Building PermitD • Permit
PERMIT NUM
of Edmonds
EdmondsCity
98020
BLD2021-02318
www.edmondswa.gov
Type: DEMO
Owner/ Business: JESSE BINFORD
Status: ISSUED
Subtype: COM PRIMARY STRUCTURE
DEMO
Site Address: 9617 FIRDALE AVE 9601 EDMONDS,WA 98020-
Parcel No: 00449900000100
Applied: 2/11/2021
6519
Subdivision: 004503, 004499
Lot: 0
Issued: 4/26/2021
Fire Sprinklers:
Lot Area: Zoning:
Final:
Valuation: $0.00
Occupancy Type: Construction Type:
Expiration Date: 10/23/2021
Code Edition: 0
No. Stories: 0 # of Dwelling Units: 0
Issued by: NED
Scope of Work: FIRDALE MARKET- DEMO (FIRE) ALL- TO MAIN FLOOR
WA State Contractor L & I #: City of Edmonds Business License #: 602454996-001-0001
CONTACTS
NAME TYPE NAME
ADDRESS
PHONE
EMAIL
APPLICANT
JESSE BINFORD
3605 C ST NE, AUBURN WA
(253)833-5557
JBINFORD@BCIE.NET
98002
CONTACT
BC INVESTIGATIVE
3605 C ST NE, AUBURN WA
(253)833-5557
jbinford@bcie.net
ENGINEERS
98002
CONTRACTOR
STATEWIDE RESTORATION
12838-A NE AIRPORT WAY,
(425)829-4050
mike.poor@gostatewide.com
INC
PORTLAND OR 97230
9500 ROOSEVELT WAY NE 100,
OWNER
FIRDALE ASSOCIATES
LLC
SEATTLE WA 98115
DESCRIPTION
ACCOUNT AMOUNT
PAID
PAID DATE RECEIPT#
CITY TECHNOLOGY FEE CHARGED
001.000.321.99.100.00
$40.00
$40.00
2/11/21
R10456
PER PERMIT
COMMERCIAL STATE SURCHARGE
001.000.237.150
$25.00
$25.00
2/11/21
R10456
DEMO - SUB COM BLDG PERMIT
001.000.322.10.000.00
$150.00
$150.00
2/11/21
R10456
FEE
DEMO - SUB COM BLDG PLAN
001.000.345.83.000.00
$100.00
$100.00
2/11/21
R10456
REVIEW FEE
DEMO - SUB COM ENG INSP FEE
001.000.341.82.000.00
$150.00
$150.00
2/11/21
R10456
DEMO - SUB COM ENG REVIEW FEE
001.000.341.82.000.00
$100.00
$100.00
2/11/21
R10456
TOTALS: $565.00 $565.00
• •
CONDITION TYPE
STATUS
NOTES
Printed: Monday, April 26, 2021 11:54:40 AM 1 of 3
DTMO Permit
PERMIT NU
of Edmonds
I
EdmondsCity
•:0BLD2021-0238,
www.edmondswa.gov
•
1- HOLD HARMLESS - Applicant on behalf of his or her spouse heirs assigns and successors
in interests, agrees to indemnify defend and hold harmless the City of Edmonds,
Washington, its officials, employees, and agents from any and all claims for damages of
whatever nature, arising directly or indirectly from the issuance of this permit. Issuance
of this permit shall not be deemed to modify, waive or reduce any requirements of any
City ordinance nor limit in any way the City's ability to enforce any ordinance provision. 2
- PERMIT DISCLOSURE - Any request for alternate design, modification, variance or other
administrative deviation from adopted codes ordinances or policies must be specifically
requested in writing and be called out and identified. Processing fees for such requests
shall be established by Council and shall be paid upon submittal and are nonrefundable.
