Mountlake Terrace Interlocal Agreement for 228th St SW Corridor Improvements Project Design and Construction228'`' ST. SW CORRIDOR IMPROVEMENTS PROJECT DESIGN AND CONSTRUCTION between THE CITY OF MOUNTLAKE TERRACE and THE CITY OF EDMONDS THIS INTERLOCAL AGREEMENT (hereinafter "the Agreement") is entered into under the authority of the Interlocal Cooperation Act, Chapter 39.34 RCW, by and between the City of Mountlake Terrace (hereinafter "MOUNTLAKE TERRACE"), a municipal corporation organized under the laws of the State of Washington, and the City of Edmonds (hereinafter "EDMONDS"), a municipal corporation organized under the laws of the State of Washington (individually "Party" and collectively "the Parties"), to provide for the design and construction of the 2281h St. Corridor Improvements Project, and to define the Parties' respective rights, obligations, costs and liabilities regarding this undertaking. RECITALS WHEREAS, Chapter 39.34 RCW authorizes two or more political subdivisions or units of local government of the State of Washington to cooperate on a basis of mutual advantage to provide for services and facilities; and WHEREAS, EDMONDS is completing the designs for their 228th Corridor Improvements to improve EDMONDS' transportation system by constructing a new section of 228"' St between State Route 99 and 76"' Ave and installing new traffic signals at the intersections of 228"' St and State Route 99 and 228"' St and 76"' Ave and other related transportation improvements; and WHEREAS, EDMONDS is completing the designs for their State Route 99 Illumination Improvements Project to enhance street lighting on State Route 99 between 220"' St and 212"' St; and WHEREAS, EDMONDS plans to bid both projects together in an effort to achieve more favorable bids on both projects; and WHEREAS, for the purposes of this Agreement, the 228"' Corridor Improvements Project and State Route 99 Illumination Improvements Project shall be referred to collectively as the "228"' CORRIDOR PROJECT"; and WHEREAS, the 228"' CORRIDOR PROJECT has received federal and state grants that must be spent in a timely manner; and WHEREAS, EDMONDS has been working with a qualified design consultant to complete the plans, specifications and estimates (hereinafter "CONTRACT BID DOCUMENTS") for the 228"' CORRIDOR PROJECT; and WHEREAS, EDMONDS agreed during the preliminary designs to use grant funds to pay 86.5% of the design and construction costs for a 2-inch pavement grind and overlay of 228"' St/Lakeview Drive in MOUNTLAKE TERRACE; and WHEREAS, MOUNTLAKE TERRACE agreed during the preliminary designs to reimburse EDMONDS the remaining 13.5% of design and construction costs for a 2- inch pavement grind and overlay of 228th St/Lakeview Drive; and WHEREAS, MOUNTLAKE TERRACE made the determination during final designs to reconstruct 228th St/Lakeview Drive in lieu of a 2-inch pavement grind and overlay; and WHEREAS, EDMONDS has agreed at MOUNTLAKE TERRACE'S request to include the following improvements in the 228TH CORRIDOR PROJECT and CONTRACT BID DOCUMENTS: 1. Reconstruction of 228th St/Lakeview Drive between stations 19+17 and 36+30 as depicted on drawing # PV04 — PV08 attached hereto; and 2. Construction of four (4) pedestrian curb ramps on 2281h St/Lakeview Drive; and 3. Installation of one (1) 2-inch diameter conduit between stations 13+20 and 23+50 for MOUNTLAKE TERRACE'S fiber optic traffic signal coordination system as depicted on drawing ICO2 attached hereto. WHEREAS, MOUNTLAKE TERRACE agrees to reimburse EDMONDS for 13.5% of the design cost to complete a 2-inch pavement grind and overlay of 2281h St/Lakeview Drive; and WHEREAS, MOUNTLAKE TERRACE agrees to reimburse EDMONDS for 13.5% of the actual construction cost of a 2-inch pavement grind and overlay of 228th St./Lakeview Drive as determined by the schedule of work in Exhibit B using unit bid prices specified in the awarded construction contract for the 228TH CORRIDOR PROJECT; and WHEREAS, MOUNTLAKE TERRACE agrees to reimburse EDMONDS for the actual cost to design and reconstruct 228t1' St/Lakeview Drive that exceeds the actual construction cost of a 2-inch pavement grind and overlay, as determined by the schedule of work in Exhibit `B" using unit bid prices specified in the awarded construction contract for the 228TH CORRIDOR PROJECT; and WHEREAS, EDMONDS agrees to use grant funds to pay 86.5% of the design and construction cost to replace four (4) pedestrian curb ramps on 228"' St/Lakeview Drive, since this work would have been required as part of a 2-inch pavement grind and overlay; and WHEREAS, MOUNTLAKE TERRACE agrees to reimburse EDMONDS the remaining 13.5% of the design and construction costs for replacing four (4) pedestrian curb ramps on 228th St/Lakeview Drive; and 2 WHEREAS, MOUNTLAKE TERRACE agrees to reimburse EDMONDS for all design and construction costs to install one (1) 2-inch diameter conduit and pull boxes between stations 13+20 and 23+50; and WHEREAS, Exhibit "A" is a preliminary summary of design fees, opinion of construction costs, estimated construction management costs and estimated allocation of costs between EDMONDS AND MOUNTLAKE TERRACE for: (1) 2-inch pavement grind and overlay of 2281h St/Lakeview Drive; (2) pavement reconstruction of 228"' St/Lakeview Drive; (3) construction of four pedestrian curb ramps; and (4) installation of one 2-inch diameter conduit between stations 13+20 and 23+50 as depicted on drawing ICO2; and WHEREAS, the construction of the 228th CORRIDOR PROJECT is scheduled to begin in spring 2015; and WHEREAS, the Parties desire to enter into this Agreement for the purpose of defining their respective rights, obligations, costs and liabilities regarding this undertaking; and - WHEREAS, the City Councils of the City of Mountlake Terrace and the City of Edmonds have taken appropriate action to approve their respective