Loading...
3638_001—I— e-Im I.. 0 LAND SURVEYORS DATE: January2l,2020 TO: Kjell Undberg FROM: Dan Moehrke, PLS ARAMAKI BORDEN AND A-%OClATES, INC. 6141 NE BOTHELL WAY SUM *304 KENMORE, WA 98028 TEL: 425-485-9711 SURJECT: 10723 235�h Place SW Lot B, City of Edmonds Short Plat PLN20130031 Today, at your request we visited the above site to determine the elevation of the highest peak of the roof over the house under construction. We recovered the site benchmark: 0 Ink line on fence post at SW corner of Lot A. Elevation = 374-00 We directly measured the elevation of the highest ridge to be at elevation 390.75 If you have any questions, please call me at 425-485-9711. EN & SEAL C-409 A- 1977 -�o MIGR CONSTRUCTk'N SERVICES Worker/Subcontractor Name: Site Builder Name: Worker/ Subcontractor Week1v Timesheet Address/City: WEEK ENDING: Sunday, Month, Day, Year (Separate timesheet is required for each site) Date: LabourType Time In Time Out Lunch Break Job Duties or Notes (if Required) Total Hours (Minus Lunch) Monday Tuesday Wednesday Thursday Friday Saturday EMAILTO: watimesheets@mgr-cs.com OR FAX TO: 1-905-451-2474 PO Number (if Applicable): Week Sub -Total Worker /Sub - Contractor Site Supervisor Signature All workers/subcontractors must take a half hour lunch break after 5 hours worked, as it will be deducted. All completed forms must be received by our office no later than every Friday evening by 9 PM Timesheets must be written in pen (no pencil) and be clear/legible when sent to Head Office Absolutely no worker/sub-contractor shall work on Sunday or on any Statuatory Holidays (as per your State) No worker/subcontractor is to work on Saturday without approval by MGR Operations if you do work on a Saturday without approval you will not be paid for that work Signature *Timesheets will be NOT be accepted without the Site Supervisor's signature/written approval GOQAmen,StreetEast,SLute2CI5,BrwwwtDzt,ONLGVIA9 TEL-9G_x;-73&18Z9 FA)L-90&4S12474