Loading...
Building PermitType: PLUMBING Subtype: COMMERCIAL PLUMBING Status: ISSUED Parcel No: 00454800300700 Site Address: 102 MAIN ST EDMONDS,WA 98020-3132 Applied: 11/19/2019 Subdivision: 004548 Lot: Issued: 12/16/2019 WAC Fire Sprinklers: No Lot Area: 0 Zoning: Finaled: Valuation: Occupancy Type: Construction Type: Expired: 6/13/2020 WAC Code Edition: No. Stories: 0 # of Dwelling Units: 0 WORK DESCRIPTION: PLUMBING, GREASE TRAP FOR NEW RESTAURANT TI CONTACTS NAME TYPE NAME ADDRESS PHONE EMAIL APPLICANT INFINITY PLUMBING LLC 6712 200TH ST SW APT 1, (425)508-9438 THEINFINITYPLUMBING@YAHOO. LYNNWOOD WA 98036 COM CONTRACTOR INFINITY PLUMBING LLC 6712 200TH ST SW APT 1, (425)508-9438 THEINFINITYPLUMBING@YAHOO. LYNNWOOD WA 98036 COM OWNER KAHLO'S CANTINA PO BOX 84325, SEATTLE WA GSHARAWY@LIVE.COM 98124 Contractor License Information: WA State Contractor L & I #:INFINPL816LS City of Edmonds Business License #: 602454996-001- 0001 •• • DESCRIPTION ACCOUNT AMOUNT PAID PAID DATE RECEIPT # BACKFLOW 2 INCH 001.000.322.10.000.00 $120.00 $0.00 BASE FEE FOR PLUMBING 001.000.322.10.000.00 $40.00 $0.00 PERMITS GREASE TRAP 001.000.322.10.000.00 $400.00 $0.00 PER FIXTURE ON ONE TRAP 001.000.322.10.000.00 $432.00 $0.00 PLUMBING PLAN REVIEW FEE 001.000.322.10.000.00 $500.00 $0.00 HOURS WATER HEATER INCLUDING 001.000.322.10.000.00 $12.00 $0.00 EXPANSION TANK X-TECHNOLOGY FEE 001.000.321.99.100.00 $35.00 TOTALS: $1,539.00 $0.00 CONDITIONS CONDITION TYPE STATUS NOTES Applicant, on behalf of his or her spouse, heirs, assigns, and successors in interests, agrees to indemnify defend and hold harmless the City of Edmonds, Washington, its officials, employees, and agents from any and all claims for Hold Harmless damages of whatever nature, arising directly or indirectly from the issuance for this permit. Issuance of this permit shall not be deemed to modify, waive or reduce any requirements of any City ordinance nor limit in any way the City's ability to enforce any ordinance provision. Printed: Monday, December 16, 2019 8:24:30 AM 1 of 2 PLUMBING City of • • • ..0 1 :: www.edmondswa.gov Final approval on a project or final occupancy approval must be granted by the Building Official prior to use or occupancy of the building or structure. Check the Occupancy job card for all required City inspections including final project approval and final occupancy inspections. Any request for alternate design, modification, variance or other administrative deviation (hereinafter "variance") from adopted codes, ordinances or policies must be specifically requested in writing and be called out and identified. Processing fees for such request shall be established by Council and shall be paid upon submittal and are non-refundable. Permit Disclaimer Approval of any plat or plan containing provisions which do not comply with city code and for which a variance has not been specifically identified, requested and considered by the appropriate city official in accordance with the appropriate provision of city code or state law does not approve any items not to code specification. FOR Pursuant to UPC 608 a pressure regulator valve (PRV) shall be installed near the PRV REQUIRED INFORMATION water shutoff. Separate Permit Required For: Gas Piping; FOR Commercial dishwasher (kitchen item 7) will require a Type 2 hood, under a SEPARATE PERMIT REQUIRED INFORMATION separate permit; L&I Boiler. Sound/Noise originating from temporary construction sites as a result of construction activity are exempt from the noise limits of ECC Chapter 5.30 only Sound/Noise during the hours of 7:OOam to 6:OOpm on weekdays and 10:OOam and 6:OOpm on Saturdays, excluding Sundays and Federal Holidays. At all other times the noise originating from construction sites/activities must comply with the noise limits of Chapter 5.30, unless a variance has been granted pursuant to ECC 5.30.120. INSPECTIONS SEQID INSPECTION TYPE INSPECTOR COMPLETED RESULT NOTES DATE B-3 PLUMB GROUND WK BG1 B-3 PLUMB ROUGH IN BG1 B-4 CROSS CONN FINAL BG1 B-5 PLUMB FINAL BG1 GRSE TRAP WWTP KRL Discuss island venting- foot vents vs AAV's. See B-1 BUILDING PRECON BG1 plans. See separate permits required in Conditions. Printed: Monday, December 16, 2019 8:24:30 AM 2 of 2