City's entry into this Agreement; NOW, THEREFORE, in consideration of the terms, conditions and covenants contained herein, the Parties agree as follows: TERMS Section 1. Purpose. The purpose of this Agreement is to allocate and define the Parties' respective rights, obligations, costs and liabilities concerning the establishment, operation and maintenance of this undertaking. This Agreement further seeks to establish a' formal arrangement under which MOUNTLAKE TERRACE will reimburse EDMONDS for: • 13.5% of the design cost to complete a 2-inch pavement grind and overlay of 2281h St/Lakeview Drive; and • 13.5% of the actual construction cost of a 2-inch pavement grind and overlay, as determined by the schedule of work in Exhibit "B" using unit bid prices specified in the awarded construction contract for the 228TH CORRIDOR PROJECT; and • The actual cost to design and reconstruct 228"' St/Lakeview Drive that exceeds the actual construction cost of a 2-inch pavement grind and overlay, as detennined by the schedule of work in Exhibit `B" using unit bid prices specified in the awarded construction contract for the 228TH CORRIDOR PROJECT; and 3 • 13.5% of the grant matching funds for the costs of design and construction to replace four (4) pedestrian curb ramps on 228th St/Lakeview Dr.; and • All design and construction costs to install one (1) 2-inch diameter conduit and pull boxes between stations 13+20 and 23+50, as shown on Sheet ICO2 for its fiber optic traffic signal coordination. system, all as part of the 228th CORRIDOR PROJECT. Section 2. Term. This Agreement shall be effective upon execution by the Parties hereto. Unless terminated in accordance with Section 3, this Agreement shall remain in effect until: (a) MOUNTLAKE TERRACE's written acceptance of all infrastructure provided herein; or (b) December 31, 2017, which ever shall first occur. Provided however, the Parties may at their option, renew and/or amend this Agreement for a mutually agreed upon term by a writing signed by both Parties. Section 3. Termination. Prior to the award of the contract for the 228th CORRIDOR PROJECT, the Parties may mutually agree to terminate this Agreement, upon written notice by email or otherwise in which case this Agreement will be null and void. Provided however, if all bids on the 228th CORRIDOR PROJECT are greater than twenty percent (20%) over the engineer's estimate and EDMONDS determines not to award the contract, either Party may terminate this Agreement by providing the other Party with thirty (30) days written notice of its intent to terminate. Provided further, if the bid price for Bid Schedule D of CONTRACT BID DOCUMENTS on the 228th CORRIDOR PROJECT is greater than twenty percent (20%) over the engineer's estimate for Bid Schedule D, MOUNTLAKE TERRACE may terminate this Agreement by providing EDMONDS with thirty (30) days written notice of its intent to terminate. Provided further if the contract for the 228" CORRIDOR PROJECT work is awarded, the Parties may terminate this Agreement only for material breach of this Agreement, after providing the other party with thirty (30) days written notice of its intent to terminate. Notice shall state the reason(s) for termination. The breaching Party shall have the opportunity to cure the breach and/or mitigate damages. Termination or expiration shall not alter the MOUNTLAKE TERRACE payment obligations under Section 6 for services already rendered and shall not alter the Parties' respective obligations under Section 9 and Section 13 of this Agreement. Section 4. Obligations of MOUNTLAKE TERRACE. MOUNTLAKE TERRACE agrees to: A. Provide periodic payments to EDMONDS, pursuant to Section 6 of this Agreement, to reimburse EDMONDS for: 1. 13.5% of the design cost to complete a 2-inch pavement grind and overlay of 228th St/Lakeview Drive; and 2. 13.5% of the actual construction cost of a 2-inch pavement grind and overlay, as determined by the schedule of work in Exhibit "B" using unit bid prices specified in the awarded construction contract for the 228T" CORRIDOR PROJECT; and 3. The actual cost to design and reconstruct 228th St/Lakeview Drive that exceeds the actual construction cost of a 2-inch pavement grind and overlay, as determined by the schedule of work in Exhibit "B" using 11 unit bid prices specified in the awarded construction contract for the 228" CORRIDOR PROJECT; and 4. 13.5% of the grant matching funds for the costs of design and construction to replace four (4) pedestrian curb ramps on 228"' St/Lakeview Dr.; and 5. All design and construction costs to install one (1) 2-inch diameter conduits and pull boxes between stations 13+20 and 23+50 as shown on Sheet ICO2 for its fiber optic traffic signal coordination system, all as part of the 228th CORRIDOR PROJECT. B. Provide periodic payments to EDMONDS, pursuant to Section 6 of this Agreement, for construction management costs to administer Bid Schedule D as follows: a) at the documented hours invoiced to EDMONDS by its retained construction management company and design consultant for time spent on Bid Schedule D , plus b) the documented hours for EDMONDS' employees at the employee's direct hourly rate of pay and overhead rate for time spent on Bid Schedule D. C. Respond promptly to information requests submitted by EDMONDS or its agents regarding the pavement reconstruction, curb ramp installation, and conduit installation. D. Review and approve plans and specifications prepared by the consultant for the pavement reconstruction, curb ramp installation, and conduit installation (Bid Schedule D of CONTRACT BID DOCUMENTS). Approval shall not be unreasonably withheld. E. Provide (apply for and obtain) MOUNTLAKE TERRACE permits for any work to be performed within MOUNTLAKE TERRACE at no cost to EDMONDS. Provided, that nothing herein shall be construed as waiving or otherwise abridging MOUNTLAKE TERRACE'S