue, WA 98005 1:00 2:30 8/20/2019 Tuesday (425) 449-4704 Travel Time Weather DAILY FIELD REPORT 1.5RT 75°F, Partly Cloudy Project Name Job Location Client / Owner Homeland Pavement Subgrade 515 Homeland Drive, Edmonds General Contractor General Contractor's Superintendent Received Onsite By Complete Excavation Justin Grading Foreman _ Checked By Grading Contractor 9e/ flowell Way � C /o /s II 515 Homeland Drive 27 min die - `t,;m u.� Area of shallow storm D installation rp Homeland Dr fgorneland 0r cn D ra North Seattle Natural Medicine Fig. 1: Map view of the area surrounding the Homeland Pavement Subgrade development (no plans provided). COPY TO: CONTINUED ON NEXT PAGE ❑