Loading...
Engiineering Comments 1of ED40CITY OF EDMONDS �° PLAN REVIEW COMMENTS ENGINEERING DIVISION �sr_ ig90 (425) 771-0220 City Website: www.edmondswa.gov DATE: September 25, 2019 FROM: JoAnne Zulauf, Engineering Technician JoAnne.Zulauf@edmondswa.gov RE: Application #: BLD20190919 Project: Lindberg -Single Family Residence Project Address: 10723 235th St SW During review of the above noted application, it was found that the following information, corrections, or clarifications are needed. Please submit revised plans/documents including a written response to each item below. GENERAL 1) Show and label all private easements (access, sewer, storm) within the plan sets. SITE PLAN 1) The driveway and structures shall be dimensioned. 2) The City's Public Works Operations and Maintenance Department provides Fire/Aid address signs, as required, upon payment of required fees ($75/sign). Two (2) fire aid address signs will be required with the proposed development and the plans shall reflect a process that requires the contractor/property owner to contact the Engineering Division by email at en ing eeringpemits(&edmondswa. _og_v 2-weeks in advance of the requested sign fabrication. (These may have been purchased during the subdivision process) TESC 1) Add a note that the stockpile is to be covered within 24 hours during the wet season. 2) Add note: Install and maintain all TESC measures according to approved plans, City of Edmonds standard details, and all other measures that may be required during construction. WATER 1) Please note water meter size. SEWER 1) The portion of the sewer from the shared pipe to the house should be in a darker line weight since it is to be installed with this project. Show clean outs. STORMWATER ENGINEER REVIEW — see separate comments