regulatory authority for work within MOUNTLAKE TERRACE. No time restrictions shall be placed on such permits that would restrict EDMONDS' Contractor from working during the days and hours allowed in the CONTRACT BID DOCUMENTS. F.. Provide timely review of designs prepared by EDMONDS' consultant, and complete final design approval by the timelines established by EDMONDS to meet its construction bidding schedule. G. Obtain Bid Award Concurrence from the MOUNTLAKE TERRACE City Council in accordance with Section 7 within thirty (30) days of the bid opening. MOUNTLAKE TERRACE may withhold Bid Award Concurrence if the bid price for Bid Schedule D of CONTRACT BID DOCUMENTS on the 228"' CORRIDOR PROJECT is greater than 5 twenty percent (20%) over the engineer's estimate for Bid Schedule D. If the MOUNTLAKE TERRACE City Council does not provide Bid Award Concurrence within the 30-day time period, EDMONDS will eliminate this MOUNTLAKE TERRACE work from the contract and MOUNTLAKE TERRACE will be responsible for all costs to construct the three items outlined in paragraph 4A, above in a separate contract administered by MOUNTLAKE TERRACE. H. MOUNTLAKE TERRACE shall attend EDMONDS' weekly construction coordination meetings. I. MOUNTLAKE TERRACE will coordinate all corrections, concerns, issues, changes and contractor correspondence through the EDMONDS Project Manager. Section 5. Obligations of EDMONDS. EDMONDS agrees to: A. Assume responsibility for constructing the 228"' CORRIDOR PROJECT in accordance with the design plans approved by MOUNTLAKE TERRACE (including but not limited to securing all necessary consultants, contractors, and subcontractors). All construction contracts shall be procured through a formal competitive bidding process consistent with applicable State law. EDMONDS shall be solely and exclusively responsible for ensuring the compliance of said bidding process with all applicable procedures required under federal, state and local regulations. B. Submit to MOUNTLAKE TERRACE written invoices for payment in accordance with Section 6. Include copies of invoices from consultants and contractors, clearly indicating the MOUNTLAKE TERRACE portion of the invoices. Provide MOUNTLAKE TERRACE a brief written progress report with each invoice, describing in reasonable detail all work performed regarding pavement reconstruction, curb ramp installation, and conduit installation during the period covered by the invoice. C. Assume lead agency status and sole responsibility for applying for and obtaining any and all regulatory permits necessary to complete all work within MOUNTLAKE TERRACE for the 228"' CORRIDOR PROJECT. D. Provide MOUNTLAKE TERRACE personnel reasonable access to the 228°i CORRIDOR PROJECT'S construction area for purposes of monitoring the progress of work performed. E. Respond promptly to information requests submitted by MOUNTLAKE TERRACE or its agents regarding the 228"' CORRIDOR PROJECT. 0 F. Provide Construction Management and Inspection services for Bid Schedule D of CONTRACT BID DOCUMENTS (pavement reconstruction, curb ramp installation, and conduit installation), including inspection, materials submittal approvals, daily reports, and paynotes to accomplish construction. EDMONDS will provide MOUNTLAKE TERRACE with copies of inspection reports/logs, quantity takeoff sheets, paynotes, force account tracking, independent estimates and project correspondence when work has been completed on MOUNTLAKE TERRACE portions of the 228th CORRIDOR PROJECT. Section 6: Payment Schedule. The Parties agree to the following billing and payment schedule: A. For each outside construction contract expense incurred by EDMONDS regarding the 228"' CORRIDOR PROJECT as outlined in Section 4, above, EDMONDS shall, within sixty (60) days of the date EDMONDS is billed or invoiced for any undisputed charge by its consultants, contractors and subcontractors, submit an invoice to MOUNTLAKE TERRACE for its share of said expense for Bid Schedule D of CONTRACT BID DOCUMENTS (pavement reconstruction, curb ramp installation, and conduit installation). Said invoice shall contain a reasonably detailed explanation of the methodology utilized by EDMONDS in calculating the MOUNTLAKE TERRACE share of each expense. Construction contract(s) shall provide for separate bid schedules, or other means to clearly identify the MOUNTLAKE TERRACE portion of the project costs. Design contract(s) shall identify all tasks and work performed associated with MOUNTLAKE TERRACE portion of the design on invoices, fee estimates and project status reports. Time is of the essence and EDMONDS shall not unreasonably delay submittal of invoices for the MOUNTLAKE TERRACE share of expenses. B. Within thirty (30) days of receiving any invoice pursuant to subsection 6.A, MOUNTLAKE TERRACE shall tender payment to EDMONDS in the fonn of a check, money order or other certified funds for the invoiced amount; PROVIDED THAT: (1) The total payment by MOUNTLAKE TERRACE for invoices submitted by EDMONDS shall not exceed: • 13.5% of the design cost to complete a 2-inch pavement grind and overlay of 228`1' St/Lakeview Drive; and • 13.5% of the actual construction cost of a 2-inch pavement grind and overlay, as determined by the schedule of work in Exhibit "B" using unit bid prices specified in the awarded construction contract for the 228TH CORRIDOR PROJECT; and VA • The actual cost to design and reconstruct 228`' St/Lakeview Drive that exceeds the actual construction cost of a 2-inch pavement grind and overlay, as determined by the schedule of work in Exhibit `B" using unit bid prices specified in the awarded construction contract for the 228" CORRIDOR PROJECT; and • 13.5% of the grant matching funds for the costs of design and construction to replace four (4) pedestrian curb ramps on 2281h St/Lakeview Dr.; and • The actual construction costs to install one (1) 