Loading...
Permit response 1 BLD2020-0133GREENWALK DESIGNS LLC. 12733 39TH AVE. NE PHONE: 206.5%9296 SEATTLE, WA 98125 EMAIL: SBARNESOCORNERSTONEARCH COM April 6, 2020 City of Edmonds Development Services Coordinator 121 5tn Ave. N Edmonds, Washington 98020 RE: Project # BLD2020-0133, 6805 157' Place SW PLANS EXAMINER 1. Sheet AC1: Energy credits are shown on sheet Al.. 2. Sheet Al: Rockeries have been changed to segmental retaining walls and have been designed to comply with ECDC section 18.40.020. Notes have been added to alert contractor he cannot building the retaining wall withing the easement and that it can not exceed 3' of height in the setback. 3. Sheet A2.2: The house uses a forced air furnace and air will be provided to the laundry room for make up air.. 4. Sheet S1: Special inspections will only be used sparingly where required by IBC. All insepctions will be through city of Edmonds, it is not the intent of the note to say city will not be contacted for inspections. 5. Sheet S2: See S2 for detail callout of foundation detail 2/S1. PLANNER 1. Lot Coverage: Lot coverage calculations have been corrected as requested. 2. Height Calculations: Elevations have been adjusted and height calculations corrected. 3. Height Elevation: Elevations on exterior elevations have been corrected to correspond with those shown on site plan. Actual building heights above average grade have been added to exterior elevations. 4. Datum Point: Datum point has been moved to front of house at edge of garage floor slab under garage door. 5. Site Plan Corrections: a. Eave line has been labelled and not added stating that eave cannot extend more than 30" into building setback. b. Property boundary bearing and length have been added to plan. c. Scale has been corrected. d. Section has been reviewed for design requirements and noted on the retaining wall callout. e. Retaining wall notes have been added and rockery has been changed to segmental block wall. Sincerely, JF7 Steve Barnes AIA