Building Permit•M MERCIAL BLDG Permit
PERMIT NUM
of Edmonds
EdmondsCity
980201 1 •
www.edmondswa.gov
Type: COMMERCIAL BLDG Owner/ Business: CHERMAK CONSTRUCTION Status: ISSUED
Subtype: CHANGE OF USE
Parcel No: 00434212003800 Site Address: 115 5TH AVE S EDMONDS,WA 98020-3423
Applied: 2/24/2021
Subdivision: 004342 Lot: 0
Issued: 4/14/2021
Fire Sprinklers: Lot Area: Zoning:
Final:
Valuation: $18,500.00 Occupancy Type: Construction Type:
Expiration Date: 4/9/2022
Code Edition: 0 No. Stories: 0 # of Dwelling Units: 0
Issued by: NED
Scope of Work: JUICE N JOE - CHANGE OF USE -REMODEL PLUMB.&MECH. NOT INCL.
WA State Contractor L & I #: City of Edmonds Business License #: 602454996-001-0001
CONTACTS.Ida j
NAME TYPE
NAME
ADDRESS T
PHONE
EMAIL
APPLICANT
CHERMAK CONSTRUCTION
655 EDMONDS WAY, EDMONDS
(425)776-1367
DESIGN@CHERMAK.COM
WA 98020
CONTACT
CHERMAK CONSTRUCTION
655 EDMONDS WAY, EDMONDS
(425)776-1367
design@chermak.com
WA 98020
CONTRACTOR
CHERMAK CONSTRUCTION
655 EDMONDS WAY, EDMONDS
(425)776-1367
design@chermak.com
INC
WA 98020
19328 84TH AVE W, EDMONDS
OWNER
DAVID DANA DRAKE
WA 98026-6101
MTECHNOLOGY
•' l •
DESCRIPTION
ACCOUNT
AMOUNT
PAID
PAID DATE
RECEIPT #
CITY FEE CHARGED
001.000.321.99.100.00
$40.00
$40.00
2/24/21
R10711
PER PERMIT
COMMERCIAL STATE SURCHARGE
001.000.237.150
$25.00
$25.00
4/14/21
R11660
PERMIT FEE - COMMERCIAL
001.000.322.10.000.00
$475.60
$475.60
4/14/21
R11660
PLAN REVIEW FEE - COMMERCIAL
001.000.345.83.000.00
$404.26
$404.26
2/24/21
R10711
TOTALS: $944.86 $944.86
CONDITION TYPE
STATUS
NOTES
Printed: Wednesday, April 14, 2021 3:37:58 PM 1 of 2
• Permit
PERMIT NUM
City of Edmonds
. •:� i 1 1 •
www -. •. • JIL
1- HOLD HARMLESS - Applicant on behalf of his or her spouse heirs assigns and successors
in interests, agrees to indemnify defend and hold harmless the City of Edmonds,
Washington, its officials, employees, and agents from any and all claims for damages of
whatever nature, arising directly or indirectly from the issuance of this permit. Issuance
of this permit shall not be deemed to modify, waive or reduce any requirements of any
City ordinance nor limit in any way the City's ability to enforce any ordinance provision. 2
- PERMIT DISCLOSURE - Any request for alternate design, modification, variance or other
administrative deviation from adopted codes ordinances or policies must be specifically
requested in writing and be called out and identified. Processing fees for such requests
shall be established by Council and shall be paid upon submittal and are nonrefundable.
3- SOUND OR NOISE - Sound/Noise originating from temporary construction sites as a
ALL BUILDING PERMITS
FOR
result of construction activity are exempt from the noise limits of ECC Chapter 5.30 only
INFORMATION
during the hours of 7:00am to 6:00pm on weekdays and 10:00am to 6:00pm on
Saturdays, excluding Sundays and Federal Holidays. At all other times the noise
originating from construction sites/activities must comply with the noise limits of
Chapter 5.30, unless a variance has been granted pursuant to ECC 5.30.120. 4 -
OCCUPANCY - Final approval on a project or final occupancy approval must be granted by
the Building Official prior to use or occupancy of the building or structure. Check the job
card for all required City inspections including final project approval and final occupancy
inspections. 5 - PLUMBING - Plumbing contractor license laws are regulated by Chapter
18.106 RCW. Property owners who hire an unlicensed plumber may assume the risks and
potential monetary liability for work performed by unlicensed plumbing contractors. For
more information contact L&I Department of Licensing at 1-800-647-0982.
ELECTRICAL PERMIT
FOR
Obtain Electrical Permit from State Department of Labor and Industries 425-290-1309.
NFORMATION
FIRE FINAL INSPECTION
FOR
Request final Fire Department Inspection 425-775-7720.
NFORMATION
Installation, use and maintenance of equipment and components shall be per
MANUFACTURER SPECS
FOR
manufacturers specifications, installation instructions, and applicable state codes.
INFORMATION
provide manufactures installation instructions on site for Building Inspector.
Final approval on a project or final occupancy approval must be granted by the Building
OCCUPANCY
FOR
Official prior to use or occupancy of the building or structure. Check the job card for all
INFORMATION
required City inspections including final project approval and final occupancy inspections.
Sound/Noise originating from temporary construction sites as a result of construction
activity are exempt from the noise limits of ECC Chapter 5.30 only during the hours of
FOR
7:00am to 6:00pm on weekdays and 10:00am and 6:00pm on Saturdays, excluding
SOUND OR NOISE
INFORMATION
Sundays and Federal Holidays. At all other times the noise originating from construction
sites/activities must comply with the noise limits of Chapter 5.30, unless a variance has
been granted pursuant to ECC 5.30.120.
•
-• •
• •- • C • •'- •
COMPLETED RES
SEQID
INSPECTION TYPE
INSPECTOR
DATE
A-1 BUILDING PRECON
B-2 DEMO AMT
VERIFICATION
B-3 PLUMB ROUGH IN
B-5 CROSS CONNECTION
B-7 BUILDING OTHER INSP
X-3 BUILDING FINAL"
Printed: Wednesday, April 14, 2021 3:37:58 PM 2 of 2