2-inch diameter conduit and pull boxes between stations 13+20 and 23+50 , as shown on Sheet ICO2 for its fiber optic traffic signal coordination system, all as part of the 228TH CORRIDOR PROJECT; and • The documented hours invoiced to EDMONDS by its retained construction management company and design consultant for time spent on Bid Schedule D , plus b) the documented hours for EDMONDS' employees at the employee's direct hourly rate of pay and overhead rate for time spent on Bid Schedule D; (2) EDMONDS failure to submit an expense invoice in a timely manner shall extend MOUNTLAKE TERRACE's payment obligation as reasonably necessary. (3) EDMONDS shall timely notify MOUNTLAKE TERRACE in writing if expenditures necessary to complete design, installation, and construction management of Bid Schedule D of CONTRACT BID DOCUMENTS (pavement reconstruction, curb ramp installation, and conduit installation) are expected to exceed these amounts. Section 7. Construction Bid Acceptance. Upon construction bid opening, EDMONDS shall obtain concurrence from MOUNTLAKE TERRACE prior to award of the pavement reconstruction, curb ramp installation, and conduit installation work as provided in Section 4, herein. Within 7 days after bid opening and prior to acceptance of the bid and award of a contract, EDMONDS shall provide written notice to MOUNTLAKE TERRACE of its financial .responsibility. Concurrence with bid award by EDMONDS shall take place as provided in Section 4.G herein. Section 8. Construction Change Orders. The following change order authorizations are hereby established for items of work to be paid by MOUNTLAKE TERRACE: A. The EDMONDS Public Works Director / City Engineer, with the prior written concurrence of the MOUNTLAKE TERRACE City Engineer, may authorize change order requests up to $40,000 per change order; PROVIDED that such change order does not place the total amount of change orders over the management reserve, in which case, the EDMONDS City Council must approve the change order. B. Each change order request exceeding $40,000 shall be reviewed by both EDMONDS (by its Mayor or City Council, as directed by its internal policies) and MOUNTLAKE TERRACE (by its City Council) for approval or denial, and any such approval shall require the concurrence of both Parties. C. MOUNTLAKE TERRACE approved change order(s) involving a change in scope shall have the scope change authorized in writing by MOUNTLAKE TERRACE, and shall be subject to and increase or decrease of the EDMONDS construction management fees set forth in Section 4.13. Section 9. Construction Claims and Disputes. If construction claims for additional payment are made by the construction contractor and/or disputes result regarding work in Bid Schedule D, EDMONDS shall endeavor to resolve the claims/disputes. Provided however, EDMONDS shall obtain MOUNTLAKE TERRACE approval prior to resolving the claims/disputes. MOUNTLAKE TERRACE will participate in resolving claims/disputes as necessary. Financial responsibility for approved construction claims/disputes arising from Bid Schedule D of CONTRACT BID DOCUMENTS (pavement reconstruction, curb ramp installation, and conduit installation) shall be the sole responsibility of MOUNTLAKE TERRACE. If such claims exceed the sums set forth in Section 6, MOUNTLAKE TERRACE shall authorize in writing additional sums to cover the cost of the claim/dispute. Section 10. Construction Project Acceptance. Upon satisfactory completion of Bid Schedule D of CONTRACT BID DOCUMENTS (pavement reconstruction, curb ramp installation, and conduit installation), resolution of all claims for additional payment, completion of all contract closeout documents and agreement between EDMONDS and the contractor, EDMONDS shall recommend final acceptance to the MOUNTLAKE TERRACE City Engineer. Approval by the MOUNTLAKE TERRACE City Council shall be the responsibility of MOUNTLAKE TERRACE staff. Section 11. Ownership and Disposition of Property. Bid Schedule D of CONTRACT BID DOCUMENTS (pavement reconstruction, curb ramp installation, and conduit installation) and all appurtenances thereof, constructed pursuant to this Agreement shall become and remain the exclusive property of MOUNTLAKE TERRACE upon completion. Section 12. Administration; No Separate Entity Created. Pursuant to RCW 39.34.030, the parties hereby appoint a Contract Administrator who will be responsible for administering this Agreement, and at the direction of the parties, this Contract 26 Administrator shall take such action as is necessary to ensure that this Agreement is implemented in accordance with its terms. The Parties hereby designate the EDMONDS Public Works Director, or his designee, as the Contract Administrator for this Agreement. No separate legal entity is formed by this Agreement. Section 13. Release, Indemnify, Defend and Hold Harmless Agreement. Each Party to this Agreement shall be responsible for its own negligent and/or wrongful acts or omissions, and those of its own agents, employees, representatives or subcontractors, to the fullest extent required by the laws of the State of Washington. Each Party agrees to protect, indemnify and hold the other Party harmless from and against any and all such liability for injury or damage to the other Party or the other Party's property, and also from and against all claims, demands, and causes of action of every kind and character arising directly or indirectly, or in any way incident to, in connection with, or arising out of work performed under the terms hereof, caused by its own fault or that of its agents, employees, representatives or subcontractors. Each Party specifically promises to indemnify the other Party against claims or suits brought under Title 51 RCW by its own employees, contractors, or subcontractors, and waives any immunity that each Party may have under that title with respect to, but