Loading...
2019-1361 6924 176th St SW - Chinn Special Inspection4001 Main Street, Suite 305 Vancouver WA, 98663 P: 360.566.7343 February 26, 2020 Mr. Cory Myron R&R Foundation Specialist 3409 McDougall Ave Suite 204 Everett, WA 98201 Re: Special Inspection – 6924 176th Street SW, Edmonds, Washington Permit No.: BLD0191361 Dear Cory- I have performed the special inspection of the installation of the helical anchors per IBC Chapter 17 for the above-referenced project. Helical Anchor - Installation The helical anchor used for installation was a 2 7/8” diameter pipe with a 10” diameter helix configuration. The installation was performed by R&R Foundation Specialist, certified installers for Piertech products using an MM10K drive head. The maximum axial load requirement for this project is 10,000 lbs working load (20,000 lbs ultimate). The anchors were driven to depths of 8 – 10 feet with a minimum installation pressure of 1,300 psi. This results in an ultimate axial capacity of 31,468 lbs, exceeding the required ultimate load per the design documents. Summary Based on my special inspection and structural observation, the helical anchors were installed according to the engineering design load requirements and according to IBC Chapter 17. Please give our office a call if you have any questions or need further assistance. Regards, Daniel Stark, P.E. Stark Foundations, Inc. Attachments: Drive Log Helical Driver Torque Chart 4001 Main Street, Suite 305 Vancouver WA, 98663 P: 360.566.7343 Pier 1