Loading...
Building Permit 2020Permit PERMIT NU of Edmonds iL EdmondsCity 98020 BLD2020-1316 www.edmondswa.gov Type: SOLAR Owner/ Business: LYUDMILA ARSENIY Status: ISSUED Subtype: SOLAR RESIDENTIAL Parcel No: 00572400001100 Site Address: 20228 87TH AVE W EDMONDS,WA 98026-6618 Applied: 12/3/2020 Subdivision: 005724 Lot: 0 Issued: 12/3/2020 Fire Sprinklers: Lot Area: Zoning: Final: Valuation: $0.00 Occupancy Type: Construction Type: Expiration Date: 6/3/2021 Code Edition: 0 No. Stories: 0 # of Dwelling Units: 0 Issued by: WAC Scope of Work: SOLAR WA State Contractor L & I #: PUGETSS920RH City of Edmonds Business License #: 602454996-001-0001 CONTACTS NAME TYPE NAME ADDRESS I PHONE EMAIL APPLICANT LYUDMILA ARSENIY 5308 BAKER AVE NW, SEATTLE (206)619-3818 LARSENIY@PUGETSOUNDSOLAR.COM WA 98107 CONTACT PUGET SOUND SOLAR 5308 BAKER AVE NW, SEATTLE (206)619-3818 larseniy@pugetsoundsolar.com WA 98107 CONTRACTOR PUGET SOUND SOLAR LLC 5308 BAKER AVE NW, SEATTLE (206)706-1931 info@pugetsoundsolar.com WA 98107 20228 87TH AVE W, EDMONDS OWNER THOMAS GARRARD WA 98026-6618 •' • DESCRIPTION ACCOUNT AMOUNT PAID PAID DATE RECEIPT # CITY TECHNOLOGY FEE CHARGED 001.000.321.99.100.00 $40.00 $40.00 12/3/20 R8887 PER PERMIT RESIDENTIAL STATE SURCHARGE 001.000.237.150 $6.50 $6.50 12/3/20 R8887 SOLAR - SUB RES BLDG PERMIT FEE 001.000.322.10.000.00 $60.00 $60.00 12/3/20 R8887 SOLAR - SUB RES FIRE INSP FEE 001.000.342.40.000.00 $60.00 $60.00 12/3/20 R8887 TOTALS: $166.50 $166.50 • • CONDITION TYPE STATUS NOTES Printed: Thursday, December 03, 2020 11:47:15 AM 1 of 2 10LAR Permit PERMIT NUM of Edmonds EdmondsCity 98020 BLD2020-13iJ16 www.edmondswa.gov/425.77 • 1- HOLD HARMLESS - Applicant on behalf of his or her spouse heirs assigns and successors in interests, agrees to indemnify defend and hold harmless the City of Edmonds, Washington, its officials, employees, and agents from any and all claims for damages of whatever nature, arising directly or indirectly from the issuance of this permit. Issuance of this permit shall not be deemed to modify, waive or reduce any requirements of any City ordinance nor limit in any way the City's ability to enforce any ordinance provision. 2 - PERMIT DISCLOSURE - Any request for alternate design, modification, variance or other administrative deviation from adopted codes ordinances or policies must be specifically requested in writing and be called out and identified. Processing fees for such requests FOR shall be established by Council and shall be paid upon submittal and are nonrefundable. ALL BUILDING PERMITS INFORMATION 3- SOUND OR NOISE - Sound/Noise originating from temporary construction sites as a result of construction activity are exempt from the noise limits of ECC Chapter 5.30 only during the hours of 7:00am to 6:00pm on weekdays and 10:00am to 6:00pm on Saturdays, excluding Sundays and Federal Holidays. At all other times the noise originating from construction sites/activities must comply with the noise limits of Chapter 5.30, unless a variance has been granted pursuant to ECC 5.30.120. 4 - OCCUPANCY - Final approval on a project or final occupancy approval must be granted by the Building Official prior to use or occupancy of the building or structure. Check the job card for all required City inspections including final project approval and final occupancy inspections. ELECTRICAL PERMIT FOR Obtain Electrical Permit from State Department of Labor and Industries 425-290-1309. NFORMATION WL ma • -• - • • •- • C • COMPLETED RESULT WN7OTES SEQID INSPECTION TYPE INSPECTOR DATE X-1 FIRE FINAL X-3 BUILDING FINAL" Printed: Thursday, December 03, 2020 11:47:15 AM 2 of 2