only to, the limited extent necessary to indemnify the other Party. This waiver has been mutually negotiated by the Parties. Each Party shall also indemnify and hold the other party harmless from any wage, overtime or benefit claim of any of the first Party's employees, agents, representatives, contractors or subcontractors performing services under this Agreement. Each Party further agrees to fully indemnify the other Party from and against any and all costs of defending any such claim or demand to the end that the other Party is held harmless therefrom. Section 14. Governing Law and Venue. This Agreement shall be governed by the laws of the State of Washington. Any action arising out of this Agreement shall be brought in Snohomish County Superior Court. Section 15. No Employment Relationship Created. The Parties agree that nothing in this Agreement shall be construed to create an employment relationship between MOUNTLAKE TERRACE and any employee, agent, representative or contractor of EDMONDS, or between EDMONDS and any employee, agent, representative or contractor of MOUNTLAKE TERRACE. Section 16. Notices. Notices to MOUNTLAKE TERRACE shall be sent to the following address: City of Mountlake Terrace Public Works Director/Acting City Engineer 6100 219" St. SW, Suite 200 Mountlake Terrace, WA 98043 Notices to EDMONDS shall be sent to the following address: 10 City of Edmonds City Engineer 121 Fifth Avenue N. Edmonds, WA 98020 Section 17. Incorporation of Exhibits, Final Opinion of Costs/Schedules. Exhibits A and B and Final Opinion of Costs/Schedules are attached hereto and incorporated by reference as though fully set forth. Section 18. Duty to File Agreement With County Auditor. Pursuant to RCW 39.34.040, after this Agreement is executed by both Parties, EDMONDS shall either file this Agreement with the Snohomish County Auditor or make it available on the EDMONDS website. Section 19. Integration. This document constitutes the entire embodiment of the Agreement between the Parties, and, unless modified in writing by an amendment to this Interlocal Agreement signed by the Parties hereto, shall be implemented as described above. Section 20. Non -Waiver. Waiver by any Party of any of the provisions contained within this Agreement, including but not limited to any performance deadline, shall not be construed as a waiver of any other provisions. CITY OF MOUNTLAKE TERRACE By: Arlene Fisher, City Manager Date: 3 131 15 ATTEST-, VirginiaAsen, City Clerk CITY DMONDS By: — —�--- Dave E rrling, : Iayor Date: 3 Z % S ATTEST: ,6 � /�_. =� F,' APPROVED AS TO FORM: APPROVED AS TO FORM: 11 Gregor G. Schrag, City Attorney 12 Office of the City Attorney N V) O u O i -+ u D a- N c O u 4-- 0 i ro C m N i C d Ln o Ln o d m o n o c -4 O .-4 O � ci ci Ln I ci O O O rV 01 M O Zi- N LO m LD 1- m F ^ ci lD O 01 m in Ct m to -i +n Ln o Ln o �+ `m LO o o o 00 m Ln 0) O N I� m m n M o � � m C O r-i m E Ln N ci L? W On O1 O O M f- N O i f0 �, N m w w w m M m N 0 � .... O N Lfi c-1 + Ql Ct ci c-I N t4 m A4 L} L} r O� O O E 001 LQ1n m Lr m v inn v) tn i 0 u o u o O O o C 0 0 0 0 _ O O On fV O O C u o0 M N O O 7 '� N Y O N M ci rl u Q c N L4 N +n VII i/? u v 0 0 o O O o 0 0 CD 0) m O m 13) O Lrl ,..� t a O L N Y W > N N � 0 ai ro > ) U7 O c rj 7 -0 r0 L Y N �- C oO E o N i L > o -e c C 0 OC 3 U .- N C a) 3 u C ro w O M i L N a+ C > w i0CD0 u uy J�4- a) V] K O ci N M Z O V LO Ln N N 00 0 0 n M W zt Ln VII 0 ai lD 01 N ru O u c 0 O Y u c v Y E U) E °D 0 v ro OJ a o t U 41 v D Y � � N � � C Ul -00 -0 V al >, � Q V � v O d V Ylu y O E E u .- i u u W W u VI C 0 o °' u u O Z ci N m 0 Y Y 0 O U C O u J Y C 0 u 0 0 c 0 .Q 0 v L Y C .N a N Y (6 7 V m U V O Y ._ � C N M O1 cr E N N as N � v � C ro N � Y O > L u O Y rD 3 N C m CU . � � v Ol N vo`n -&_- v v ai o E '> ai o > o I- L N Ln c y M Y > a)L o W 3 3 E v > O ro v o * o J N u O ro al � Y N m N � N N Y i V Y ^ C n N C O N bD0 V1 L 1"" U O N N Y > C N O N c 3 3 O N a > L 7 Y v 0 N O O N u O _ L C O 00 O C rj O N @ u O 0 i 6 O Y — N L C C O i N Ln Exhibit "B" Schedule of Work 2-inch Grind & Overlay 228th St/Lakeview Drive Item Unit Quantity Unit Price Cost Flaggers HR 250 $0 Saw Cutting Existing Pavement LF 220 $0 HMA Cl. 1/2 In. PG 64-22 TON 910 $0 Planing Bituminous Pavement - 2 In. Sy 7300 $0 .Adjust Catch Basin EA 18 $0 Inlet Protection EA 16 $0 Erosion/Water Pollution Control EST 1 $0 Raised Pavement Marker Type 2 HUND 1 $0 .Adjust Monument Case and Cover EA 2 $0 Paint Line LF 2270 $0 Plastic Wide Lane Line LF 390 $0 Plastic Crosswalk Line SF 580 $0 Plastic Stop Line LF 30 $0 Plastic Traffic Arrow EA 4 $0 Temporary Pavement Marking LF 5400 $0 Adjust Gas Valve Box EA 3 $0 .Adjust Water Valve Box EA 20 $0 Adjust Sanitary Sewer Manhole EA 2 $0 SUBTOTAL = $0 Item Unit Quantity % of subtotal Cost Roadway Surveying LS 1 1.5% $0 Mobilization LS 1 5.0% $0 Project Temporary Traffic Control LS 1 1.5% $0 Traffic Control Supervisor LS 1 1.5% $0 Pedestrian Traffic Control LS 1 0.5% $0 OVERLAY TOTAL = $o Final 228th Estimate 2-26-15.xlsm MASTER Summary . Std_ Spec Item No. Section Schedule A - Road' 1 1-04,4SP 2 1-05ASP 3 1-05,4SP 4 1-05ASP 5 1-05.18SP 6 1-07.11SP 7 1-07.15 8 1-07.17SP 9 1-08,3SP 10 1-09.7 11 1-10SP 12 1-10SP 13 1-105P 14 1-1OSP 15 2-01SP 16 2-01SP 17 "2SP 18 2-026F 19 2-02SF 20 2-025F 21 2-02SP 22 2-02SF 23 2-025P 24 2-02SP 25 2-025P 26 2.02 27 2-W 28 2-02 29 2-OG 30 2-OS 31 2-12 32 4-04 33 4-04 34 5-04SP 35 5-04SP 36 5-04SP 37 5-04SP 38 5-04 39 5-04 40 5.04 41 6-04SF 42 6-13SP 43 6-13 44 6-135P 45 6-20SP 46 6-2051' 47 7-01 48 7-01 49 7-01 50 7.04 51 7-04 52 7-04SP 53 7-04 54 7-05 55 7-05 56 7.05 57 7.05 58 7-05 59 7-05SP 60 7-05SP 61 7-05 62 7-05SP 63 7-05SP 64 7-05SP FINAL OPINION OF COST City of Edmonds - 228th Street SW Corridor Improvements 2126/15 L--- ITEM UNITS QUANTITY UNIT PRICE AMOUNT ma Unexpected Site Clean es EST 1 $ 30,000 $ 30,000 Structure Surve In LS 1 $ 