Loading...
BLD2021-0509_Site_Plan_4.8.2021_3.01.38_PM_2135749Wire Conductor Neutral Ground Raceway Raceway Raceway Height Above Output 125% of Output Min. Wire De -Rate Calculation Dist. Voltage Voltage Conduit Wire Ambient # of Final Tag Qty. Size & Type Qty. Size & Type Qty., Size & Type Size & Type Location Roof Current Current OCPD Rating I Temp Cond. Ampacity (Ft) Drop % Fill % AC.1 (4) #10 AWG THWN-2 (1) #10 AWG THWN-2 3/4" EMT Conduit Above Roof 1"To 3-1/2" 13A 16.3A 20A 35A X 1 X 0.8 = 28A 20 Ft. 240V 0.27% 19.8% AC.2 (2) #8 AWG THWN-2 (1) #8 AWG THWN-2 (1) #8 AWG THWN-2 3/4" EMT Conduit Exterior Wall "N/A" 27.5A 34.4A 35A 50A X 1 X 1 = 50A 5 Ft. 240V 0.09% 27.5% PV Module 1 Micro-Inverterl Enphase Combiner Box 1 AC Disconnect #1 Main Service Panel 1 (19) Solaria (19) Enphase Existing or New: (N) "PV Dedicated" 60A Utility AC Disconnect #1, Existing 200A MSP, Top -Fed PowerXT 40OR-PM BLK IQ7A-72-2-US (240V) Rating: 80A ECB, Main -Lug Only 2 Pole, Knife -Blade Type, 10, 3W, 120/240V Power at STC: 40OW Max V-oc Input: 58V Monitoring Breaker 1 (N) 10A, 2 Pole 240V, Lockable, Visible, Rated Utility: Snohomish PUD Power at PTC: 369.99W Max Output Current: 1.45A (Each) PV Breaker 1 (N) 20A, 2 Pole NEMA 3R Interconnection: PV Breaker V-oc: 51.1V V-mp: 42.4V Max Number Per Branch: 11 PV Breaker 2 (N) 20A, 2 Pole Main Breaker De-Rated:No I-sc:9.82A 1-mp:9.41A Total 40A V-oc Temp Coefficient:-0.29%/°C Branch Circuit 1 (9 Enphase IQ7A-72-2-US (240V)) Output (I-sc x 1.25 x 1.25): 15.3A (9 Qty. X 1.45A X 1.25) = 16.3125A (20A OCPD) Branch Circuit 2 (10 Enphase IQ7A-72-2-US (240V)) (10 Qty. X 1.45A X 1.25) = 18.125A (20A OCPD) SNOHOMISH PUD UTILITY 1 Phase / 60 Hz. OF Z, Y U aS >i aL ELECTRODE PER NEC 705.12 Main Panel Interconnection Information Bus Bar 1 Rating: 200A Main Breaker 1 Rating: 200A PV Back Feed (Actual Load): 34.4375A PV OCPD: 35A Interconnection Calculation: 120% Rule (35A + 200A) = 235A (<=) 240A Three Line Diagram 1 Scale: NTS Ambient Temperature Information Extreme Min Temp: Ambient Temp: -5°C 26°C Ambient Temp. Adjustments 0" to 7/8" Above Roof: 59°C Voltage Drop Information AC Voltage Drop: Total System Voltage Drop: 0.36% 0.36% ID# Z O Q O ILL Z Iz O I— U Q Z O Z O Q O ILL 2 W U0 O m 00 v J vr�n 00 00 J N 00 00 Q Ol 0 LLI O U1 >Q �1 J C7 > > l" O Q H N N N 00 ar LAV U N v Lu J pp O N ua� Lf) Cr O N O n to -r Q O o Or �aLA Y •� l0 N Q (° W O O O LL d O O Z co -a Ol ~O 2 3 O W MUD r, c O p °N ° # 2 N ; w z Q. � Q REVISION BLOCK DESCRIPTION DATE Initial Draft of Plans 4/5/21 Revision 4/7/21 Design By: CNG SOLAR ENGINEERING, INC. SHEET PV INSTALLATION PV-4.1 PROFESSIONAL