Loading...
Building Permit'S IDENTIAL BLDG Permit PERMIT NUM of Edmonds EdmondsCity 98020BLD2021-03216 wwm www.edmondswa.gov Type: RESIDENTIAL BLDG Owner/ Business: KATHRYN RASMUSSEN Status: ISSUED Subtype: DECK Parcel No: 00746900000600 Site Address: 9914 242ND PL SW EDMONDS,WA 98020-5786 Applied: 3/4/2021 Subdivision: 007469 Lot: 0 Issued: 3/15/2021 Fire Sprinklers: Lot Area: Zoning: Final: Valuation: $6,052.00 Occupancy Type: Construction Type: Expiration Date: 9/15/2021 Code Edition: 2018 No. Stories: 0 # of Dwelling Units: 0 Issued by: NED Scope of Work: RASMUSSEN- DECK WA State Contractor L & I #: countc1850gb City of Edmonds Business License #: 602454996-001-0001 CONTACTS NAME TYPE NAME ADDRESS I PHONE EMAIL APPLICANT KATHRYN RASMUSSEN 9914 242ND PL SW, EDMONDS (206)359-2023 ONLINE@KATWORKS.COM WA 98020 CONTACT KAT RASMUSSEN 9914 242ND PL SW, EDMONDS (206)359-2023 online@katworks.com WA 98020 CONTRACTOR COUNTRY CARPENTER LLC 2929 LARCH WAY, LYNNWOOD (425)744-4554 ronniecearley@comcast.net WA 98036 JOHN K & KATHRYN G 9914 242ND PL SW, EDMONDS OWNER RASMUSSEN WA 98020 •' ' • DESCRIPTION ACCOUNT AMOUNT PAID PAID DATE RECEIPT # CITY TECHNOLOGY FEE CHARGED 001.000.321.99.100.00 $40.00 $40.00 3/4/21 R10861 PER PERMIT PERMIT FEE - RESIDENTIAL 001.000.322.10.000.00 $245.00 $245.00 3/15/21 R11057 PLAN REVIEW FEE - RESIDENTIAL 001.000.345.83.000.00 $208.25 $208.25 3/4/21 R10861 RESIDENTIAL STATE SURCHARGE 001.000.237.150 $6.50 $6.50 3/15/21 R11057 TOTALS: $499.75 $499.75 CONDITION TYPE STATUS NOTES Printed: Monday, March 15, 2021 8:37:29 AM 1 of 2 'SIDENTIAL BLDG Permit PERMIT NUM 17 of Edmonds 121 5th EdmondsCity Ave N, 98020 1 1 -. •. • A, 1- HOLD HARMLESS - Applicant on behalf of his or her spouse heirs assigns and successors in interests, agrees to indemnify defend and hold harmless the City of Edmonds, Washington, its officials, employees, and agents from any and all claims for damages of whatever nature, arising directly or indirectly from the issuance of this permit. Issuance of this permit shall not be deemed to modify, waive or reduce any requirements of any City ordinance nor limit in any way the City's ability to enforce any ordinance provision. 2 - PERMIT DISCLOSURE - Any request for alternate design, modification, variance or other administrative deviation from adopted codes ordinances or policies must be specifically requested in writing and be called out and identified. Processing fees for such requests shall be established by Council and shall be paid upon submittal and are nonrefundable. 3- SOUND OR NOISE - Sound/Noise originating from temporary construction sites as a ALL BUILDING PERMITS FOR result of construction activity are exempt from the noise limits of ECC Chapter 5.30 only INFORMATION during the hours of 7:00am to 6:00pm on weekdays and 10:00am to 6:00pm on Saturdays, excluding Sundays and Federal Holidays. At all other times the noise originating from construction sites/activities must comply with the noise limits of Chapter 5.30, unless a variance has been granted pursuant to ECC 5.30.120. 4 - OCCUPANCY - Final approval on a project or final occupancy approval must be granted by the Building Official prior to use or occupancy of the building or structure. Check the job card for all required City inspections including final project approval and final occupancy inspections. 5 - PLUMBING - Plumbing contractor license laws are regulated by Chapter 18.106 RCW. Property owners who hire an unlicensed plumber may assume the risks and potential monetary liability for work performed by unlicensed plumbing contractors. For more information contact L&I Department of Licensing at 1-800-647-0982. Installation, use and maintenance of equipment and components shall be per MANUFACTURER SPECS FOR manufacturers specifications, installation instructions, and applicable state codes. INFORMATION Provide manufactures installation instructions on site for Building Inspector. INSPECTIONS - Schedule Online at: https://Inspection.MyBuildingPermit.com COMPLETED RESULT SEQID INSPECTION TYPE INSPECTOR NOTES DATE A-1 BUILDING PRECON B-2 FOOTINGS B-4 FRAMING B-7 BUILDING OTHER INSP X-3 BUILDING FINAL" Printed: Monday, March 15, 2021 8:37:29 AM 2 of 2