2616_00113Mf INSIGHT ENGINEERING CO. October 10, 2019 T JoAnne Zulaf, Engineering Technician 121 5 1h Ave N Edmonds, WA 98020 (425) 771-0220 Re: 2351h SFR — BLD20190919 IECO No. 18-0969 Dear JoAnne, The project referenced above is revised in response to the review comments dated September 25, 2019. The review comments are numbered on the letter and have been addressed in italics as follows: GENERAL 1) Show and label all private easements (access, sewer, storm) within the plan sets. The private easements are now shown and labeled See site plan. SITE PLAN 1) The driveway and structures shall be dimensioned. Dimensions have been added to the driveway and structures. See site plan. 2) The City's Public Works Operations and Maintenance Department provides Fire/Aid address signs, as required, upon payment of required fees ($75/sign). Two (2) fire aid address signs will be required with the proposed development and the plans shall reflect a process that requires the contractor/property owner to contact the Engineering Division by email at engineeringpemits(-Oedmondswa.gov 2-weeks in advance of the requested sign fabrication. (These may have been purchased during the subdivision process) Refer to the note on the site plan. TESC 1) Add a note that the stockpile is to be covered within 24 hours during the wet season. PO Box 1478 # Everett, WA 98206 s Phone: (425) 303-9363 Fax: (425) 303-9362 * Email:info@insightengineering.net Refer to note 2 on sheet C1. 2) Add note: Install and maintain all TESC measures according to approved plans, City of Edmonds standard details, and all other measures that may be required during construction. Refer to note 3 on sheet Cl. WATER 1) Please note a water meter size. The existing water meter size is I " and has been added to the plans. See sheet C2. SEWER 1) The portion of the sewer from the shared pipe to the house should be in a darker line weight since it is to be installed with this project. Show clean outs. The sewer has been revised The proposedpipe to be installed has been shown as a darker line then the existing pipelcleanout. See sheet C2. STORMWATER ENGINEER REVIEW — ZACK RICHARDSON, PE AUGUST 28,2019 1. Revise drainage report to stand alone a bit better, and/or include previous report as an appendix. a. Address/clarify the role of the upland piping connected to the existing infiltration system (overflow only or part of upstream mitigation) The uplandpiping isfor overflow only. The previous drainage reportfor the approved short plat has been attached in appendix B of the report. See the previous report's appendix D plan sheet C06 note 22 for overflow details. b. Address/clarify how and why impervious areas for the shared driveway are included or excluded from the impervious percentage calculation used for comparison to the old report. The shared driveway onsite has been added to the impervious calculation percentage. The shared driveway was omitted by mistake. All imperviousfor lot B must be calculated to be sure the lot area is less than 70% impervious tofully infiltrate. See Section 5 on page 15 of the reportfor calculations. 2. C2: List invert elevations for each cleanout and/or fitting Ounction/tee/elbow, etc), including connection points with the existing system. All inverts are shownfor cleanouts andfittings. See sheet C2. PO Box 1478 * Everett, WA 98206 # Phone: (425) 303-9363 Fax: (425) 303-9362 * Email:info@insightengineering.net 3. C2: Clarify if floatable separation (down -turned elbow, push -on tee, etc) is currently provided in the existing downstream C13/YD prior to the infiltration system; if not, please add and callout a device at the proposed yard drain (and provide details as/if needed for construction). A note has been addedfor the contractor to field verify the presence of a push -on tee and install one if necessary. A detail has also been added See sheet C2 and detail VC2. 4. C2: Show/identify where footing drains will discharge. a. If connecting to the infiltration system, provide a minimum elevation for the perforated portions which maintains a minimum 6" freeboard above the top of trench/rock elevation. The footing drain is now shown with at least 6 " offreeboard See sheet C2. 5. C2: Reviewer has concern about maintaining the integrity of the existing trench in the shared driveway while excavating for the east -most connection to the existing system (in the shared driveway). Provide direction to contractor as needed to maintain the trench during excavation or provide response addressing concern. The drainage system beneath the existing shared driveway is no longer being altered The existing system will remain with the proposed catch basin beingplaced atop the existing pipe. See sheet C2. 6. C2: Show/identify the pavement restoration within shared driveway for the revised storm alignment. The shared driveway is now proposed to remain undisturbed See Sheet C2. Please feel free to contact me with any questions or comments you may have. Sincerely, r 2 B ?—�K IZ, P.E. RF-, ?�aa)n\nq' 6'ro'G( - '5-e� AO - A\ LA <S Cuo . u� \PC Az� V\�� �—e cl, PO Box 1478 * Everett, WA 98206 # Phone: (425) 303-9363 Fax: (425) 303-9362 * Email:info@insightengineering.net