Loading...
Building Permit 2020'S IDENTIAL BLDG Permit PERMIT NU of Edmonds EdmondsCity 121 5th Ave N, 98020 1 1 . wwm www.edmondswa.gov Type: RESIDENTIAL BLDG Owner/ Business: ROBERT PURSER Status: ISSUED Subtype: NEW SINGLE FAMILY Parcel No: 00390000001100 Site Address: 14317TH PL S lotl EDMONDS,WA 98020-5173 Applied: 10/25/2020 Subdivision: 003900 Lot: 0 Issued: 2/11/2021 Fire Sprinklers: Yes Lot Area: 6,794 Zoning: RS-6 Final: Valuation: $398,463.16 Occupancy Type: R-3 Construction Type: VB Expiration Date: 2/6/2022 Code Edition: 2015 No. Stories: 2 # of Dwelling Units: 1 Issued by: NED Scope of Work: PURSER- NEW SFR P&M INCL OVWSD credits went to lot 2 WA State Contractor L & I #: City of Edmonds Business License #: 602454996-001-0001 CONTACTS.Ida j NAME TYPE NAME ADDRESS T PHONE EMAIL APPLICANT ROBERT PURSER 520 3RD AVE N, EDMONDS WA (425)531-0923 ROB.PURSER@GMAIL.COM 98020 CONTACT ROBERT PURSER 520 3RD AVE N, EDMONDS WA (425)531-0923 rob.purser@gmail.com 98020 CONTRACTOR PURSER DEVELOPMENT 520 3RD AVE N, EDMONDS WA (425)531-0923 rob.purser@gmail.com SERVSLLC 98020 OWNER PURSER DEVELOPMENT 520 3RD AVE N, EDMONDS WA (425)531-0923 rob.purser@gmail.com SERVSLLC 1 98020 INFORMATION DESCRIPTION ACCOUNT AMOUNT PAID PAID DATE RECEIPT # 1 - BASE FEE FOR MECHANICAL 001.000.322.10.000.00 $50.00 $50.00 2/11/21 R10485 PERMITS 1 - BASE FEE FOR PLUMBING 001.000.322.10.000.00 $50.00 $50.00 2/11/21 R10485 PERMITS 2019 TRANSPORTATION IMPACT 112.502.345.86.000.00 $6,249.14 $6,249.14 2/11/21 R10485 FEE AIR CONITIONING SYSTEM OR HEAT 001.000.322.10.000.00 $50.00 $50.00 2/11/21 R10485 PUMP - 1.75 BTU OR LESS APPLIANCE VENTS 001.000.322.10.000.00 $30.00 $30.00 2/11/21 R10485 BACKFLOW - OVER 2 INCH 001.000.322.10.000.00 $45.00 $45.00 2/11/21 R10485 CITY TECHNOLOGY FEE CHARGED 001.000.321.99.100.00 $40.00 $40.00 2/11/21 R10485 PER PERMIT EACH PLUMBING FIXTURE ON ONE 001.000.322.10.000.00 $240.00 $240.00 2/11/21 R10485 TRAP ENGINEERING INSPECTION FEE 001.000.341.82.000.00 $440.00 $440.00 2/11/21 R10485 FAN CONNECTED TO SINGLE DUCT 001.000.322.10.000.00 $60.00 $60.00 2/11/21 R10485 FURNACE OR FIREPLACE 001.000.322.10.000.00 $60.00 $60.00 2/11/21 R10485 GAS PIPING - NEW OR LOCATED 001.000.322.10.000.00 $30.00 $30.00 2/11/21 R10485 PARK IMPACT - ADMIN FEE RES 001.000.322.10.000.00 $50.00 $50.00 2/11/21 R10485 PARK IMPACT FEE - SINGLE FAMILY 332.100.345.85.000.00 $2,734.05 $2,734.05 2/11/21 R10485 PERMIT FEE - RESIDENTIAL 001.000.322.10.000.00 $2,894.00 $2,894.00 2/11/21 R10485 Printed: Thursday, February 11, 2021 2:38:22 PM 1 of 4 DESCRIPTION ACCOUNT AMOUNT PAID PAID DATE RECEIPT # PLAN REVIEW FEE - RESIDENTIAL 001.000.345.83.000.00 $2,459.90 $2,459.90 10/28/20 R8349 RESIDENTIAL STATE SURCHARGE 001.000.237.150 $6.50 $6.50 2/11/21 R10485 STORMWATER ENGINEER REVIEW 001.000.341.82.000.00 $130.00 $130.00 2/11/21 R10485 FEE STORMWATER GENERAL FACILITY 422.000.379.00.000.00 $799.00 $799.00 2/11/21 R10485 CHARGE SFR UNDER 5000 WATER HEATER - TANKLESS 001.000.322.10.000.00 $15.00 $15.00 2/11/21 R10485 TOTALS: $16,432.59 $16,432.59 CONDITIONS CONDITION TYPE STATUS NOTES 48 HRS NOTICE-ENGR FINAL O 48 Working hours notice is required when requesting your FINAL engineering inspection. ORMATION 1- HOLD HARMLESS - Applicant on behalf of his or her spouse heirs assigns and successors in interests, agrees to indemnify defend and hold harmless the City of Edmonds, Washington, its officials, employees, and agents from any and all claims for damages of whatever nature, arising directly or indirectly from the issuance of this permit. Issuance of this permit shall not be deemed to modify, waive or reduce any requirements of any City ordinance nor limit in any way the City's ability to enforce any ordinance provision. 