Loading...
0297_001f3u lom _w l Western Engineers Inc. SURVEYORS • PLANNERS • ENGINEERS 13000 Highway 99 South * Everett, Washington 98204 (425) 356-2700 Today's Date: October 10, 2020 FAX (425) 356-2708 HEIGHT CERTIFICATION -FINAL MG GROUP, LLC Project File Number: 07-850-B MG GROUP LLC Project Address: Building Plan References: 8710 — 196TH STREET SW Approved Site Plan Dated MAY 05, 2020 EDMONDS, WA. (Prepared by ARCHITECTS NW) Site Benchmark ( 386.79 Feet): The site benchmark is described as the top of curb plug on 1961" Street SW as per PLN 20150011 as shown and highlighted on the approved site plan (see attached) Maximum Building Height (405.00 Feet): The maximum building height, as defined on the approved site plan attached is stated as 405.00' (four -hundred -five & 00/100 feet). Highest Point of structure's roofline ( 404.97 Feet ): The highest point of the existing roofline was measured near the center of the existing structure on top of the existing roofing materials. Although the building is still under construction, the roof is substantially completed. Conclusion: After reviewing the elevation measurements recorded by our field personnel this morning, relative to the site benchmark and maximum building height defined herein, it is my opinion that that the highest measured point on the roofline is 0.03' below the herein stated maximum building height. The measured elevations stated herein have a specified precision, based on the surveying measurement methods utilized, of +/- 0.02'. However, even if the maximum defined error is added to the highest point, the existing structure's roofline was constructed below the maximum building height, as defined herein. Kenneth L. Long Professional Land Surveyor Washington License No. 16916 Encl. LAND USE CONSULTANTS * CIVIL ENGINEERS * LAND SURVEYORS * ENGINEERING CORPORATION