ENGINEERING SPECIAL INSPECTION REPORTMEMORANDUM To: Natalie Griggs, COE Copy: Nick Chou, ESD Will Thomsen, ESD Dan Reynolds, WYS Robert Reynolds, WYS From: Robert Harding, DAH Dominique Doyal, DAH Date: January 8, 2020 rljr DA HOGAN Re: Edmonds Woodway HS Multi -Purpose Field Drainage, Aggregate and Turf Installation Inspections/Reports The following is a collection of documents from DA Hogan and Associated Earth Sciences that were created to record the specific construction stage that involved installation of drainage, permeable aggregate and synthetic turf at Edmonds Woodway High School. DA Hogan and Associated Earth Sciences both accepted the process and resulting quality of the drainage system installed. The synthetic turf shall be accepted pending punch list completion. The attached documents include: • DA Hogan field reports for each week that drainage work was performed • DA Hogan synthetic turf punch list of the multipurpose field • Associated Earth Sciences field reports during the period of installation of drainage • Associated Earth Sciences sieve reports of permeable aggregate DA Hogan recommends approval for special inspections on the drainage, aggregate and turf installation at Edmonds Woodway High School based on the observations/results presented in the following reports. OF WASH P �rd�a\Mt' 8 Mq y ��� Z r � ► 7 y ti U ti OS C "�" Ex P.0'Il$\ C; O� qPE AR Robert Harding, RLA D.A. Hogan & Associates, Inc. 119 111 Avenue South, Suite 110 Seattle, WA 98104 ► ' - AN V. • :, Dave Anderson, PE 4--, (206) 285-0400 Tel (206) 285-0480 Fax August 13-16, 2019 Nick Chou, Capital Project Manager Edmonds School District 20420 68th Ave W Lynnwood, WA 98036-7400 cc: Dan Reynolds, Wyser Construction KI-rTDA HOGAN Re: Edmonds Woodway High School, Synthetic Turf Conversion Drainage system special inspection, Multi -purpose field D.A. Hogan was on site on the week of August 13-16, 2019 to inspect lateral lines W-28 through W- 26 on the 13th, W-25 through W-23 on the 14th, W-22 through W-21 on the 15th, and W-20 through W-19 on the 16th. Trench depth and subgrade elevations were inspected in multiple areas and approved. It was confirmed by DA Hogan that there was 2" below each lateral line pipe per plan. Pea gravel from the pile of aggregate on site was tested and approved per specification. In conclusion, all inspections were approved and the lateral lines were constructed per specification/drawings. See below pictures of progress during this week in August. 1. Lateral lines W-28 through W-25 completed and in progress of installing W-24. D.A. Hogan & Associates, Inc. (206) 285-0400 Tel 119 11' Avenue South, Suite 110 (206) 285-0480 Fax Seattle, WA 98104 2. Lateral lines W-28 through W-20. Lateral line W-19 yet to be trenched. 3. Approximately 200 If of collector line trenched and placed. D.A. Hogan & Associates, Inc. 119 11' Avenue South, Suite 110 Seattle, WA 98104 (206) 285-0400 Tel (206) 285-0480 Fax 4. Trenching in progress at lateral line W-20 5. 2 inches of pea gravel installed beneath each pipe. Sincerely, Robert Harding Principal Landscape Architect D.A. Hogan & Associates, Inc. (206) 285-0400 Tel 119 11t Avenue South, Suite 110 (206) 285-0480 Fax Seattle, WA 98104 September 11-12, 2019 Nick Chou, Capital Project Manager Edmonds School District 20420 68th Ave W Lynnwood, WA 98036-7400 cc: Dan Reynolds, Wyser Construction KI-rTDA HOGAN Re: Edmonds Woodway High School, Synthetic Turf Conversion Drainage system special inspection, Multi -purpose field D.A. Hogan was on site while construction was going on September 11th and 12th, 2019 to inspect lateral lines E-28 through E-24 on the 11th and E-23 through E-19 on the 12th. Trench depth and subgrade elevations were