2 - PERMIT DISCLOSURE - Any request for alternate design, modification, variance or other administrative deviation from adopted codes ordinances or policies must be specifically requested in writing and be called out and identified. Processing fees for such requests FOR shall be established by Council and shall be paid upon submittal and are nonrefundable. ALL BUILDING PERMITS INFORMATION 3- SOUND OR NOISE - Sound/Noise originating from temporary construction sites as a result of construction activity are exempt from the noise limits of ECC Chapter 5.30 only during the hours of 7:00am to 6:00pm on weekdays and 10:00am to 6:00pm on Saturdays, excluding Sundays and Federal Holidays. At all other times the noise originating from construction sites/activities must comply with the noise limits of Chapter 5.30, unless a variance has been granted pursuant to ECC 5.30.120. 4 - OCCUPANCY - Final approval on a project or final occupancy approval must be granted by the Building Official prior to use or occupancy of the building or structure. Check the job card for all required City inspections including final project approval and final occupancy inspections. FOR CARBON MONOXIDE SYSTEMS CARBON MONOXIDE SYSTEMS NFORMATION It is the owner's responsibility to repair/replace all damage of utilities or frontage DAMAGE TO FRONTAGE FOR improvements in City right of Ways or Easements to City Standards caused by or IMPROVEMENTS INFORMATION occurring during the permitted project. ELECTRICAL PERMIT FOR Obtain Electrical Permit from State Department of Labor and Industries 425-290-1309. NFORMATION FIRE FINAL INSPECTION FOR Request final Fire Department Inspection 425-775-7720. NFORMATION GAS PIPE TEST FOR Gas pipe test must be observed by City Building Inspector, affidavits shall not be accepted NFORMATION Applicant, on behalf of his or her spouse, heirs, assigns, and successors in interests, agrees to indemnify defend and hold harmless the City of Edmonds, Washington, its FOR officials, employees, and agents from any and all claims for damages of whatever nature, HOLD HARMLESS INFORMATION arising directly or indirectly from the issuance for this permit. Issuance of this permit shall not be deemed to modify, waive or reduce any requirements of any City ordinance nor limit in any way the City's ability to enforce any ordinance provision. Printed: Thursday, February 11, 2021 2:38:22 PM 2 of 4 SIDENTIAL BLDG PermitCity PERMITNU • • • • F 98020 1 1 . www.edmondswa.gov HOSE BIBBS FOR Hose Bibbs are required to have a permanently affixed anti -siphon device installed. NFORMATION INSP PRIOR TO BACKFILL FOR Call for all required inspections. All work shall be inspected prior to backfill. NFORMATION LOT LINES STAKED FOR Lot line stakes must be in place at the time of foundation setback inspection. NFORMATION Installation, use and maintenance of equipment and components shall be per MANUFACTURER SPECS FOR manufacturers specifications, installation instructions, and applicable state codes. INFORMATION Provide manufactures installation instructions on site for Building Inspector. Maximum Height 25 feet. The agent or contractor shall set up the equipment; establish the datum point and the point of average grade. Call for inspections to verify. These MAXIMUM HEIGHT FOR items must be consistent with the approved plan. If