20,800 $ 20.800 Roadway Surve i LS 1 $ 49,000 $ 49.000 (Licensed Surveying EST 1 $ 5,000 $ 5.000 Record ❑ravui s Minimum Bid $7,5015 LS 1 $ 7,500 $ 7,500 Trainin HR 400 $ 5 $ 2,000 SPCC Playa LS 1 $ 2,500 $ 2,500 IPotholin EA 60 $ 500 $ 30,000 1yeA B Pmqress Schedule LS 1 $ 10,000 $ 10,000 Mobilization LS 1 $ 220,000 $ 220,000 Project Temporary Traffic Control LS 1 $ 82,400 $ 82,400 Flaggers HR 3,970 $ 50 $ 198,500 Traffic Control Supervisor LS 1 $ 80,500 $ 80,500 Off -Duty Uniformed Police Officer (Min. Bid $45.00) HR 100 $ 45 $ 4,500 Clearing and Grubbing AC 1 $ 6,000 $ 6,000 Tree Removal, 12-inch Diam. And Over EA 21 $ 500 $ 10.500 Removal of Structure and Obstruction LS 1 $ 32,000 $ 32,000 Removing Cement Cone. Sidewalk SY 800 $ 15 $ 12,000 Removing Cement Conc. Curb and Gutter LF 1,150 $ 10 $ 11,500 Removing Cement Cone. GUtteF LF 50 $ 15 $ 750 Removing Asphalt Conc. Pavement SY 1 3,400 $ 15 $ 51,000 Removing Traffic Curb LF 1,130 $ 10 $ 11,300 Removing Traffic Island SY 330 $ 50 $ 16,500 Rernovinq Existing Drainage Pipe LF 1.500 $ 10 $ 15.000 RemovIng Drainage Structure EA 16 $ 750 $ 12,000 Roadway Excavation Incl. Haul CY 50 $ 50 $ 2,500 Gravel Borrow Inc. Haul TON 7,390 $ 20 $ 147,800 Ditch Excavation Incl. Haul CY 260 $ 25 $ 6,500 Structure Excavation Class B Incl. Haul CY 1,620 $ 20 $ 32.400 Shoring or Extra Excavation Class $ SF 10,000 $ 1 $ 10,000 Construction GeolexWe for Underground Drainage SY 300 $ 5 $ 1,500 Crushed Surfacing Base Course TON 1,460 $ 30 $ 43,800 Crushed Surfacing Top_Course TON 60 $ 30 $ 1,800 Planing Bituminous Pavement -2In. SY 3,840 $ 6 $ 23,040 Planing Bituminous Pavement -4In. SY 380 $ 11 $ 4,180 Planing Bituminous Pavement- 10 In. SY 1,400 $ 14 $ 19,600 Geotextile for Pav-ing SY 4,500 $ 2 $ 9,000 HMA Cl. 1/2 In. PG 64-22 TON 3,500 $ 100 $ 350,000 HMA Cl. 1/2 In. PG 58-22 TON 30 $ 110 $ 3,300 Commercial HMA TON 40 $ 80 $ 3,200 Asphalt Cost Price Adjustment CALC 1 $ 5,955 $ 5,955 Structural Earth Wall SF 3,230 $ 35 $ 113,050 Gravel Borrow For Structural Earth Wall Incl. Haul CY 760 $ 40 $ 30,400 Concrete Top Cap For Wail LF 680 $ 25 $ 17,000 Modular Block Wall SF 620 $ 30 $ 18,600 Double Modular Block Wall SF 110 $ 60 $ 6.600 Underdrain Pipe 36 In. Diam. LF 130 $ 100 $ 13.000 Drain Pipe 8 In, Diam. LF 30 $ 25 $ 750 Gravel BackFll for Draln CY 100 $ 35 $ 3.500 Schedule A Storm Sewer Pipe 12 In. Diam LF 970 $ 45 $ 43.650 Schedule A Storm Sewer Pipe 18 In. Diem LF 470 $ 60 $ 28.200 Ductile Iron Storm Sewer Pipe 12 In. Diam. LF 370 $ 75 $ 27,750 Testing Storm Sewer Pipe LF 1,810 $ 3 $ 5.430 Catch Basin Type 1 EA 30 $ 1,300 $ 39,000 Catch Basin Type 2 48 In. Diam. EA 11 $ 3,200 $ 35.200 Catch Basin Type 2 54 fin. Diam. EA 4 $ 5,200 $ 20,800 Catch Basin Type 2 60 tin. Diam. EA 1 $ 6,000 $ 6,000 Catch Basin Type 2 60 In. Dlam. Wilh Flow Restrictor EA 1 $ 5,700 $ 5,700 Catch Basin Type 2 72 In. Diam. With Weir Wall EA 1 $ 8,000 $ 8.000 Connection to Drainage Structure EA 19 $ 900 $ 17,100 Ad'ust Catch Basin EA 13 $ 450 $ 5,850 Adjust Drainage Manhole 8 $ 600 $ 4.800 Adjust Fiber Manhole EA 4 $ 500 $ 2,000 Adjust Sanitary Sewer Manhole EA 10 $ 506 $ 5,000 X:\Edmonds, City of\Projects\20110010 - 228th Street Improvements\Design\Estimates\Final Estimate\Final 228th Estimate_2-26-15.xlsm 2/2612015 Final 228th Estimate_2-26-15.xlsm MASTER Summary 65 7-06SP 66 7-06SP 67 7-08sP 68 7-12SP 69 7-20SP 70 7-2aSP 71 7-20SP 72 7-21SP 73 8-01 74 8-01 75 8-01 76 8-01SP 77 8-01 sP 78 8.02 79 8-02sP 80 "2 81 8-02sP 82 e-04 83 8-04 84 9-055 85 a-06sP 86 E 4 87 8-07 88 S 09 89 8 09 90 8-128P 91 8-12SP 92 8-12 93 8-136P 94 8-14SP 95 8-14S 96 8-14sP 97 8-14s 98 8-185 99 8-165P 100 a-20sP 101 a -MP 102 8-205 103 B-20SP 104 B-20SP 105 8-20 106 8-21SP 107 8-21SP 108 B-2 109 8-2 110 8-22 111 8-22 112 8-22 113 8-22 114 8-22 115 9-23 116 9-26SP 117 8-27SP 118 a-28SP FINAL OPINION OF COST City of Edmonds - 228th Street SW Corridor Improvements 2/26/15 (Media Filter Catch Basin EA 1 $ 20,000 $ 20.000 Media Filter Vault EA 1 $ 50,000 $ 50,000 :Steel Casin2 24 In. Diam LF 27 $ 200 $ 5,400 Adjust Water Valve Box EA 24 $ 400 $ 9,600 (Detention Vault LS 1 $ 328.000 $ 328.000 Structure Excavation Class A Incl, Haul CY 2,720 $ 30 $ 81,600 :Shorinq or Extra Excavation Class A LS 1 $ 80,000 $ 80,000 ,Amended Soil CY 60 $ 140 $ 8,400 (Inlet Protection EA 52 $ 95 $ 4,940 Silt Fence LF 960 $ 5 $ 4,800 Stabilized Construction Entrance SY 490 $ 20 $ 9,800 (Erosion and Water Pollution Control LS 1 $ 78,500 $ 78.500 :SWPPP Preparation and Maintenance LS 1 $ 2,500 $ 2,500 (Bark or Wood Chip Mulch CY 40 $ 45 $ 1,800 'Topsoil Type A CY 90 $ 50 $ 4,500 ,Zelkova Serrata Street Tree 2 1 /2 cal.) EA 1 $ 1,500 $ 1 500 (Pro a Restoration EST 1 $ 30,000 $ 30,000 Cement Conc. Pedestrian Curb LF 60 $ 25 $ 1,500 Cement Conc. Traffic Curb and Gutter LF 2,500 $ 25 $ 62,500 Low Profile Barrier Curb LF 950 $ 35 $ 33,250 Cement Conc. Driveway Entrance SY 190 $ 75 $ 14 250 !Precast Sloped Mountable Curb LF 30 $ 30 $ 900 (Precast Dual Faced Sloped Mountable Curb LF 820 $ 30 $ 24.600 iRaised Pavement Marker T e 1 HUND 3 $ 650 $ 1,950 IRaisedPavement Marker Type 2 HUND 4 $ 650 $ 2,600 Coated Chain Link Fence Type 3 LF 220 $ 30 $ 6,600 Coated Chain Link Fence Type 42 Inch LF 300 $ 30 $ 9,000 Coated Single 6 Ft. Chain Link Gate ape 42 In. EA 1 $ 800 $ 800 Adjust Monument Case and Cover EA 4 $ 500 $ 2,000 Cement Conc.Sidewalk SY 1,000 $ 70 $ 70,000 Cement Conc. Curb Ramp Type Parallel SY 280 $ 160 $ 44,800 Cement Conc, Curb Ramp Type Perpendicular SY 30 $ 160 $ 4,800 Cement Conc. Curb Ramp Type Directional SY 20 $ 160 $ 3,200 (Mailbox Support EA 2 $ 500 $ 1,000 :Pedestrian Railina LF 160 $ 250 $ 40.000 Traffic Signal System SR99/228th LS 1 $ 310,000 $ 310.000 Traffic Signal System 228th/76th LS 1 $ 218,000 $ 218.000 Traffic Signal Interconnect System Complete LS 1 $ 28,000 $ 28,000 Illumination System Complete - South LS 1 $ 25,000 $ 