inspected in multiple areas and approved. It was confirmed by DA Hogan that there was 2" below each lateral line pipe per plan. Pea gravel from the pile of aggregate on site was tested and approved per specification. Heavy rainfall hit the site and left standing water and a small layer of soft soil on the subgrade. Since the subgrade was at the correct elevation it was deemed acceptable by DA Hogan to continue with import of base course aggregate. Base course aggregate was collected on site and tested/approved by AESI. In conclusion, all inspections were approved and the lateral lines were constructed per specification/drawings. See below pictures of progress during these two days in September. D.A. Hogan & Associates, Inc. (206) 285-0400 Tel 119 11' Avenue South, Suite 110 (206) 285-0480 Fax Seattle, WA 98104 1. Lateral lines E -28 through E-19 completed. The top layer of subgrade was wet and therefore softer because of the heavy rain the night before. Sincerely, Robert Harding Principal Landscape Architect D.A. Hogan & Associates, Inc. (206) 285-0400 Tel 119 11t Avenue South, Suite 110 (206) 285-0480 Fax Seattle, WA 98104 September 16-20, 2019 Nick Chou, Capital Project Manager Edmonds School District 20420 68th Ave W Lynnwood, WA 98036-7400 cc: Dan Reynolds, Wyser Construction KI-rTDA HOGAN Re: Edmonds Woodway High School, Synthetic Turf Conversion Drainage system special inspection, Multi -purpose field D.A. Hogan was on site on the week of September 16t"-20t" 2019 to inspect lateral lines E-18 through E-17 on the 16t", and E-16 through E-14 on the 18t". Trench depth and subgrade elevations were inspected in multiple areas and approved. It was confirmed by DA Hogan that there was 2" below each lateral line pipe per plan. Pea gravel from the pile of aggregate on site was tested and approved per specification. Heavy rainfall hit the site and left standing water and a small layer of soft soil on the subgrade. Since the subgrade was at the correct elevation it was deemed acceptable by DA Hogan to continue with import of base course aggregate. Base course aggregate was collected on site and tested/approved by AESI. In conclusion, all inspections were approved and the lateral lines were constructed per specification/drawings. See below pictures of progress during these two days in September. D.A. Hogan & Associates, Inc. (206) 285-0400 Tel 119 11t Avenue South, Suite 110 (206) 285-0480 Fax Seattle, WA 98104 1. Lateral lines E -18 through E-14 in progress. They would finish these lines on this day. 2. Later line E-18 thi completed and b� being stock piled. Sincerely, UOR Robert Harding Principal Landscape Architect D.A. Hogan & Associates, Inc. (206) 285-0400 Tel 119 11t Avenue South, Suite 110 (206) 285-0480 Fax Seattle, WA 98104 D.A. Hogan & Associates, Inc. (206) 285-0400 Tel 119 11' Avenue South, Suite 110 (206) 285-0480 Fax Seattle, WA 98104 September 21-25, 2019 Nick Chou, Capital Project Manager Edmonds School District 20420 68th Ave W Lynnwood, WA 98036-7400 cc: Dan Reynolds, Wyser Construction KI-rTDA HOGAN Re: Edmonds Woodway High School, Synthetic Turf Conversion Drainage system special inspection, Multi -purpose field D.A. Hogan was on site on the week of September 23rd-27th, 2019 to inspect lateral lines W-17 through W-15 on the 23rd, W-14 through W-10 on the 24th, W-9 through W-4 on the 26th, and W-3 through W-1/ E-1 through E-5 on 27th. Trench depth and subgrade elevations were inspected in multiple areas and approved. It was confirmed by DA Hogan that there was 2" below each lateral line pipe per plan. Pea gravel from the pile of aggregate on site was tested and approved per specification. Heavy rainfall hit the site and left standing water and a small