Loading...
Building PermitD • Permit PERMIT NUM of Edmonds EdmondsCity 98020 BLD2021-02318 www.edmondswa.gov Type: DEMO Owner/ Business: JESSE BINFORD Status: ISSUED Subtype: COM PRIMARY STRUCTURE DEMO Site Address: 9617 FIRDALE AVE 9601 EDMONDS,WA 98020- Parcel No: 00449900000100 Applied: 2/11/2021 6519 Subdivision: 004503, 004499 Lot: 0 Issued: 4/26/2021 Fire Sprinklers: Lot Area: Zoning: Final: Valuation: $0.00 Occupancy Type: Construction Type: Expiration Date: 10/23/2021 Code Edition: 0 No. Stories: 0 # of Dwelling Units: 0 Issued by: NED Scope of Work: FIRDALE MARKET- DEMO (FIRE) ALL- TO MAIN FLOOR WA State Contractor L & I #: City of Edmonds Business License #: 602454996-001-0001 CONTACTS NAME TYPE NAME ADDRESS PHONE EMAIL APPLICANT JESSE BINFORD 3605 C ST NE, AUBURN WA (253)833-5557 JBINFORD@BCIE.NET 98002 CONTACT BC INVESTIGATIVE 3605 C ST NE, AUBURN WA (253)833-5557 jbinford@bcie.net ENGINEERS 98002 CONTRACTOR STATEWIDE RESTORATION 12838-A NE AIRPORT WAY, (425)829-4050 mike.poor@gostatewide.com INC PORTLAND OR 97230 9500 ROOSEVELT WAY NE 100, OWNER FIRDALE ASSOCIATES LLC SEATTLE WA 98115 DESCRIPTION ACCOUNT AMOUNT PAID PAID DATE RECEIPT# CITY TECHNOLOGY FEE CHARGED 001.000.321.99.100.00 $40.00 $40.00 2/11/21 R10456 PER PERMIT COMMERCIAL STATE SURCHARGE 001.000.237.150 $25.00 $25.00 2/11/21 R10456 DEMO - SUB COM BLDG PERMIT 001.000.322.10.000.00 $150.00 $150.00 2/11/21 R10456 FEE DEMO - SUB COM BLDG PLAN 001.000.345.83.000.00 $100.00 $100.00 2/11/21 R10456 REVIEW FEE DEMO - SUB COM ENG INSP FEE 001.000.341.82.000.00 $150.00 $150.00 2/11/21 R10456 DEMO - SUB COM ENG REVIEW FEE 001.000.341.82.000.00 $100.00 $100.00 2/11/21 R10456 TOTALS: $565.00 $565.00 • • CONDITION TYPE STATUS NOTES Printed: Monday, April 26, 2021 11:54:40 AM 1 of 3 DTMO Permit PERMIT NU of Edmonds I EdmondsCity •:0BLD2021-0238, www.edmondswa.gov • 1- HOLD HARMLESS - Applicant on behalf of his or her spouse heirs assigns and successors in interests, agrees to indemnify defend and hold harmless the City of Edmonds, Washington, its officials, employees, and agents from any and all claims for damages of whatever nature, arising directly or indirectly from the issuance of this permit. Issuance of this permit shall not be deemed to modify, waive or reduce any requirements of any City ordinance nor limit in any way the City's ability to enforce any ordinance provision. 2 - PERMIT DISCLOSURE - Any request for alternate design, modification, variance or other administrative deviation from adopted codes ordinances or policies must be specifically requested in writing and be called out and identified. Processing fees for such requests shall be established by Council and shall be paid upon submittal and are nonrefundable. 3- SOUND OR NOISE - Sound/Noise originating from temporary construction sites as a ALL BUILDING PERMITS FOR result of construction activity are exempt from the noise limits of ECC Chapter 5.30 only INFORMATION during the hours of 7:OOam to 6:OOpm on weekdays and 10:OOam to 6:OOpm on Saturdays, excluding Sundays and Federal Holidays. At all other times the noise originating from construction sites/activities must comply with the noise limits of Chapter 5.30, unless a variance has been granted pursuant to ECC 5.30.120. 4 - OCCUPANCY - Final approval on a project or final occupancy approval must be granted by the Building Official prior to use or occupancy of the building or structure. Check the job card for all required City inspections including final project approval and final occupancy inspections. 