Loading...
SPECIAL INSPECTIONS REPORTMULHERN+KULP RESIDENTIAL _�'Pik, `U'All :%- Vf IE P;="_ 300 Bictwioe Averiue, Boildiln 4, Ambler, ?A 190C2 ► p 2 � 5 64E t?Du • mtdhemkulp ccoll January 8, 2020 Andrea Molitor DAZ LLC 9134 1841h St SW Edmonds, WA 98020 DAZ LLC REMODEL Edmonds, WA INSPECTION REVIEW RESPONSE M+K Project #: 203-19009 Reference Technical note P300, published by APA, attached Andrea; Pursuant to your request, we are providing this letter to address the structural items resulting from the above referenced inspection review comments for the above referenced single-family home in the city of Edmonds. Below, please find the review comment, followed by our response. INSPECTION REVIEW COMMENTS Comment., Provide the specification for the nail spacing from the roof 05B panels to the existing skip sheathing. Response: The exert from the P300 technical note published by the APA given to the framer is for the roof sheathing panels fastened through the spaced boards to the framing below. The as -built condition is the roof sheathing panels fastened directly to the spaced boards. The APA P300, attached, has specifications for the panel attachment directly to the spaced boards, but note that the spacings provided are recommended, not a code requirement. It is our professional opinion that 0.113" diameter nails spaced at 6" on center at the vertical edges and 12" on center vertically in the field, 24" maximum apart, are adequate to resist all code required uplift. The new sheathing provided will not act as the diaphragm, and therefore does not need to meet the fastening requirements of a roof diaphragm. The existing skip sheathing fastened directly to the framing below acts as the roof diaphragm. Please feel free to call if you have any questions. Respectfully, MULHERN & KULP STRUCTURAL ENGINEERING, INC. 1kL Richard J. Zabel, P.E. Project Engineer Nicholas J. Martignetti, P.E. Project Manager P.•I Client FilesI103 - ArchitecturallnnovationslProposalsl DAZLLCRemodel - Edmonds