Building Permit 2020ERCIAL ■ LDG Permit
NUM
City of Edmonds
EdmondsPERMIT
•:i 1 1 1
-. •.71.0220
Type: COMMERCIAL BLDG Owner/ Business: THIRD AVENUE SOUTH PROPERTIES LLC Status: ISSUED
Subtype: COM DECK OR PATIO
Parcel No: 00434212000301 Site Address: 508 MAIN ST EDMONDS,WA 98020-3148
Applied: 2/24/2020
Subdivision: 004342 Lot: 0
Issued: 6/16/2020
Fire Sprinklers: No Lot Area: Zoning: 13131
Final:
Valuation: $4,000.00 Occupancy Type: Construction Type: VB
Expiration Date: 6/16/2021
Code Edition: 2015 No. Stories: 0 # of Dwelling Units: 0
Issued by: JOK
Scope of Work: MAR-KET - INSTALL PERGOLA W/ EXTERIOR HEAT TUBE
WA State Contractor L & I #: CUSTOW*178RR City of Edmonds Business License #: 602454996-001-0001
CONTACTS
NAME TYPE NAME ADDRESS PHONE
EMAIL
APPLICANT FEED ME HOSPITALITY PO BOX 1952, EDMONDS WA (206)588-5148
SHUBERT@FEEDMEHOSPITALITY.COM
98020
CONTRACTOR CUSTOM WOODWORK 1312 3RD ST, KIRKLAND WA (425)828-2579
98033
THIRD AVENUE SOUTH 229 3RD AVE S STE 301,
OWNER
PROPERTIES LLC EDMONDS WA98020
FEE INFORMATION
DESCRIPTION
ACCOUNT AMOUNT
PAID PAID DATE RECEIPT #
ADB REVIEW TYPE 1
001.000.345.81.000.00
$275.00
$0.00
CITY TECHNOLOGY FEE CHARGED
001.000.321.99.100.00
$40.00
$0.00
PER PERMIT
COMMERCIAL STATE SURCHARGE
001.000.237.150
$25.00
$0.00
ENGINEERING INSPECTION FEE
001.000.341.82.000.00
$110.00
$0.00
PERMIT FEE - COMMERCIAL
001.000.322.10.000.00
$223.60
$0.00
PLAN REVIEW FEE - COMMERCIAL
001.000.345.83.000.00
$190.06
$190.06
2/24/20
R3845
TOTALS: $863.66 $190.06
77
CONDITION TYPE STATUS NOTES
Printed: Tuesday, June 16, 2020 12:12:57 PM 1 of 2
■ LDG Permit
ir
of • • • PERMITNUM
City
121 5th
Ave N, Edmonds WA •:i66 1 1 1
www.edmondswa.gov •
1- HOLD HARMLESS - Applicant on behalf of his or her spouse heirs assigns and successors
in interests, agrees to indemnify defend and hold harmless the City of Edmonds,
Washington, its officials, employees, and agents from any and all claims for damages of
whatever nature, arising directly or indirectly from the issuance of this permit. Issuance
of this permit shall not be deemed to modify, waive or reduce any requirements of any
City ordinance nor limit in any way the City's ability to enforce any ordinance provision. 2
- PERMIT DISCLOSURE - Any request for alternate design, modification, variance or other
administrative deviation from adopted codes ordinances or policies must be specifically
requested in writing and be called out and identified. Processing fees for such requests
ALL BUILDING PERMITS
FOR
shall be established by Council and shall be paid upon submittal and are nonrefundable.
INFORMATION
3- SOUND OR NOISE - Sound/Noise originating from temporary construction sites as a
result of construction activity are exempt from the noise limits of ECC Chapter 5.30 only
during the hours of 7:00am to 6:00pm on weekdays and 10:00am to 6:00pm on Saturdays,
excluding Sundays and Federal Holidays. At all other times the noise originating from
construction sites/activities must comply with the noise limits of Chapter 5.30, unless a
variance has been granted pursuant to ECC 5.30.120. 4 - OCCUPANCY - Final approval on a
project or final occupancy approval must be granted by the Building Official prior to use
or occupancy of the building or structure. Check the job card for all required City
inspections including final project approval and final occupancy inspections.
GAS PIPE TEST
O
Gas pipe test must be observed by City Building Inspector, affidavits shall not be accepted
ORMATION
Installation, use and maintenance of equipment and components shall be per
MANUFACTURER SPECS
FOR
manufacturers specifications, installation instructions, and applicable state codes.
INFORMATION
Provide manufactures installation instructions on site for Building Inspector.
•NS
- Schedule
•nline
at: https://Inspection.MvBuildingPermit.co
COMPLETED
RESULT
SEQID
INSPECTION TYPE
INSPECTOR
NOTES
DATE
B-4 FRAMING
B-7 BUILDING OTHER INSP
X-3 BUILDING FINAL"
X-2 ENGINEERING FINAL
Printed: Tuesday, June 16, 2020 12:12:57 PM 2 of 2