5 - PLUMBING - Plumbing contractor license laws are regulated by Chapter 18.106 RCW. Property owners who hire an unlicensed plumber may assume the risks and potential monetary liability for work performed by unlicensed plumbing contractors. For more information contact L&I Department of Licensing at 1-800-647-0982. 1. The Demolition Plan indicates the demolition of a substantial portion of the existing structure. Please be aware that structures that are demolished to the level that meets or exceeds 75% of the replacement cost of the structure will not be allowed by city code to be rebuilt except to full -on standards for new construction. Reference Edmonds Community Development Code section 19.00.045. In order to verify that your project does not meet this threshold, the following must be provided to the city: a. A cost breakdown showing the demolition is less than 75% of the replacement cost of the building. b. The permit drawings must demonstrate coordination with the cost breakdown. Please BUILDING OTHER FOR contact me if you need further clarification on this issue. INFORMATION OR The construction project involves demolition of a significant portion of the existing structure. Structures that are demolished to the level that meets or exceeds 75% of the replacement cost of the structure will not be allowed by city code to be rebuilt except to full -on standards for new construction. Reference Edmonds Community Development Code section 19.00.045. Nothing in this permit approval process shall be interpreted as allowing or permitting the maintenance of any currently existing illegal, nonconforming or unpermitted building, FOR structure or site condition which is outside the scope of the permit application, regardless NONCONFORMING DISCLAIMER INFORMATION of whether such building, structure or condition is shown on the site plan or drawing. Such building, structure or condition may be the subject of a separate enforcement action. Printed: Monday, April 26, 2021 11:54:40 AM 2 of 3 D • PerCity mit PERMITNUM • • • •:0 1 1 www.edmondswa.gov A IF STRUCTURE IS DEMOLISHED TO A LEVEL THAT MEETS OR EXCEEDS 75% OF THE REPLACEMENT COST OF THE STRUCTURE THEN THE REPLACEMENT STRUCTURE MUST BE RECONSTRUCTED IN FULL CONFORMANCE WITH THE PROVISIONS OF THE EDMONDS COMMUNITY DEVELOPMENT CODE WHICH WOULD INCLUDE, BUT IS NOT LIMITED TO, COMPLIANCE WITH CHAPTER 16.100 ECDC THE FIRDALE VILLAGE MIXED -USE ZONE AND FOR CHAPTER 22.100 ECDC FIRDALE VILLAGE SITE DESIGN STANDARDS. OTHER CONDITION INFORMATION IF REPLACEMENT STRUCTURE DOES NOT EXCEED THE 75% PREPLACEMENT COST THRESHOLD THEN THE BUILDING MAY BE REPAIRED AND RETURNED TO ITS FORMER SIZE, SHAPE AND LOCATION AS EXISTED BEFORE THE DAMAGE OCCURRED. AN APPLICATION FOR A BUILDING PERMIT MUST BE FILED WITHIN 18 MONTHS FROM THE DATE OF DAMAGE IN ORDER TO BE VESTED. The issuance of this permit in no way constitutes approval from any other agencies FOR REGULATING AGENCIES having regulatory authority over the facility and this construction activity. It is the INFORMATION responsibility of the property owner to obtain any and all such required approvals. Jill COMPLETED RESULT SEQID INSPECTION TYPE 7INSPECTORO NOTES I r DATE X-3 BUILDING FINAL** Printed: Monday, April 26, 2021 11:54:40 AM 3 of 3