layer of soft soil on the subgrade. Subgrade in an area of 9,400 sf in right field of the baseball field is showing minor signs of being unsuitable. Wyser rehabilitated the soil to best of their ability and added geotextile structural fabric (Geogrid tensor TX 160) in between lateral lines W-16/W-15, W-15/W-14, and W- 14/W-13. In are between W-16 and W-13 the base course aggregate will be installed in one 12.2" lift to avoid unnecessary vehicle traffic to protect base integrity. After this addition, the subgrade was at the correct elevation and was deemed acceptable by DA Hogan to continue with import of base course aggregate. Base course aggregate was collected on site and tested/approved by AESI. In conclusion, all inspections were approved and the lateral lines were constructed per specification/drawings. See below pictures of progress during these two days in September. D.A. Hogan & Associates, Inc. (206) 285-0400 Tel 119 11' Avenue South, Suite 110 (206) 285-0480 Fax Seattle, WA 98104 1. Lateral lines W -17 through W- F' 10 in progress. There was an F inquiry from Wyser about soil WV41"W, being acceptable to cover after rainstorm. 2. Base course being stock piled and spread across complete areas. D.A. Hogan & Associates, Inc. (206) 285-0400 Tel 119 11' Avenue South, Suite 110 (206) 285-0480 Fax Seattle, WA 98104 3. Geotextile structural fabric (Geogrid tensor TX 160) placed on soil in between laterals W-16 and W-13 to help support soil. 4. After Geogrid was installed lateral lines W-17 through W-10 were now accepted and could start import of base aggregate. D.A. Hogan & Associates, Inc. (206) 285-0400 Tel 119 11t Avenue South, Suite 110 (206) 285-0480 Fax Seattle, WA 98104 5. Lateral lines E-1 through E-5 trenched backfilled and partially covered with base course permeable aggregate. Lateral lines W-9 through W-1 completed and covered. Sincerely, Robert Harding Principal Landscape Architect D.A. Hogan & Associates, Inc. (206) 285-0400 Tel 119 11' Avenue South, Suite 110 (206) 285-0480 Fax Seattle, WA 98104 September 30- October 4, 2019 Nick Chou, Capital Project Manager Edmonds School District 20420 68th Ave W Lynnwood, WA 98036-7400 cc: Dan Reynolds, Wyser Construction KI-rTDA HOGAN Re: Edmonds Woodway High School, Synthetic Turf Conversion Drainage system special inspection, Multi -purpose field D.A. Hogan was on site on the week of September 30t"- October 41", 2019 to inspect lateral lines E-6 through E-11 on the 30t" and E-12 through W-13 on the 151. Trench depth and subgrade elevations were inspected in multiple areas and approved. It was confirmed by DA Hogan that there was 2" below each lateral line pipe per plan. Pea gravel from the pile of aggregate on site was tested and approved per specification. Heavy rainfall hit the site and left standing water and a small layer of soft soil on the subgrade. The subgrade was at the correct elevation and was deemed acceptable by DA Hogan to continue with import of base course aggregate. Base course aggregate was collected on site and tested/approved by AESI. In conclusion, all inspections were approved and the lateral lines were constructed per specification/drawings. See below pictures of progress during these two days in September. 1. Lateral lines E-6 through E-11 in progress. D.A. Hogan & Associates, Inc. (206) 285-0400 Tel 119 11' Avenue South, Suite 110 (206) 285-0480 Fax Seattle, WA 98104 2. Base course being stock piled and spread across complete areas. 