3- SOUND OR NOISE - Sound/Noise originating from temporary construction sites as a
ALL BUILDING PERMITS
FOR
result of construction activity are exempt from the noise limits of ECC Chapter 5.30 only
INFORMATION
during the hours of 7:OOam to 6:OOpm on weekdays and 10:OOam to 6:OOpm on
Saturdays, excluding Sundays and Federal Holidays. At all other times the noise
originating from construction sites/activities must comply with the noise limits of
Chapter 5.30, unless a variance has been granted pursuant to ECC 5.30.120. 4 -
OCCUPANCY - Final approval on a project or final occupancy approval must be granted by
the Building Official prior to use or occupancy of the building or structure. Check the job
card for all required City inspections including final project approval and final occupancy
inspections. 5 - PLUMBING - Plumbing contractor license laws are regulated by Chapter
18.106 RCW. Property owners who hire an unlicensed plumber may assume the risks and
potential monetary liability for work performed by unlicensed plumbing contractors. For
more information contact L&I Department of Licensing at 1-800-647-0982.
1. The Demolition Plan indicates the demolition of a substantial portion of the existing
structure. Please be aware that structures that are demolished to the level that meets or
exceeds 75% of the replacement cost of the structure will not be allowed by city code to
be rebuilt except to full -on standards for new construction. Reference Edmonds
Community Development Code section 19.00.045. In order to verify that your project
does not meet this threshold, the following must be provided to the city:
a. A cost breakdown showing the demolition is less than 75% of the replacement cost of
the building.
b. The permit drawings must demonstrate coordination with the cost breakdown. Please
BUILDING OTHER
FOR
contact me if you need further clarification on this issue.
INFORMATION
OR
The construction project involves demolition of a significant portion of the existing
structure. Structures that are demolished to the level that meets or exceeds 75% of the
replacement cost of the structure will not be allowed by city code to be rebuilt except to
full -on standards for new construction. Reference Edmonds Community Development
Code section 19.00.045.
Nothing in this permit approval process shall be interpreted as allowing or permitting the
maintenance of any currently existing illegal, nonconforming or unpermitted building,
FOR
structure or site condition which is outside the scope of the permit application, regardless
NONCONFORMING DISCLAIMER
INFORMATION
of whether such building, structure or condition is shown on the site plan or drawing.
Such building, structure or condition may be the subject of a separate enforcement
action.
Printed: Monday, April 26, 2021 11:54:40 AM 2 of 3
D • PerCity mit
PERMITNUM
• • •
•:0 1 1
www.edmondswa.gov A
IF STRUCTURE IS DEMOLISHED TO A LEVEL THAT MEETS OR EXCEEDS 75% OF THE
REPLACEMENT COST OF THE STRUCTURE THEN THE REPLACEMENT STRUCTURE MUST BE
RECONSTRUCTED IN FULL CONFORMANCE WITH THE PROVISIONS OF THE EDMONDS
COMMUNITY DEVELOPMENT CODE WHICH WOULD INCLUDE, BUT IS NOT LIMITED TO,
COMPLIANCE WITH CHAPTER 16.100 ECDC THE FIRDALE VILLAGE MIXED -USE ZONE AND
FOR
CHAPTER 22.100 ECDC FIRDALE VILLAGE SITE DESIGN STANDARDS.
OTHER CONDITION
INFORMATION
IF REPLACEMENT STRUCTURE DOES NOT EXCEED THE 75% PREPLACEMENT COST
THRESHOLD THEN THE BUILDING MAY BE REPAIRED AND RETURNED TO ITS FORMER
SIZE, SHAPE AND LOCATION AS EXISTED BEFORE THE DAMAGE OCCURRED. AN
APPLICATION FOR A BUILDING PERMIT MUST BE FILED WITHIN 18 MONTHS FROM THE
DATE OF DAMAGE IN ORDER TO BE VESTED.
The issuance of this permit in no way constitutes approval from any other agencies
FOR
REGULATING AGENCIES
having regulatory authority over the facility and this construction activity. It is the
INFORMATION
responsibility of the property owner to obtain any and all such required approvals.
Jill
COMPLETED RESULT
SEQID INSPECTION TYPE
7INSPECTORO
NOTES
I r
DATE
X-3 BUILDING FINAL**
Printed: Monday, April 26, 2021 11:54:40 AM 3 of 3