Loading...
Building Permit 2020ERCIAL ■ LDG Permit NUM City of Edmonds EdmondsPERMIT •:i 1 1 1 -. •.71.0220 Type: COMMERCIAL BLDG Owner/ Business: THIRD AVENUE SOUTH PROPERTIES LLC Status: ISSUED Subtype: COM DECK OR PATIO Parcel No: 00434212000301 Site Address: 508 MAIN ST EDMONDS,WA 98020-3148 Applied: 2/24/2020 Subdivision: 004342 Lot: 0 Issued: 6/16/2020 Fire Sprinklers: No Lot Area: Zoning: 13131 Final: Valuation: $4,000.00 Occupancy Type: Construction Type: VB Expiration Date: 6/16/2021 Code Edition: 2015 No. Stories: 0 # of Dwelling Units: 0 Issued by: JOK Scope of Work: MAR-KET - INSTALL PERGOLA W/ EXTERIOR HEAT TUBE WA State Contractor L & I #: CUSTOW*178RR City of Edmonds Business License #: 602454996-001-0001 CONTACTS NAME TYPE NAME ADDRESS PHONE EMAIL APPLICANT FEED ME HOSPITALITY PO BOX 1952, EDMONDS WA (206)588-5148 SHUBERT@FEEDMEHOSPITALITY.COM 98020 CONTRACTOR CUSTOM WOODWORK 1312 3RD ST, KIRKLAND WA (425)828-2579 98033 THIRD AVENUE SOUTH 229 3RD AVE S STE 301, OWNER PROPERTIES LLC EDMONDS WA98020 FEE INFORMATION DESCRIPTION ACCOUNT AMOUNT PAID PAID DATE RECEIPT # ADB REVIEW TYPE 1 001.000.345.81.000.00 $275.00 $0.00 CITY TECHNOLOGY FEE CHARGED 001.000.321.99.100.00 $40.00 $0.00 PER PERMIT COMMERCIAL STATE SURCHARGE 001.000.237.150 $25.00 $0.00 ENGINEERING INSPECTION FEE 001.000.341.82.000.00 $110.00 $0.00 PERMIT FEE - COMMERCIAL 001.000.322.10.000.00 $223.60 $0.00 PLAN REVIEW FEE - COMMERCIAL 001.000.345.83.000.00 $190.06 $190.06 2/24/20 R3845 TOTALS: $863.66 $190.06 77 CONDITION TYPE STATUS NOTES Printed: Tuesday, June 16, 2020 12:12:57 PM 1 of 2 ■ LDG Permit ir of • • • PERMITNUM City 121 5th Ave N, Edmonds WA •:i66 1 1 1 www.edmondswa.gov • 1- HOLD HARMLESS - Applicant on behalf of his or her spouse heirs assigns and successors in interests, agrees to indemnify defend and hold harmless the City of Edmonds, Washington, its officials, employees, and agents from any and all claims for damages of whatever nature, arising directly or indirectly from the issuance of this permit. Issuance of this permit shall not be deemed to modify, waive or reduce any requirements of any City ordinance nor limit in any way the City's ability to enforce any ordinance provision. 2 - PERMIT DISCLOSURE - Any request for alternate design, modification, variance or other administrative deviation from adopted codes ordinances or policies must be specifically requested in writing and be called out and identified. Processing fees for such requests ALL BUILDING PERMITS FOR shall be established by Council and shall be paid upon submittal and are nonrefundable. INFORMATION 3- SOUND OR NOISE - Sound/Noise originating from temporary construction sites as a result of construction activity are exempt from the noise limits of ECC Chapter 5.30 only during the hours of 7:00am to 6:00pm on weekdays and 10:00am to 6:00pm on Saturdays, excluding Sundays and Federal Holidays. At all other times the noise originating from construction sites/activities must comply with the noise limits of Chapter 5.30, unless a variance has been granted pursuant to ECC 5.30.120. 4 - OCCUPANCY - Final approval on a project or final occupancy approval must be granted by the Building Official prior to use or occupancy of the building or structure. Check the job card for all required City inspections including final project approval and final occupancy inspections. GAS PIPE TEST O Gas pipe test must be observed by City Building Inspector, affidavits shall not be accepted ORMATION Installation, use and maintenance of equipment and components shall be per MANUFACTURER SPECS FOR manufacturers specifications, installation instructions, and applicable state codes. INFORMATION Provide manufactures installation instructions on site for Building Inspector. •NS - Schedule •nline at: https://Inspection.MvBuildingPermit.co COMPLETED RESULT SEQID INSPECTION TYPE INSPECTOR NOTES DATE B-4 FRAMING B-7 BUILDING OTHER INSP X-3 BUILDING FINAL" X-2 ENGINEERING FINAL Printed: Tuesday, June 16, 2020 12:12:57 PM 2 of 2