Loading...
BLD2021-0509_Other_4.8.2021_3.01.47_PM_2135757PROPOSED 7.6 KW DC SYSTEM (STC) AT 1227 CORONADO PL, EDMON DS, WA 98020 ID# Plot Plan & Photovoltaic Layout PV-1.0 Project Notes, Conduit & Grounding Detail PV-1.1 SCOPE OF WORK: Racking Details PV-2.0 & PV-2.1 THE INSTALLATION CONSISTS OF A 7.6 KW DC SYSTEM Fire Labels & Equipment Elevation PV-3.0 (STC) ROOFTOP SOLAR ARRAY, MULTIPLE Fire Placard PV-3.1 MICRO -INVERTERS, AND RELATED ELECTRICAL METERING 3 Line Diagram PV-4.1 AND SAFETY EQUIPMENT. ALL EQUIPMENT WILL BE Manufacture Spec. Sheets Attached INSTALLED AS REQUIRED BY APPLICABLE CODES AND THE LOCAL UTILITY COMPANY. Sheet Index 1 Scale: N/A OCCUPANCY GROUP: R-3 TYPE OF CONSTRUCTION: TYPE V-B AUTHORITY HAVING JURISDICTION: CITY OF EDMONDS ASSESSORS PARCEL NUMBER: #00602200101000 NUMBER OF STORIES: 2-Story ROOF PITCH: 22.5° Z Site Information Scale: N/A AHJ Notes 3 Scale: N/A •1227 Coronado PI, Edmonds, WA... Vicinity Map 4 Scale: NTS --------------- (E) Standalone Meter (E) 200A MSP w/(E) 200A Main Breaker (N) 60A Utility AC Disconnect #1 (N) "PV Dedicated" 80A Enphase Combiner Box 1 L ------(Under Deck) I N 5 Plot Plan Scale: 1" = 20' Ir 9 (N) Junction Box T� / (Fj Gate (Fj F t7 e e Fa I I ILO O 14'-11' (E) Structur I� e (N) (19) Solaria PowerXT 40OR-PM BLK (N)(19)EnphaselQ7A-72-2-US(240V) SNOHOMISH PUD Roof Access Point Property Lines Fence Line Block Wall Conduit On Roof Conduit In Attic Conduit In Trench z O Q O LL z Ir O U z 0 O m U W J a;m ro 00 000 rn 0 I.0 ovi<m J > O m < ai 1 op v� N u J pp O N ua� LnC � O N O Y � N n v1 -r < 0 Or o — �aLA Y •� l0 N Q l,) w a) 0) 14 Z O O O LL -aa00 0 Z O �-oorn o cr03 0 w ro Ju C O °N ° # O 2 N ; w z a < REVISION BLOCK DESCRIPTION DATE Initial Draft of Plans 4/5/21 Revision 4/7/21 Design By: CNG SOLAR ENGINEERING, INC. SHEET PV INSTALLATION' P V -1.0 PROFESSIONAL