Loading...
Building Permit•M MERCIAL BLDG Permit PERMIT NUM of Edmonds EdmondsCity 980201 1 • www.edmondswa.gov Type: COMMERCIAL BLDG Owner/ Business: CHERMAK CONSTRUCTION Status: ISSUED Subtype: CHANGE OF USE Parcel No: 00434212003800 Site Address: 115 5TH AVE S EDMONDS,WA 98020-3423 Applied: 2/24/2021 Subdivision: 004342 Lot: 0 Issued: 4/14/2021 Fire Sprinklers: Lot Area: Zoning: Final: Valuation: $18,500.00 Occupancy Type: Construction Type: Expiration Date: 4/9/2022 Code Edition: 0 No. Stories: 0 # of Dwelling Units: 0 Issued by: NED Scope of Work: JUICE N JOE - CHANGE OF USE -REMODEL PLUMB.&MECH. NOT INCL. WA State Contractor L & I #: City of Edmonds Business License #: 602454996-001-0001 CONTACTS.Ida j NAME TYPE NAME ADDRESS T PHONE EMAIL APPLICANT CHERMAK CONSTRUCTION 655 EDMONDS WAY, EDMONDS (425)776-1367 DESIGN@CHERMAK.COM WA 98020 CONTACT CHERMAK CONSTRUCTION 655 EDMONDS WAY, EDMONDS (425)776-1367 design@chermak.com WA 98020 CONTRACTOR CHERMAK CONSTRUCTION 655 EDMONDS WAY, EDMONDS (425)776-1367 design@chermak.com INC WA 98020 19328 84TH AVE W, EDMONDS OWNER DAVID DANA DRAKE WA 98026-6101 MTECHNOLOGY •' l • DESCRIPTION ACCOUNT AMOUNT PAID PAID DATE RECEIPT # CITY FEE CHARGED 001.000.321.99.100.00 $40.00 $40.00 2/24/21 R10711 PER PERMIT COMMERCIAL STATE SURCHARGE 001.000.237.150 $25.00 $25.00 4/14/21 R11660 PERMIT FEE - COMMERCIAL 001.000.322.10.000.00 $475.60 $475.60 4/14/21 R11660 PLAN REVIEW FEE - COMMERCIAL 001.000.345.83.000.00 $404.26 $404.26 2/24/21 R10711 TOTALS: $944.86 $944.86 CONDITION TYPE STATUS NOTES Printed: Wednesday, April 14, 2021 3:37:58 PM 1 of 2 • Permit PERMIT NUM City of Edmonds . •:� i 1 1 • www -. •. • JIL 1- HOLD HARMLESS - Applicant on behalf of his or her spouse heirs assigns and successors in interests, agrees to indemnify defend and hold harmless the City of Edmonds, Washington, its officials, employees, and agents from any and all claims for damages of whatever nature, arising directly or indirectly from the issuance of this permit. Issuance of this permit shall not be deemed to modify, waive or reduce any requirements of any City ordinance nor limit in any way the City's ability to enforce any ordinance provision. 2 - PERMIT DISCLOSURE - Any request for alternate design, modification, variance or other administrative deviation from adopted codes ordinances or policies must be specifically requested in writing and be called out and identified. Processing fees for such requests shall be established by Council and shall be paid upon submittal and are nonrefundable. 3- SOUND OR NOISE - Sound/Noise originating from temporary construction sites as a ALL BUILDING PERMITS FOR result of construction activity are exempt from the noise limits of ECC Chapter 5.30 only INFORMATION during the hours of 7:00am to 6:00pm on weekdays and 10:00am to 6:00pm on Saturdays, excluding Sundays and Federal Holidays. At all other times the noise originating from construction sites/activities must comply with the noise limits of Chapter 5.30, unless a variance has been granted pursuant to ECC 5.30.120. 4 - OCCUPANCY - Final approval on a project or final occupancy approval must be granted by the Building Official prior to use or occupancy of the building or structure. Check the job card for all required City inspections including final project approval and final occupancy inspections. 5 - PLUMBING - Plumbing contractor license laws are regulated by Chapter 18.106 RCW. Property owners who hire an unlicensed plumber may assume the risks and potential monetary liability for work performed by unlicensed plumbing contractors. For more information contact L&I Department of Licensing at 1-800-647-0982. ELECTRICAL PERMIT FOR Obtain Electrical Permit from State Department of Labor and Industries 425-290-1309. NFORMATION FIRE FINAL INSPECTION FOR Request final Fire Department Inspection 425-775-7720. NFORMATION Installation, use and maintenance of equipment and components shall be per MANUFACTURER SPECS FOR manufacturers specifications, installation instructions, and applicable state codes. INFORMATION provide manufactures installation instructions on site for Building Inspector. Final approval on a project or final occupancy approval must be granted by the Building OCCUPANCY FOR Official prior to use or occupancy of the building or structure. Check the job card for all INFORMATION required City inspections including final project approval and final occupancy inspections. Sound/Noise originating from temporary construction sites as a result of construction activity are exempt from the noise limits of ECC Chapter 5.30 only during the hours of FOR 7:00am to 6:00pm on weekdays and 10:00am and 6:00pm on Saturdays, excluding SOUND OR NOISE INFORMATION Sundays and Federal Holidays. At all other times the noise originating from construction sites/activities must comply with the noise limits of Chapter 5.30, unless a variance has been granted pursuant to ECC 5.30.120. • -• • • •- • C • •'- • COMPLETED RES SEQID INSPECTION TYPE INSPECTOR DATE A-1 BUILDING PRECON B-2 DEMO AMT VERIFICATION B-3 PLUMB ROUGH IN B-5 CROSS CONNECTION B-7 BUILDING OTHER INSP X-3 BUILDING FINAL" Printed: Wednesday, April 14, 2021 3:37:58 PM 2 of 2