Loading...
BLD1994-0191 Utility Plan.pdf� / Etc 'r1rlCt 'fk>:ES ?o I�MAII-1 r- 3 T`�Q' ......- Z�lee, G �`� �. Type IL N oUr I �_N 63-6is Q r17"3 Q 21 � DISW y / si�rrpc( -ewm2 W 20, / ehsEMErrr- C-OHNr'cr -ro &') SltV 156WEIc 5E1o/wc, A,0J/r-erT C.o / WCEst0t4ca (owWrt'ro VOZPr AtZOACY Sty Se+E @ pR4 o b ZoI II s 2,� EISr iteL,,� lF wwrl l,lrle Gµ4 ex mt LitI qo 80 rt HEIGHT Cp S Pr._ , rwn 1M A 40-1. o Ave MA-ZIMUM AtLLoW, He[C,,H'r 42G.o1 LAAcxf agr¢Qwmi �2,- S¢� loe ¢oj ln,o t Our►tt%�,� LC�,,k, bS<- efArflo� L ar A, 60D07 16olN Sr %J , WHoNOS, WA 'rAx PpcRCeL. # SUHHAP,-( Math Ft ooK 11913 UPPEK 5tLrnZ 1337 Sao CtAt e 359 1b6wGK-S 5 I °4t�et Soh E A t�oc.+cE►zY(4� Moen GA'fcN ��1 - 410 oH�i�-rc�s�r��c SSo1eo'�° E �,�,-1- L�t'o•olt N It 1.,.I!m ff,,:M Sti TM N S� aol eio� 1.J ss MH G7rbN05 UO o — ACCEPTABLE TIGHTLINE MATERIAL Sch 40 PVC ov SDR 35 (ASTM 03034) s,r,Ew^ue- 24.0 A//PPRO ED AS NOTED NEW omvEwA,-r IS" PA -no STREET FILE SHEETINDEX JA t2 r-. �Csc� 1. SITE PLAN 2. FOUNDATION AND LOWER FLOOR PLANS 3. MAIN FLOOR AND UPPER FLOOR PLANS 4. ROOF PLAN AND SECTIONS 5. EXTERIOR ELEVATIONS 6. DETAILS STANDARD. DRAINAGE DETENTION SYSTEM WORKSHEET OWNER ADDRESSt, ,o, CALC BY.�) PHONE:;' 'r DATE: *****DESIGN DATA***** IMPERVIOUS AREA PIPE DIA PIPE LG ORIFICE DETENTION PIPE LENGTH r WASHED GRAVEL OUTFLOW T NCH, MIN KY LONG TOP 4`PERF PIPE TO 8E LEVEL RIM ELEV Z~t� 1'MIN COVER W PAIIL SPACE .i0��.! FROM 2'MA% COVER RIM ELEv CONTROL L OUTLET I+ �wc �av 4` 0 MIN T 4'PERF PIPE .S%_ 1'. SLOPE 4' 0 PIPE MIN. = Z '/C I Z a RUNOFF SPREADER ORIFICE OUTLET INV ELEV '" INV ELEV (AK BA LONTROC BA SIN ' BASIN DEEP, 4'- E' OUARRY SPALLS SYSTEM CROSS SECTION ■2i13` DEEP, 3/4`CREISHED ROCK • _ FROM CONTR + OUTLET , „•,� RIPRAP OUTLET r -ET FILE. R.; FOOTING DRAINS SHALL NOT BE CONNECTED TO DETENTION SYSTEM NOTES: L Call Engineering Division (771-0220) for a tightline and detention system inspection before backfilling and for final inspections. APPROVED BY 2, Responsibility for operation and maintenance of drainage systems on private property is the responsibility of the property owner. Material accumulated in the storage pipe must be flushed out and removed from the catch basins to allow proper operation. The outlet control orifice DATE must be kept open at all times. RG'�i 7 /CI7 Dn no A n F A