Loading...
Building Permit 2020PermitMECHANICAL PERMIT NU of Edmonds EdmondsCity •:i 1 4 • www.edmondswa.gov Type: MECHANICAL Owner/ Business: KAHLOS Status: ISSUED Subtype: COMMERCIAL MECHANICAL Parcel No: 00454800300700 Site Address: 102 MAIN ST EDMONDS,WA 98020-3132 Applied: 11/21/2019 Subdivision: 004548 Lot: Issued: 2/3/2020 Fire Sprinklers: No Lot Area: 0 Zoning: Final: Valuation: Occupancy Type: Construction Type: Expiration Date: 8/1/2020 Code Edition: No. Stories: 0 # of Dwelling Units: 0 Issued by: NED Scope of Work: INSTALL NEW DUCT WORK IN REMODELED RESTAURANT. NO NEW EQUIPM WA State Contractor L & I #:ALSHEHA859P1 City of Edmonds Business License #: 602454996-001-0001 CONTACTS NAME TYPE NAME ADDRESS PHONE EMAIL APPLICANT REMARKABLE REMODELS 26910 92ND AVE NW #147, (412)542-8993 ALSHEATINGI5@GMAIL.COM STANWOOD WA 98292 CONTRACTOR REMARKABLE REMODELS 26910 92ND AVE NW #147, (412)542-8993 ALSHEATINGI5@GMAIL.COM STANWOOD WA 98292 OWNER KAHLOS PO BOX 84325, SEATTLE WA 198124 FEE INFORMATION DESCRIPTION ACCOUNT AMOUNT PAID PAID DATE RECEIPT # B-BUILDING PLAN REVIEW FEE 001.000.345.83.000.00 $100.00 B-MECHANICAL PERMIT FEE 001.000.322.10.000.00 $100.00 X-TECHNOLOGY FEE 001.000.321.99.100.00 $35.00 TOTALS: $235.00 CONDITIONS CONDITION TYPE STATUS NOTES Applicant, on behalf of his or her spouse, heirs, assigns, and successors in interests, agrees to indemnify defend and hold harmless the City of Edmonds, Washington, its Hold Harmless officials, employees, and agents from any and all claims for damages of whatever nature, arising directly or indirectly from the issuance for this permit. Issuance of this permit shall not be deemed to modify, waive or reduce any requirements of any City ordinance nor limit in any way the City's ability to enforce any ordinance provision. Final approval on a project or final occupancy approval must be granted by the Building Occupancy Official prior to use or occupancy of the building or structure. Check the job card for all required City inspections including final project approval and final occupancy inspections. Any request for alternate design, modification, variance or other administrative deviation (hereinafter "variance") from adopted codes, ordinances or policies must be specifically requested in writing and be called out and identified. Processing fees for such request shall be established by Council and shall be paid upon submittal and are non-refundable. Permit Disclaimer Approval of any plat or plan containing provisions which do not comply with city code and for which a variance has not been specifically identified, requested and considered by the appropriate city official in accordance with the appropriate provision of city code or state law does not approve any items not to code specification. Printed: Monday, February 03, 2020 9:32:31 AM 1 of 2 Permit PERMITNUM' City of • • • Edmonds98020 &LBLD2019-1498 -. •. IL Sound/Noise originating from temporary construction sites as a result of construction activity are exempt from the noise limits of ECC Chapter 5.30 only during the hours of Sound/Noise 7:00am to 6:00pm on weekdays and 10:00am and 6:00pm on Saturdays, excluding Sundays and Federal Holidays. At all other times the noise originating from construction sites/activities must comply with the noise limits of Chapter 5.30, unless a variance has been granted pursuant to ECC 5.30.120. INSPECTIONSEL COMPLETED RESULT SEQID INSPECTION TYPE INSPECTOR NOTES DATE B-3 MECH ROUGH IN X-0 MECH FINAL" Printed: Monday, February 03, 2020 9:32:31 AM 2 of 2