25,000 (Relocate Private Light EA 1 $ 300 $ 300 Directional Boring LF 750 $ 75 $ 56,250 (Permanent Si nin LS 1 $ 14.400 $ 14,400 (Radar Feedback Sin EA 1 $ 5,000 $ 5,000 (Paint Line LF 5,09D $ 1 $ 5,090 (Plastic Wide Lane Line LF 4,810 $ 4 $ 19,240 !Plastic Crosswalk Line SF 1,650 $ 7 $ 11,550 (Plastic StopLine LF 330 $ 10 $ 3,300 (Plastic Traffic Arrow EA 25 $ 150 $ 3.750 (Plastic Traffic Letter EA 16 $ 100 $ 1.600 Plastic Bic cle Lane Symbol EA 18 $ 150 $ 2,700 'Temporary Pavement Marking IF 19,800 $ 1 $ 19,800 Stamped Concrete SY 300 $ 120 $ 36,000 ,Adjust Gas Valve Box EA 5 $ 300 $ 1.500 Wood Board Fence LF 30 $ 40 $ 1.200 SCH. A SUBTOTAL $ 3,850 975 X:\Edmonds, City of\Projects\20110010 - 228th Street Improvements\Design\Estimates\Final Estimate\Final 228th Estimate 2-26-15-Asm 2/26/2015 Final 228th Estimate_2-26-15.xlsm MASTER Summary Schedule B - Watei 1 1-04ASP 2 1-05.4SP 3 1-05.18SP 4 1-07.17SP 5 1-09.7 6 1-10sP 7 1-1 oSP 8 1-105P 9 2-028P 10 5-04 11 7-09SP 12 7-09SP 13 7-09SP 14 7-09SP 15 7-095P 16 .7-09SP 17 7-09SP 18 7-09SP 19 7-09SP 20 7-09SP 21 7-158F 22 7-15SP 23 8-01SP 24 8-02SP Schedule C -Sanit 1 1-04.45P 2 1-45.4SP 3 1-05.18SP 4 1-07.17$P 5 1-09.7 6 1-105P 7 1-1oSP 8 1-10SP 9 2-03 10 2-09 11 2-09 12 .5-04 13 7-05 14 7-05 15 7-05SP 16 7-08SP 17 7-17 18 7-17 19 7-17SP 20 7-17SP 21 7-17SP 22 7-17SP 23 7-1'9SP 24 8-01SP 25 "2SP FINAL OPINION OF COST City of Edmonds - 228th Street SW Corridor Improvements 2/26/15 System IJnex ected Site Changes EST 1 $ 10.000 $ 10,000 Roadway Surveying IS 1 $ 900 $ 900 Record Drawings (Minimum Bid $2,000) LS 1 $ 2.000 $ 2.000 Potholin EA 5 $ 500 $ 2.500 Mobilization LS 1 $ 3,000 $ 3,000 Praeqt_Tqmpxrary Traffic Control LS 1 $ 1,100 $ 1,100 Fla. ers HR 120 $ 50 $ 6,000 Traffic Control Supervisor LS 1 $ 3.000 $ 3,000 Removing Asphalt Conc. Pavement SY 100 S 15 S 1,500 Commercial HMA TON 20 $ 80 $ 1,600 Temway Jump Connecfion EA 6 $ 2,000 $ 12,000 Tapping Sleeve and Valve Assembly 12 In. x 6 In. EA 1 $ 4,000 $ 4.000 (3-In. 45' Bend EA 1 $ 250 $ 250 6-In, 11,25' Bend EA 1 $ 250 $ 250 13" Cap or Plug EA 2 $ 256 $ 500 Ductile Imn PipO for Water Main 6 In. Diam. LF 45 $ 70 $ 3,150 Bank Run Gravel for Trench Backfill LF 45 $ 5 $ 225 Split Wedge Activated Restraint Harness EA 4 $ 1,250 $ 5,000 Remove Existing Water Main Pipe LS 1 $ 2,000 $ 2,000 Ternprnry Water Maln Support LS 1 $ 3,000 $ 3,000 Service Connection 1 In. Diam. EA 2 $ 1,400 $ 2,800 Service Connection 2In. Diam. EA 1 $ 2,000 $ 2,000 Erosion and Water Pollution Control LS 1 $ 1,100 $ 1,100 Property Restoration EST 1 $ 2,000 $ 2,000 'WSST @ 9.5% $ 6,448 SCH. B SUBTOTAL $ 76,323 ary Sewer tem Unexpected Site Changes EST 1 $ 10,000 $ 10,000 Roadway Surveying LS 1 $ 2,700 $ 2,700 .Record Drawings Minimum Bid $2,000 LS 1 $ 2,000 $ 2,000 Potholing EA 5 $ 500 $ 2,500 (Mobilization LS 1 $ 10.000 $ 10,000 Project Temporary Traffic Control LS 1 $ 3,300 $ 3,300 iFlaggers HR 160 $ 50 $ 8000 Traffic Control Supervisor LS 1 $ 3,000 $ 3,000 ,Gravel Borrow Incl. Haul TON 510 $ 20 $ 10,200 Structure Excavation Class B Incl. Haul CY 580 $ 20 $ 11,600 Shoring or Extra Excavation Class B SF 4,480 $ 1 $ 4,480 Commercial HMA TON 10 $ 80 $ 800 IManhole 48 In. Diam Type 1 EA 4 $ 5,000 $ 20,000 Manhole Additional Height 48 In. Diam. Type 1 LF 13 $ 600 $ 7,800 lDrop Manhole Connection EA 1 $ 1,000 $ 1,000 Steel Casing 12 In, Diam LF 12 $ 100 $ 1,200 IPVC Sanitary Sewer Pipe 8 In. Diam. LF 360 $ 110 $ 39,600 Testing Sewer Pie LF 360 $ 3 $ 1.080 :Sewage Diversion LS 1 $ 20,000 $ 20,000 Connections to Sanitary Sewer Manhole EA 4 $ 900 $ 3,600 Removing Existing Sanitary Sewer Pie LF 340 $ 10 $ 3.400 Removing Sanitary Sewer Manhole EA 2 $ 750 $ 1,500 Sewer Service EA 1 $ 1,000 $ 1,000 Erosion and Water Pollution Control LS 1 $ 3,300 $ 3,300 (Property Restoration EST 1 $ 2.000 $ 2,000 WSST @ 9.5% $ 16,346 SCH. C SUBTOTAL I $ 190,40611 X:\Edmonds, City of\Projects\20110010 - 228th Street linprovements\Design\Estimates\Final Estimate\Final 228th Estimate 2-26-15,xlsin 2/26/2015 Final 228th Estimate 2-26-15.xlsm MASTER Summary . Schedule D - Moun 1 1-04ASP 2 1-66.4$P 3 1-08,3SP 4 1-09.7 5 1-1asp 6 1-10SP 7 1-105P 8 2-02SP 9 2-02SP 10 4-04 11 5,04SP 12 5-04 13 5-04$P 14 7-0 15 7-05SP 16 7.45SP 17 7-12SP 18 8-01 19 8-01 SP 20 8-01 SP 21 8-02SP 22 e-04 23 8 0 24 8-13SP 25 8-14 26 8-145 27 8-145 28 8.2 29 8-2 30 8-2 31 8-2 32 8- 33 8-2 34 8.2 35 B-2 36 8-275 Schedule E - Admii 1-03.4SP Schedule F - SR99 1 1-04ASP 2 1-07SP 3 1-05,1 sS P 4 1-09 5 1-10SP 6 2.02SP 7 2-025P 8 8-01 9 8-14 10 0-208P 11 8-208P 12 0-20SP FINAL OPINION OF COST 5 9 P P 0 2 2Plastic 2Plastic 2� 2 2 3 P Cityof Edmonds - 228th Street SW Corridor Improvements 2126/15 take Terrace 'Unexpected Site Changes EST 1 S 10,000 $ 10,000 RoadwaySurveying LS 1 $ 8,800 $ 8.800 'Type B Progress Schedule LS 1 $ - $ (Mobilization LS 1 $ 31,000 $ 31,000 TemporaryiPro'ectTraffic Control LS 1 S 11,000 $ 11,000 Fla ers HR 530 $ 50 $ 26,500 Traffic Control Supervisor LS 1 $ 10,000 $ 10,000 RemovingCement Conc. Sidewalk SY 90 $ 15 $ 1,350 RemovingCement Conc. Curb and Gutter LF 140 $ 10 $ 1,400 ,Crushed SurfacingBase Course TON 1,380 $ 30 $ 41,400 PlaningBituminous Pavement - 10 In, SY 6,600 $ 14 $ 92.400 HMA Cl. 1/2 In. PG 64-22 TON 2 250 S 100 $ 225,000 Asphalt Cost Price Adjustment CALC 1 $ 3,796 $ 3,796 Adjust Catch Basin EA 10 $ 450 $ 4.500 .Adjust Drainage Manhole EA 11 $ GOD $ 6,600 Adjust SanitarySewer Manhole EA 4 $ 500 $ 2.000 Adjust Water VaIva Box EA 19 $ 400 $ 7,600 Inlet Protection EA 12 $ 95 $ 1,140 Erosion and Water Pollution Control LS 1 $ 11,000 $ 11,000 SWPPP Preparation and Maintenance LS 1 $ 750 $ 750 Property Restoration EST 1 $ 5.000 $ 5,000 Cement Conc. Traffic Curb and Gutter LF 170 $ 25 $ 4,250 Raised Pavement Marker T e2 HUND 2 $ 650 $ 1,300 Adjust Monument Case and Cover EAJ2,550 $ 500 $ 1.000 CemenIConc,Sidewalk SY $ 70 $ 2,100 t ement Conc. Curb Ram Type