Loading...
Building Permit 2020•M MERCIAL BLDG PermitCity PERMITNUM • • • • 1[7 98020BLD2020-0772 www.edmondswa.gov Type: COMMERCIAL BLDG Owner/ Business: GEOFF BRUNSON Status: ISSUED Subtype: COM ALTERATION OR REPAIR Parcel No: 00434400100300 Site Address: 1215TH AVE EDMONDS,WA 98020 Applied: 7/29/2020 Subdivision: 004344 Lot: 0 Issued: 10/14/2020 Fire Sprinklers: Lot Area: Zoning: Final: Valuation: $174,000.00 Occupancy Type: Construction Type: Expiration Date: 10/14/2021 Code Edition: 2015 No. Stories: 0 # of Dwelling Units: 0 Issued by: NED Scope of Work: CITY HALL- EAST WINDOWS REPLACEMENTS WA State Contractor L & I #: SEATTG1134PB City of Edmonds Business License #: 602454996-001-0001 CONTACTS NAME TYPE NAME ADDRESS PHONE EMAIL APPLICANT GEOFF BRUNSON 13421 AMBAUM BLVD. S.W., (206)932-7628 GEOFFB@SEATTLEGLASS.COM SEATTLE WA 98146 CONTACT SEATTLE GLASS INC 13421 AMBAUM BLVD. S.W., (206)932-7628 geoffb@seattleglass.com SEATTLE WA 98146 CONTRACTOR SEATTLE GLASS INC 13421 AMBAUM BLVD SW, (206)932-7628 geoffb@seattleglass.com SEATTLE WA 98146 121 5TH AVE N, EDMONDS WA OWNER EDMONDS CITY OF 98020-3146 •' • DESCRIPTION ACCOUNT AMOUNT PAID PAID DATE RECEIPT # CITY TECHNOLOGY FEE CHARGED 001.000.321.99.1 00.00 $40.00 $40.00 10/14/20 R8068 PER PERMIT COMMERCIAL STATE SURCHARGE 001.000.237.150 $25.00 $25.00 10/14/20 R8068 PERMIT FEE - COMMERCIAL 001.000.322.10.000.00 $1,832.80 $1,832.80 10/14/20 R8068 PLAN REVIEW FEE - COMMERCIAL 001.000.345.83.000.00 $1,557.88 $1,557.88 8/4/20 R6861 TOTALS: $3,455.68 $3,455.68 • • CONDITION TYPE STATUS NOTES Printed: Wednesday, October 14, 2020 9:55:33 AM 1 of 2 • '-rmit PERMIT NUM City of Edmonds . ••� iJIL 1 1-0772- www.-. •. • 1- HOLD HARMLESS - Applicant on behalf of his or her spouse heirs assigns and successors in interests, agrees to indemnify defend and hold harmless the City of Edmonds, Washington, its officials, employees, and agents from any and all claims for damages of whatever nature, arising directly or indirectly from the issuance of this permit. Issuance of this permit shall not be deemed to modify, waive or reduce any requirements of any City ordinance nor limit in any way the City's ability to enforce any ordinance provision. 2 - PERMIT DISCLOSURE - Any request for alternate design, modification, variance or other administrative deviation from adopted codes ordinances or policies must be specifically requested in writing and be called out and identified. Processing fees for such requests FOR shall be established by Council and shall be paid upon submittal and are nonrefundable. ALL BUILDING PERMITS INFORMATION 3- SOUND OR NOISE - Sound/Noise originating from temporary construction sites as a result of construction activity are exempt from the noise limits of ECC Chapter 5.30 only during the hours of 7:00am to 6:00pm on weekdays and 10:00am to 6:00pm on Saturdays, excluding Sundays and Federal Holidays. At all other times the noise originating from construction sites/activities must comply with the noise limits of Chapter 5.30, unless a variance has been granted pursuant to ECC 5.30.120. 4 - OCCUPANCY - Final approval on a project or final occupancy approval must be granted by the Building Official prior to use or occupancy of the building or structure. Check the job card for all required City inspections including final project approval and final occupancy inspections. Installation, use and maintenance of equipment and components shall be per MANUFACTURER SPECS FOR manufacturers specifications, installation instructions, and applicable state codes. INFORMATION Provide manufactures installation instructions on site for Building Inspector. Nothing in this permit approval process shall be interpreted as allowing or permitting the maintenance of any currently existing illegal, nonconforming or unpermitted building, FOR structure or site condition which is outside the scope of the permit application, regardless NONCONFORMING DISCLAIMER INFORMATION of whether such building, structure or condition is shown on the site plan or drawing. Such building, structure or condition may be the subject of a separate enforcement action. 70M R-1 :91 *10111 Eel L1 COMPLETED RES SEQID INSPECTION TYPE INSPECTOR DATE B-7 BUILDING OTHER INSP A-1 BUILDING PRECON X-3 BUILDING FINAL Printed: Wednesday, October 14, 2020 9:55:33 AM 2 of 2