3. Checking trench elevations to ensure slope is per plans. A secondary check was made for the elevation of the 2" of pea gravel added beneath the pipe. D.A. Hogan & Associates, Inc. (206) 285-0400 Tel 119 11' Avenue South, Suite 110 (206) 285-0480 Fax Seattle, WA 98104 4. Lateral lines E-12 through E-13 complete. Base course being stock piled and spread across all complete areas. Sincerely, Robert Harding Principal Landscape Architect D.A. Hogan & Associates, Inc. (206) 285-0400 Tel 119 11t Avenue South, Suite 110 (206) 285-0480 Fax Seattle, WA 98104 MEMORANDUM TO: Nick Chou, ESD COPY: Dan Reynolds, Wyser Construction Robert Reynolds, Wyser Construction Jeff Bergevin, SprinTurf Cody Alton, SprinTurf FROM: Dominique Doyal, D. A. Hogan Robert Harding, D.A. Hogan DATE: November 13, 2019 KrDA HOGAN RE: Edmonds Woodway High School, Synthetic Turf Conversion Punch List Inspection Substantial Completion Recommendation, Multipurpose Field (Synthetic Turf only) DA Hogan & Associates was on site for an inspection of work in progress on Wednesday, November 13, 2019. The following represents a preliminary punch list inspection for items related to the synthetic turf surfacing. SITE OBSERVATIONS / PUNCH LIST Softball Field 1. Manhole/Nyoplast Catch Basin/Synthetic Turf Cover on left outfield foul line, that lies on top of the detention chamber system, is not installed. Reinstall and provide flush transition. 2. Brush lines straight. This occurs throughout the field, but is more noticeable at the 50-yard line of soccer/football field, and extension of the soccer field mid field line. Pick lines at 50 YL/Mid field line. 3. Buried fibers were found on the soccer midfield line near 2nd base. Untrap fibers at this location and any other areas where fibers may have been glued or sewed down. 4. Multiple seams are visible in the field. Hand pick out fibers to untrap fiber and mask all seams. 5. Quick coupler valve between 3r1 base dugout and bullpen is not flush. Repair to flush condition, consistent with other quick coupler valve boxes. The record above represents the Engineer's understanding of the site conditions observed, discussions held, and decisions made during the visit. Any amendments or revisions to this record should be communicated to D.A. Hogan & Associates within seven days of receipt. D.A. Hogan & Associates, Inc. (206) 285-0400 Tel 119 First Ave. S., Suite 110 (206) 285-0480 Fax Seattle, WA 98104 6. Overall infill levels in the field are inconsistent, with layers of sand, and cork resulting in 1"-1.5" depth of infill (25mm-38mm). Bullpen and batting cage areas have up to same range of infill. Additional infill and/or grooming is required to result in approximately .75"-.50" of exposed fiber. Relevel infill. 7. Remove cork from wall drains in right field. Remove/clean up any cork outside of field. 8. Clean up loose fiber and rock/dirt debris on the field. Maintenance access, in particular, has heavy traffic causing dirt on the turf. 9. Trim J-hooks and long fibers throughout the field. 10. After field is brushed, and infill levels are brought to tolerance (+/- 5mm), this preliminary punch list will be completed in its entirety after additional infill is applied and leveled on the field surface. 11. Document quantities of sand/cork installed. 12. Provide GMAX tests 13. Provide warranty documents and O/M Manual 14. Provide O/M Manual for furnished equipment Photos 1. Install synthetic turf cover on nyoplast MH. Clean rock/dirt debris from synthetic turf. Edmonds Woodway High School Softball Field Field Report November 13, 2019 Page 2 of 5 2. Pick seams to untrap fiber, throughout field. Edmonds Woodway High School Softball Field Field Report November 13, 2019 Page 3 of 5 3. Brush Lines Straight and pick trapped fiber to expose all fibers of lines. 4. Synthetic turf covers at quick coupler valve and Nyoplast CB incomplete, or not flush with adjacent turf. . Edmonds Woodway High School Softball Field Field Report November 13, 2019 Page 4 of 5 ,�g'il�.c �.,... "w..