IMPACT FEE-TRANSPORTATION-BLD20191012APPENDIX A
AUG 15 2019 Page I of 2
Transports WWA*Iact Analysis
Worksheet j3LM01q, tioiZ 1_D�.5
P ERMIFFING & DEVELOPMENT
ENGINEERING
DIVI510N
121 5th Avemle N
1": 425.771.0220
www,ediYnondstiNi ,gov
Name of Proposed Project: Jenkins Lane - Lot 5
Owner/Applicant
Echelbarger Homes & Land, LLC
Name
4001 198th St. SW. #2
Street/Mailing Address
Lynnwood WA 98036
City State Zip
Telephone: 425.673.1100
Applicant Contact Person:
Todd Echelbarger
Name
Same
Street/Mailing Address
City State Zip
Telephone: 206.920.3673
Traffic Engineer who prepared the Traffic Impact Analysis (if applicable):
Firm Name
Telephone:
1. PROJECT DESCRIPTION
a. Location - Street address: 706 13th Way SW
b. Specify existing land use: Vacant Land
Contact Name
E-mail:
(Attach a vicinity map and site plan.)
c. Specify proposed type and size of development: Construct one single family home +/- 3,000SF
(# of residential units and/or square footage of building)
d. Date construction will begin and be completed: 9/15/2019 to March 1, 2020
e. Define proposed access locations: Private driveway connecting to 13th Way SW
APPENDIX A
Page 2 of 2
f. Define proposed sight distance at site egress locations: No limitations
2. MITIGATION RECOMMENDATIONS
State recommended measures and fees required to mitigate project specific traffic impacts.
Traffic impact fee shall be calculated from the attached Impact Fee Rate Tables and as identified
in ECDC 18.82.120, except as otherwise provided for independent fee calculations in ECDC
18.82.130.
❑ CHANGE IN USE
Fee for prior use shall be based on fee established at the time the prior use was permitted. If
the previous use was permitted prior to the adoption of Ordinance 3516 (effective date:
09/12/04), the 2004 ECDC 18.82.120 impact fee shall be used.
ITE Land Use Category I Per Unit
Fee Rate
New Use $ X
Prior Use $ X
Units in
square feet,
# of dwelling,
of , etc.
1
Fee
i
New Use Fee: $ - Prior Use Fee: $
$
l NEW DEVELOPMENT
New Use
❑ OTHER
ITE Land Use Category I Per Unit
Fee Rate
210 $ 6,249.14 1 X
Units in
square feet,
# of dwelling,
of , etc.
1 —
Fee
ITIGATION FEE RECOMMENDATION:
INDEPENDENT FEE CALCULATION: $240.00 + consultant fee
$
TOTAL TRANSPORTATION IMPACT FEE
1 $ �• ��
City oTfddifionds, Engineering Division Approval
-O Zle/zD1
Date
1 No impact fees will be due, nor will a credit be given, for an impact fee calculation resulting in a net negative.
t to
.hRVJ
fW