Loading...
ENG COMPACTION REPORTEarth Solution MV11-C. To: BDZ Construction 3207 Pacific Ave Earth Solutions NW, LLC LETTER OF TRANSMITTAL Everett, WA 98201 Attn: Mr. Chad Jensen Email: chadgbdreonstruction.coni No. of Date: February 2, 2020 ESNW No.: ES- 7175 Project: Scott Delap Sewer Uo ies Date Description 1 1 1/28/20 Daily Field Report(s) # 1 Comments: CC: 1: ATTN: 2: ATTN: 3: ATTN: 4: ATTN: 5: ATTN: Transmitted By: Earth Solutions NW, LLC PM: Kyle Campbell, P.E. 15365 NE 901h Street, Suite 100 Redmond, WA 98052 (425) 449-4704 FAX (425) 449-4711 " Earth Solutions NWT« ESNW Rep. Project No. Page Report No. GFB 7175.00 1 of 1 1 15365 NE Street, Suite 100 Redmond,n WA 98052 Time On Site Time Off Site Date Da Y of Week Main (425) 449-4704 1 Fax (425) 449-4711 12:00 12:30 1 /28/20 Mon www.esnw.com Travel Time Weather DAILY FIELD REPORT 1.5 hr. Cloudy, 40'F Project Name Job Location Client/Owner Scott Delap Sewer 639 2n' Ave N, Edmonds BDZ Construction Contractor#1 Contact Field Supervisor Reviewed BDZ Construction Steve LAC 141 Contractor #2 Contact Project Manager Reviewed Are approved plans/permits on site? Project No. Permit No. Test Test Location Reference Maximum Fill Test % of Number (See Map) Elevation Compaction Dry Density Moisture Dry Density Maximum Curve (pcf) N (pcf) Dry Density 1 Sewer backfill -3' 125.8 6.39 120.E 96 � 1 2 Sewer backfill SG 125.8 5.42 119.5 95 As requested by the client, ESNW rep. was onsite to observe sewer main installation. Sewer line observation: Upon arrival ESNW rep. observed the contractor working in the road installing sewer line. ESNW rep. observed the trench to be —6' deep. ESNW rep. observed the contractor embed the pipe in pea gravel and then backfill the trench in —12" lifts of imported 5/8" minus crushed rock. ESNW rep. observed the contractor compact the material in between lifts with a large hoe -pack. ESNW rep. took compaction tests within the backfill at -3' and SG elevations. Compaction testing: ESNW rep. took compaction tests at — -3' and SG elevations within the backfill. Density test results indicate adequate compaction of at least 95% in the backfill. The locations of these tests are approximately shown in the attached picture. �w 7ve _ L ESNW rep. will return when Approx. location of tests in requested. the sewer backfill in the Greg Buzitis road ESNW Senior Field Technician --_ �p•� (206) 488-4151