�c w �"✓. k_Ei, .7. xx�? , . - _�'�3iF��-,v�t wi��� ;�1' ... ....,e a s s c a t e d earth° scliences incorporated 911 Fifth Avenue Kirkland, Washington 98033 Phone: 425-827-7701 Fax: 425- 827-5424 www.aesgeo.com TO: D.A. Hogan and Associates, Inc. 119 1st Avenue South #110 Seattle, WA 98104 ATTN: Bob Harding (bobh@dahogan.com) AS REQUESTED BY: Contractor FIELD REPORT Pase 1 of 3 Date Project Name Project No. /Task Edmonds Woodway HS Athletic 9/20/2019 Field Improvements 1602S7E002 Location Municipality Weather 7600 212th Street Southwest Edmonds PC, 60's Permit No. SDCI Permit No. Report No. N/A 26 Engineer/Architect LPD Engineering Client/Owner D.A. Hogan and Associates Inc. General Contractor/Superintendent Wyser Construction Grading Contractor/Superintendent Wyser Construction THE FOLLOWING WAS NOTED: AESI arrived on site in the late afternoon, at the request of the contractor. While on site, we met with Robert from Wyser Construction. Sieve Sample Collection: While onsite, we collected a sample of base course permeable aggregate for sieve analysis. Excavation Observation: Prior to our arrival, the contractor stripped 4" of loose, wet soils from the northeast end of the baseball field (Figure 1). They then re - compacted the more competent soil underneath with a large and small vibratory roller (Figure 2). Contractors were placing base course permeable aggregate over the southern portion of the field (Figure 3). Copies To: Date Mailed: V. 5.17 Distribution 9/24/2019 Field Rep:, Esten King, Field Technician Principal / PM: Bruce Guenzler, L.G., L.E.G. ri5cl This document is considered a DRAFT until signed or initialed by an AE51 Principal or Project Manager AESI FIELD REPORT To: D.A. Hogan and Associates, Inc. Project Name: Edmonds Woodway HS Athletic Field Improvements Date: 9/20/2019 Project No.: 160257E002 Permit No. SDCI Permit N/A Figure 1. Loose, wet soil stripped from field looking northeast. Copies To: Date Mailed: 9/24/2019 v. 5 17 Page 2 of 3 Field Rep: Esten King, Field Technician Principal / PM: Bruce Guenzler, L.G., L.E.G. This document is considered a DRAFT until signed or initialed by an AESI Principal or Project Manager AESI FIELD REPORT Page 3 of 3 To: D.A. Hogan and Associates, Inc. Project Name: Edmonds Woodway HS Athletic Field Improvements Date: 9/20/2019 Project No.: 160257E002 Permit No. SDCI Permit N/A Figure 3. Base course permeable aggregate over previously placed structural fill, looking southwest. — _—=—�=�_ - _ _ ... _ _ .... _ _ _ _ " - _ _ - _ _ ._ � - '•tea s.. Copies To: Date Mailed: v. 5.17 9/24/2019 .A& Field Rep: Esten King, Field Technician Principal / PM: Bruce Guenzler, L.G., L.E.G. This document is considered a DRAFT until signed or initialed by an AESI Principal or Project Manager a s s o c i a t e d e a r t h s c i e n c e s incorporated 911 Fifth Avenue Kirkland, Washington 98033 Phone: 425-827-7701 Fax: 425- 827-5424 www.aesgeo.com To: D.A. Hogan and Associates, Inc._ 119 1st Avenue South #110 Seattle, WA 98104 _ ATTN: Bob Harding (both@danogan.com) UeneraiwnuaLwr73uNerrnienueni Wyser Construction AS REQUESTED BY: Contractor Grading Contractor/Superintendent .... ... ... __.... ........ _--__--- -- Wyser Construction THE FOLLOWING WAS NOTED:_ AESI arrived on site in the late afternoon, at the request of the contractor. While on site, we met with Robert from Wyser Construction. FIELD REPORT Date Project Name Edmonds Woodway HS Athletic 9/25/2019 Field Improvements Location Municipality 7600 212th Street Southwest Edmonds Permit No. i SDCI Permit No. j N/A Page 1 Project No. /Task 160257EO02 Weather Sunny, 70's Report No 27 Engineer/Architect LPD Engineering Client/Owner D.A. Hogan and Associates Inc. Sieve Sample Collection: While onsite, we collected a sample of base course permeable aggregate from a pile being incorporated as production for sieve analysis. Copies To: Date Mailed v. 5.17 Distribution 10/30/2019 Field Rep: Esten King, Field Technician Principal / PM: Bruce Guenzler, L.G., L.E.G. 1364 This document is considered a DRAFT until signed or initialed by on AE51 Principal or PrOjeEt Manager n Field Perm. Aaa. Section 33 46 23 Fir-, % Gravel % Sand % Fines % +3" Coarse Fine Coarse Medium Fine Silt Clay 0.0 38.1 50.2 4.0 3.3 2.0 2.4 TEST RESULTS Opening Percent Spec." Pass? Size Finer (Percent) (X=Fail) 1" 100.0 90.0 - 100.0 3/4" 61.9 80.0 - 100.0 X 1/2" 30.0 50.0 - 80.0 X 3/8" 18.7 40.0 - 60.0 X #4 11.7 15.0 - 40.0 X #8 8.3 10.0 - 20.0 X #10 7.7 #20 5.6 #30 5.0 5.0 - 15.0 #40 4.4 #60 3.8 #100 3.2 0.0-3.0 X #200 2.4 0.0 - 2.0 X Field Perm. Agg. Section 33 46 23 Location: Import a s s o c i a t e d e a r t h s c i e n c e s incorporated Material Description Base Course Permeable Aggregate Atterberg Limits (ASTM D 4318) PL= NP LL= NV PI= Classification USCS (D 2487)= GW AASHTO (M 145)= A-1-a Coefficients D90= 23.6710 D85= 22.8381 D60= 18.7302 D50= 16.9396 D30= 12.6893 D15= 8.0067 D10= 3.3234 Cu= 5.64 Cc= 2.59 Remarks Date Received: 8-30-19 Date Tested: 8-30-19 Tested By: MS Checked By: BG Title: Client: D.A. Hogan and Associates Inc. Project: Edmonds Woodway Date Sampled: 8-30-19 n Base Course Permeable Aaare ate Edmonds/L nnwood - rrp % Gravel % Sand % Fines % +3" Coarse Fine Coarse Medium Fine Silt Clay 0.0 15.3 60.8 11.6 7.0 2.4 2.9 TEST RESULTS Opening Percent Spec." Pass? Size Finer (Percent) (X=Fail) 1" 100.0 90.0 - 100.0 3/4" 84.7 80.0 - 100.0 1/2" 56.7 50.0 - 80.0 3/8" 42.0 40.0 - 60.0 #4 23.9 15.0 - 40.0 #8 13.9 10.0 - 20.0 #10 12.3 #20 7.2 #30 6.1 5.0 - 15.0 #40 5.3 #60 4.3 #100 3.6 0.0-3.0 X #200 2.9 0.0 - 2.0 X Base Course Permeable Aggregate Edmonds/Lynnwood Location: Imported - production piles a s s o c i a t e d e a r t h s c i e n c e s incorporated Material Description Sandy GRAVEL trace silt - Base course permeable aggregate Atterberg Limits (ASTM D 43181 PL= NP LL= NV PI= NP Classification USCS (D 2487)= GW AASHTO (M 145)= A-1-a Coefficients D90= 20.8692 D85= 19.1557 D60= 13.3695 D50= 11.3161 D30= 6.4636 D15= 2.6065 D10= 1.4722 Cu= 9.08 Cc= 2.12 Remarks Date Received: 9/27/19 Date Tested: 9/30/19 Tested By: ALM Checked By: BG Title: Date Sampled: 9/25/19 Client: DA Hogan and Associates Inc Project: Edmonds Woodway HS Athletic Field Improvements 100 90 80 70 W z 60 z 50 W U 0' 40 W 0_ 30 20 10 Particle Size Distribution Report C o00 C C C C C C 7 N 0 7 0 n Field Perm. Agg. Section 33 46 23 LL T--- T�� -- 100 10 1 0.1 0.01 0.001 ('RAIN .17F - mm % +3" % Gravel % Sand % Fines Coarse Fine Coarse Medium Fine Silt Clay 0.0 20.8 54.3 10.7 8.2 3.1 2.9 TEST RESULTS Opening Percent Spec." Pass? Size Finer (Percent) (X=Fail) 1.25" 100.0 100.0 1" 96.3 90.0 - 100.0 3/4" 79.2 80.0 - 100.0 X 1/2" 52.0 50.0 - 80.0 3/8" 41.4 40.0 - 60.0 #4 24.9 15.0 - 40.0 #8 15.5 10.0 - 20.0 #10 14.2 #20 8.3 #30 7.0 5.0 - 15.0 #40 6.0 #60 4.6 #100 3.7 0.0-3.0 X #200 2.9 0.0 - 2.0 k Field Perm. Agg. Section 33 46 23 Location: Import Material Description Base Course Permeable Aggregate Atterberg Limits (ASTM D 4318) PL= LL= NV PI= Classification USCS (D 2487)= GW AASHTO (M 145)= Coefficients D90= 22.3263 D85= 20.6671 D60= 14.5669 D50= 12.1848 D30= 6.1137 D15= 2.2200 D10= 1.1437 Cu= 12.74 Cc= 2.24 Remarks Date Received: 8-22-19 Date Tested: 8-22-19 Tested By: MS Checked By: BIG Title: a s s o c i a t e d Client: D.A. Hogan and Associates Inc. e a r t h s c i e Inc e s project: Edmonds Woodway i n c o r p o rat e d Prnipr_+Nn• KF1F0'K7A Date Sampled: 8-22-19