the proposed height of a building is INFORMATION within 12 inches of the maximum height permitted for the zone an elevation survey is required. OVWSD WATER LINE/METER FOR This property falls within the Olympic View Water and Sewer District. Contact Olympic INFORMATION View for specific water line and/or water meter information. New and existing buildings shall have approved address numbers, building numbers or approved building identification placed in a position that is plainly visible from the street POST ADDRESS FOR or road fronting the property. Address numbers shall be Arabic numerals or alphabet INFORMATION letters Numbers shall be legible from the public way, at least 4 inches high with a half inch min stroke width on a contrasting background. FOR Electronic civil asbuilt shall be submitted to the City prior to final project acceptance. PROJECT CIVIL ASBUILT INFORMATION Asbuilt shall be submitted to Engineeringpermits@edmondswa.gov. FOR Pursuant to UPC 608 a pressure regulator valve (PRV) shall be installed near the water PRV REQUIRED INFORMATION shutoff. SEWER 10' SEPARATION FOR INFORMATION FOR Heat pumps, AC units and similar equipment greater than 36 inches in height are not SIDE YARD EQUIPMENT INFORMATION allowed within required building setbacks. Sound/Noise originating from temporary construction sites as a result of construction activity are exempt from the noise limits of ECC Chapter 5.30 only during the hours of FOR 7:00am to 6:00pm on weekdays and 10:00am and 6:00pm on Saturdays, excluding SOUND OR NOISE INFORMATION Sundays and Federal Holidays. At all other times the noise originating from construction sites/activities must comply with the noise limits of Chapter 5.30, unless a variance has been granted pursuant to ECC 5.30.120. FOR All new, extended, rebuilt, or relocated electrical utility and/or service shall be placed UNDERGROUND WIRING INFORMATION underground. FOR All utilities shall be located prior to any excavation. New locates shall be called for if at UTILITY LOCATES INFORMATION time of excavation, original locates are no longer identifiable. City approved plastic piping may be used in water service piping provided that where FOR metal water service piping is used for electrical grounding purposes, replacement piping WATER SERVICE PIPING INFORMATION shall be of like materials (UPC 604.8) a state electrical permit and inspection is required if electrical grounding is altered or removed. Installer shall provide the manufacturer installation, operating instructions, and a whole WHOLE HOUSE FAN FOR house ventilation system operation description. A label shall be affixed to the whole INFORMATION house timer control that reads "Whole house ventilation, see operating instructions". • -. • 111 •I IM • C • •'- • F77 COMPLETED IRE ION TYPE INSPECTOR ES DATE -PRECON B-1 SETBACKS Printed: Thursday, February 11, 2021 2:38:22 PM 3 of 4 'SIDENTIAL BLDG Permit City of • • • PERMITNU -•:� i 1 1 . wm . •. 11177 1:JdhL OiL B-2 FOOTINGS B-2 FOUNDATION WALL B-3 EXT WALL SHEATHING B-3 GAS PIPING TEST B-3 MECH ROUGH IN B-3 PLUMB ROUGH IN B-3 ROOF SHEATHING B-3 UNDERFLR FRAMING B-3 WATER SERVICE LINE B-4 DRYWALL FASTENING B-4 FRAMING B-4 HEIGHT VERIFICATION B-4 SHOWER PAN B-5 INSULATION ENERGY B-7 BUILDING OTHER INSP X-3 BUILDING FINAL" A-1 TESC AND MOBILIZE E-3 STRM FOOTING DRAIN E-3 STRM TIGHTLINE E-4 WATER SERVICE LINE E-5 DRIVEWAY SLOPE E-9 COMPOST AMEND E-9 PROJECT ASBUILTS X-2 ENGINEERING FINAL E-4 STRM STUB CONNECT Printed: Thursday, February 11, 2021 2:38:22 PM 4 of 4