Parallel SY $ 160 $ 6,400 Cement Conc. Curb Ram Type Single Direction SY $ 160 $ 4,800 Conduit Pipe 2 In. Diam. LF $ 10 $ 10,000 Paint Line LF $ 1 $ 2,550 Wide Lane Line LF $ 4 $ 2,280 Crosswalk Line SF S 7 $ 4,060 Plastic StopLine LF 30 $ 10 $ 300 Plastic Traffic Arrow EA 4 $ 150 $ 600 Plastic Bicycle Lane Symbol EA 2 $ 150 $ 300 Temporary Pavement Markin IF 6,300 $ 1 $ 6,300 Adjust Gas Valve Box EA 3 $ 300 $ 900 ;SCH. D SUBTOTAL $ 548 376 listration Non -Federal Participating Contract Bond Extension IS 1 $ 20,000 $ 20.000 SCH. E SUBTOTAL I $ 20,000 Illumination Unexpected Site Changes EST 1 $ 10,000 $ 10,000 SPCC Plan LS 1 $ 1,000 $ 1,000 Record Drawings Minimum Bid $2,000) LS 1 $ 2,000 $ 2,000 Mobilization LS 1 $ 25,000 $ 25.000 Project Tem ora Traffic Control LS 1 $ 19.000 $ 19,000 Off -Duty Uniformed Police Officer Min. Bid $45.00 HR 40 $ 45 $ 1,800 Removing Cement ConcreteSidswalk SY 200 $ 30 $ 6,000 Inlet Protection EA 20 $ 80 $ 1.600 Cement Conc. Sid"alk SY 200 $ 40 $ 8.000 Potholing Luminaire Foundation Locations EA 19 $ 1,500 $ 28,500 Illumination System, Complete - North LS 1 $ 349,000 $ 349.000 Repair of Existing Damaged Conduits LS 1 $ 10,000 $ 10,000 SCH. F SUBTOTAL 1 $ 461,900 SCH. A - SCH. F SUBTOTAL $ 5,147,980 X:\Edinonds, City or'\Projects\20110010 - 228th Street linproveinents\Design\Estimates\Final Estimate\Final 228th Estimate_2-26-15,xlsin 2/26/2015 Final 228th Estimate_2-26-15.xlsm MASTER Summary FINAL OPINION OF COST City of Edmonds - 228th Street SW Corridor Improvements 2/26/15 Bid Altemate 1 Schedule H - 76th Ave W Overlay 1 1-[14.4SP JUnexpected Site Changes EST 1 1 $ 5,000 $ 5,000 1 1-05ASP Roadway Survey! LS 1 $ 500 $ 500 2 1-09.7 Mobilization LS 1 $ 4,000 $ 4.000 3 1-10SP PmaectTem ra TraffiaControt LS 1 $ 1,400 $ 1,400 4 1-10SP Fla gars HR 100 $ 50 $ 5 000 5 1-10SP Traffic Control Su rvisor LS 1 $ 1,200 $ 1,200 6 5414SP Geotextile for Paving SY 2,500 $ 2 $ 5,000 7 5-04 HMA CI. V2 in. PG 64-22 TON 280 $ 100 $ 28,000 8 5-04SP Planing Bituminous Pavement- 2 In. SY 2.320 $ 6 $ 13,920 9 5-04SP Asphalt Cost Price Adjustment CALC 1 $ 472 $ 472 10 7-05 Adjust Catch Basin EA 5 $ 450 $ 2,250 11 7-05SP Adi ust trains a Manhole EA 3 $ 600 $ 1,800 12 7-12SP Adjust Water Valve Box EA 7 $ 400 $ 2,800 13 8-01 Inlet Protection EA 7 $ 95 $ 665 14 8-01SP Erosion and Water Pollution Control LS 1 $ 1,400 $ 1,400 15 8-028P Pro a Restoration EST 1 $ 2.000 $ 2.000 15 8-27SP Adjust Gas Valve Sox EA 1 $ 300 $ 300 SCH. H SUBTOTAL $ 75,707 Bid Alternate 2 Schedule I - 228th St SW Overlay i 1-04ASP Unexpected Site Chan as EST 1 $ 5,000 $ 5,000 1 1-05.4SP Roadway Surveying L$ 1 $ 500 $ 500 2 '1-09.7 Mobilization LS 1 $ 2.000 $ 2,000 3 1-10SP Pr9ject Ternpors ry Traffic Control LS 1 $ 700 $ 700 4 1-108P Flaggers HR 80 $ 50 $ 4,000 5 1-10SP Traffic Control Supervisor LS 1 $ 1,000 $ 1,000 6 5-04 HMA CI. 112 In. PG e4-22 TON 140 $ 100 $ 14,000 7 5-04SP Geotextile for PavingSY 1,100 $ 2 $ 2,200 8 5414SP Planing Bituminous Pavement -2lin. SY 1,010 $ 6 $ 6,060 9 5-04SP no Bitun0ousPavement -4In. SY 80 $ 11 $ 880 10 5-04SP AS halt Cost Price Adjustment CALC 1 $ 236 $ 236 11 7-05 Adjust Catch Basin EA 2 $ 450 $ 900 12 7-12SP Adjust Water Valve Box EA 3 $ 400 $ 1,200 13 8-01 Inlet Protection EA 1 3 $ 95 $ 285 14 8-01 SP Erosion and Water Pollution Control LS 1 $ 700 $ 700 15 8-02SP Pro a Restoration EST 1 $ 2,000 $ 2,000 SCH. I SUBTOTAL $ 41,661 11 Bid Alternate 3 Schedule G - Decorative Median Treatment 1 8-26SP (Decorative Median Treatment LF 295 $ 400 $ 118,000 2 8-26SP (Median Art Element LF 130 $ 300 $ 39,000 SCH. G SUBTOTAL $ 157,000 SCH. A - SCH. I SUBTOTAL $ 5,422,348 Inflation Adjustment (3%) $ 162.700 Clty PM/Admin 314 $ 162,700 Construction Man a ament (15%) $ 813,400 Management Reserve 10%) $, 542,300 OPINION OF COST - TOTAL $ 7,103,448 X:\Edmonds, City of\Projects\20110010 - 228th Street Improveinents\Design\Estimates\Final Estimate\Final 228th Estimate 2-26-15,xlsm 2/2612015 (f) �s z R pg o p 3> o ac=- �u w SOAd 133 °u HsoIHOIV:'1 oo oz y•ris D O CD OO 000 6006 ODO 00000 00000 � r l r� n �e Iyzbi o 3 0 4 iax `:E n c p o _ poQ h• i Y' SS I EI Sc2 o 1-`3�`z_ 5� 3a5O�3 lls CE ` IS A TA, l °> al -i I t �P,Vd 13aHS Ol 1 c 00:-5 L V •d! S rl A 7o"i"rl AV8 T 1A s k71 5 wl �H uu x < g 5< xu wH u so;,d �aaHso� Howr� oo+sz v v IMP'll I'll ' ZZ , � l ice• + If CY LO Is > O'__ � U u- 3 c3 o - _ _ _ L✓ i �, - 2 OU�°z u3 uu �a < < « u < °uu 3 o zo 'o 0 o rvU. ¢ _ L O G G oG GOO' GOOD OOO 00000 OOOOO r (-o I p ry, �I u _ I in r7 -n ;e� - 03 o=o�z o5's W 3 V 3zz�q n q OGO 'O rvn J �1 i ;O 00 r 5 3 3a g J `x3 9Q1d 133H5 Dl iVJ�.V[4 � I �{ 00 U VIV S , CD N ■ o Q r z i 3 Sz R gQS"�u m 2 z w > o cn F H _ N o3:2 �g ��� w o -� - Ouc o �j$ZF t g�3Q oy C OzOZU n`oa- QCC7 ,Bo BS_ F �L ?LL�•`aa•,� _� c o i xx _ < cl z3 � O Q C 2 CA O°z O 0 0 0 00 000 0000 000~ 00000 00000 000 0 0 m W N C. 00' SZ V 'VIS 1 •f Z �� 00 � C ^ 5 p — U c p =IM w� �m �0 5� �� _ y"• o - wwn��JjJ 3y a zoz G-F3Q�' u6 �5 c os F l= J'txFo �c S uS u� o z - a i p� FS x z rcw >o of e r w6 Qo p �� 06 a � � 8 a Ro I o 5 I I o V �c 0 0 00 000 _, DODO 000 00000 _ L I' �G - ci 00 > > i { O ni� m CO z u w u Q o C � � G s e J c Z CO N f r m N W 6 I� (HS005 V'di+0 6? CD 0 CO G) C�1 r� V m MICE V'd I S I .I s= c Igi� $ $ co w r o U` ti p5 Rg Fu 0 3 U - oc ry6ow s p s O O 00 000 0000 000 00000 OOOGG m N S' �SYS F 5 hE _ i } zuN_ -�3 ouzio Qd po 3 w "uoz3� u3� e�3F �z�oz ouF roo W 3 3 �� - w 3°z pQ� oirw usgr 00000 `"m` io 00 's k JV x 3a n is 43 co r V 3 z �F!3 gig <a K 3 fn J a o z a ffi s O Oz zz o� O o Q p -u,d 3F3 LY c z< 0 v J 3u- mox _ L✓ FF �}y C,5 o C <a z A+a "t O g F— .� Z NLLcU W zr O W co o m o� zo _? u0 U) l -- m K V<� c� W 3 C p N H c� P. 3LL� �.2 Jy c (7 _%_ w w u �o <o hn tn C Qp W u _� u u j2 _ f <6 O 1, Ian LL 88 U= Cl)r '1 Fr rp� ' y� � � - •' Y � 7a �' y , � a y�g ro 4� f�rar.Yi NY[uue�.-�-. roaa ii,.a�m•w,nr.. v�..�cv•_.. ..... .�...