Loading...
ENG-COMMENTS-1of EDAto CITY OF EDMONDS PLAN REVIEW COMMENTS ENGINEERING DIVISION (425) 771-0220 IPsr. 1890 City Website: www.edmondswa.gov DATE: March 4, 2020 FROM: JoAnne Zulauf, Engineering Technician Joanne.zulauf(c�r�,edmondswa. gov RE: Application #: BLD20200195/BLD20190155 Project: Shank Garage/SFR Project Address: 730 Cary Rd During review of the above noted application, it was found that the following information, corrections, or clarifications are needed. Please submit revised plans/documents including a written response to each item below. Resubmittals can be made at the Development Services Department on the 2nd floor of City Hall. Permit Center hours are M, T, Th & F from 8am-4:30pm and on Wednesdays from 8:30am-noon. City of Edmonds handouts, standard details, application and other forms, and development code may be referenced on the City website: www.edmondswa.gov under Services/Permits and Development. BLD20190155 SFR 1) A revised Stormwater Covenant is required showing the new infiltration system and the proposed garage shall be submitted. Guidelines: A Stormwater Covenant is required to be recorded against the property based on the proposed stormwater facilities for the project. Please complete the enclosed covenant, including notarization and any required exhibits and submit to the city. Ensure the stormwater covenant meets Snohomish County Record Drawing requirements. The document must be complete, but will not be recorded prior to permit issuance. Prior to construction final, location of facilities are to be verified (by field inspection and asbuilt) and then the covenant will be recorded. 2) Please submit revised civils showing the new infiltration system. Garage should also be shown, add call out that references the garage permit number. BLD20200195 Garage 1) There are several references to "civil plan by others" and "per civil plans" yet no civil plans were submitted showing the garage and the new infiltration system. 3) This plan is labeled as a revision but it should be only for the new garage permit. Revise or remove all callouts on the plan that refer to construction under the SFR permit. For example "new patio roof overhang" — is this a revision to the SFR permit or just notes that do not apply to this garage permit. 4) Provide references to the SFR permit number where needed. 5) Will water or sewer be provided to the shed? If so, please show those connections with the full utility call outs on the plan. TESC 1) Orange protective barrier fencing shall be placed at the drip line of trees to remain and around areas proposed for low impact development techniques, such as rain gardens, infiltration systems, etc., to protect the area from compaction. STORM 1) Impervious Surface: note the additional impervious surface added to the lot as a result of the garage construction. 2) Label roof drain tightline and footing drains. 3) Provide invert elevation for point of connection near southwest corner of the garage. 4) Provide rim /invert elevations for the catch basin connecting to the infiltration system. STORMWATER ENGINEER REVIEW Refer to separate plan review comments by City Stormwater Engineer, Zachary Richardson. Please contact Zack directly at 425-771-0220 or by email at zachary.richardson(&edmondswa.i!ov with any specific questions you may have regarding his comments. Page 2 of 2