Loading...
Building PermitPermit PERMIT NUM of Edmonds EdmondsCity 9801 1 1 • www.edmondswa.govam.. Type: SOLAR Owner/ Business: NEIL GOWLER Status: ISSUED Subtype: SOLAR RESIDENTIAL Parcel No: 00602200101000 Site Address: 1227 CORONADO PL S EDMONDS,WA 98020 Applied: 4/8/2021 Subdivision: 006022 Lot: 0 Issued: 4/8/2021 Fire Sprinklers: Lot Area: Zoning: Final: Valuation: $0.00 Occupancy Type: Construction Type: Expiration Date: 10/5/2021 Code Edition: 0 No. Stories: 0 # of Dwelling Units: 0 Issued by: NED Scope of Work: SOLAR-PV SYSTEM ROOFTOP- SUPPORTING EV CAR CHARGE PLUG WA State Contractor L & I #: SOLTEGL831BZ City of Edmonds Business License #: 602454996-001-0001 CONTACTS NAME TYPE NAME ADDRESS PHONE EMAIL APPLICANT NEIL GOWLER 2910 1ST AVE S #201, SEATTLE (800)865-9005 SOLARADMIN@SOLTERRA.COM WA 98134 CONTACT SOLTERRA GLOBAL LLC 2910 1ST AVE S #201, SEATTLE (800)865-9005 solaradmin@solterra.com WA 98134 CONTRACTOR SOLTERRA GLOBAL LLC 2910 1ST AVE S #201, SEATTLE (800)865-9005 solaradmin@solterra.com WA 98134 OWNER RICHARD D HARRAH 1227 CORONADO PL, EDMONDS (206)898-3272 WA 98020 •' •Jwpr DESCRIPTION ACCOUNT AMOUNT PAID PAID DATE RECEIPT # CITY TECHNOLOGY FEE CHARGED 001.000.321.99.100.00 $40.00 $0.00 PER PERMIT RESIDENTIAL STATE SURCHARGE 001.000.237.150 $6.50 $0.00 SOLAR - SUB RES BLDG PERMIT FEE 001.000.322.10.000.00 $60.00 $0.00 SOLAR - SUB RES FIRE INSP FEE 001.000.342.40.000.00 $60.00 $0.00 TOTALS: $166.50 $0.00 CONDITION TYPE STATUS NOTES Printed: Thursday, April 08, 2021 4:13:37 PM 1 of 2 10LAR Permit PERMIT NUM of Edmonds EdmondsCity ••01 1 1 • www.edmondswa.gov/425.77 • 1- HOLD HARMLESS - Applicant on behalf of his or her spouse heirs assigns and successors in interests, agrees to indemnify defend and hold harmless the City of Edmonds, Washington, its officials, employees, and agents from any and all claims for damages of whatever nature, arising directly or indirectly from the issuance of this permit. Issuance of this permit shall not be deemed to modify, waive or reduce any requirements of any City ordinance nor limit in any way the City's ability to enforce any ordinance provision. 2 - PERMIT DISCLOSURE - Any request for alternate design, modification, variance or other administrative deviation from adopted codes ordinances or policies must be specifically requested in writing and be called out and identified. Processing fees for such requests shall be established by Council and shall be paid upon submittal and are nonrefundable. 3- SOUND OR NOISE - Sound/Noise originating from temporary construction sites as a ALL BUILDING PERMITS FOR result of construction activity are exempt from the noise limits of ECC Chapter 5.30 only INFORMATION during the hours of 7:00am to 6:00pm on weekdays and 10:00am to 6:00pm on Saturdays, excluding Sundays and Federal Holidays. At all other times the noise originating from construction sites/activities must comply with the noise limits of Chapter 5.30, unless a variance has been granted pursuant to ECC 5.30.120. 4 - OCCUPANCY - Final approval on a project or final occupancy approval must be granted by the Building Official prior to use or occupancy of the building or structure. Check the job card for all required City inspections including final project approval and final occupancy inspections. 5 - PLUMBING - Plumbing contractor license laws are regulated by Chapter 18.106 RCW. Property owners who hire an unlicensed plumber may assume the risks and potential monetary liability for work performed by unlicensed plumbing contractors. For more information contact L&I Department of Licensing at 1-800-647-0982. ELECTRICAL PERMIT FOR Obtain Electrical Permit from State Department of Labor and Industries 425-290-1309. NFORMATION ' • -. • WA -91 Ogg.", COMPLETED RESULT SEQID INSPECTION TYPE I INSPECTOR DATE X-1 FIRE FINAL X-3 BUILDING FINAL" Printed: Thursday, April 08, 2021 4:13:37 PM 2 of 2