Loading...
0668_001RAM Engineering April 2, 2019 City of Edmonds Development Services Department 121 51h Avenue North Edmonds, WA 98020 RE: Select — 715 Spruce St, Plan Check BLD20190103 1st Review Comment Response RAM Job No. 18-022 Dear Staff: This letter outlines the revisions and corrections made per planning, building and engineering review comment letters. Below is a list of the comment response documents addressing the comments and requests: Engineering Comments, JoAnne Zulauf March 14, 2019: GENERAL 1) Submit ROW Permit Application form Response: ROW permit application will be made by applicant. 2) Submit Side Sewer Permit Application form Response: Side sewer permit application will be made by applicant. 3) A Stormwater Covenant is required to be recorded against the property based on the proposed stormwater facilities for the project. Please complete the covenant, including notarization and any required exhibits and submit to the city. Ensure the stormwater covenant meets Snohomish County Record Drawing requirements. The document must be complete, but will not be recorded prior to permit issuance. Prior to construction, final location of facilities are to be verified (by field inspection and asbuilt) and then the covenant will be recorded. Response: See attached signed Stormwater Covenant. 4) The project is located within the downtown area. Please show and/or describe the haul route. Response: Haul route map added to sheet TP-01. 5) Please show the full driveway approach to be paved, currently only a portion is shown to be paved. Response: Full driveway approach pavement expanded as much as possible and maintain 14% max slope. 6) Add note: Utility patches shall be combined and full width or half width overlay will be required depending on the extent of disturbance. Where utility patches fall entirely within one travel lane, the overlay shall extend to the centerline of roadway. Where utility patches extend into both travel lanes then a full width overlay is required. Response: Note added as requested. STORMWATER ENGINEER REVIEW Refer to separate plan review comments by City Stormwater Engineer, Zachary Richardson. Please contact Zack directly at 425-771-0220 or by email at zach a v.richardson(i�edmonds��a.�, c►v with any specific questions you may have regarding his comments. Select — 715 Spruce St Plan Check BLD20190103 1st Review Comment Response RAM Job No. 18-022 Review Comments: 1. The infiltration overflow requires additional attention: a. It appears the proposed easement area and outfall piping conflicts with improvement proposed under BLD20190102; update and address as needed. b. It appears the overflow pipe would be projecting out of surface at the proposed CB on -site; update and address as needed. Response: Proposed system from adjacent project shown to clarify no conflict exists. Thank you, Mike Morris, PLS Principal Page 2 of 2 RAM Engineering 16531 13`h Ave W, Suite A108 Lynnwood WA 98037 (425)678-6960 RAMengineeringinc.com