Tekline Roofing Agreement
Estimate prepared for Linda Kim:
Estimate for removal and disposal of existing
21521 73rd pl W
roof and installation of complete Tekline
Roofing system.
Edmonds, WA 9$026
Circle the
eri
PO Membrane 60 mil 20 year material warranty, low -slope $100,844.31
roofin s ste
PVC Membrane 60 mil 20 year material warranty, low -slope $107,429.65
roofing system.
Product Color Chosen
Cap Metal Color Chosen (�
Terms and Conditions
• Tax is not included. Standard tax rates apply.
• Prices reflected in this agreement are guaranteed for 15 days from date of agreement.
• 10% deposit will be collected upon signing. 40°% on the first day of project. balance will be collected on the day of completion. Payments
not received within fifteen (10) days of completion will be subject to a five hundred dollar ($500) late charge and the unpaid amount and late
charge will begin to accrue interest at ten percent (10%) per annum. If any party institutes suit against the other concerning this Agreement.
or the work under it. the prevailing party shall be entitled to reasonable attorneys' fees and expenses.
• Tekline Roofing does not guarantee to eliminate all ponding water from roof.
• If a re -roof permit is obtained by Tekline roofing, homeowner will be responsible for permit costs.
• Tekline Roofing is not responsible for nails, screws. staples or any fasteners which penetrate through underside of roof deck. This includes
but is not limited to soffits, eaves and attic.
• Charges may apply for any additional layers of roofing found which are not included in this agreement.
• Tekline Roofing is not responsible for cracks in driveway resulting from delivery of material and/or delivery and pick up of dumpster.
• Tekline Roofing is not responsible for cracks. splits and/or paint chips to siding resulting from removal of existing (lashings or installation
of new flashings. Damage caused by Tekline's negligence would be evaluated and repaired by Tekllne.
• Tekline Roofing is not responsible for damages to interior and/or exterior of building resulting from regular roofing activities or stress of
rooting project.
• Tekline Roofing is not responsible for any ponding water. Ponding may occur due to settling, design. or structure of building.
• Any additional work performed which is not specified in this agreement will be performed at $96 per man hour plus materials with 30%
OH&P on materials. Plywood will be replaced at $75 per sheet for 1/2' CDX. Additional roof layers found and torn off. will be billed at $.80
square foot.
Workmanship Warranty: Tekline warranties our workmanship for 20 years. This warranty is transfereable one time to your
homes ne who will be protected for up to 10 years from the date of installation.
Tekline Roofing
Signed 3
G-a(e_ 1
Print Name Date hris Hagen February 22, 2021
Page 1
Low Slope Specifications
Estimate prepared for Linda Kim: Estimate for removal and disposal of existing
21521 73rd pl W roof and installation of complete Tekline
Edmonds, WA 98026 1
Hoofing system.
Tear off/Removal: Tekline will remove and haul I layer of roofing and all existing insulation (for substrate inspection). Any additional layers of
roofing to remove will add an additional cost to the total of $0.45 per square foot.
Roof Deck Inspection: A full roof deck inspection will be performed after tear -off. Any rot or defective structure will be removed and replaced
on a time and materials basis.
Sheeting: Tekline plans to inspect all substrate for rot/water damage. See time and materials for repairs. if needed.
Ice/Water Shield: Self sealing leak barrier will be installed over entire root deck.
Underlayment: Fanfold insulation sheet will be installed over roof deck. This will add R-value. act as vapor barrier and protect roofing
membrane from being damaged.
Insulation: Tekline will supply and install new 4" polyisocanurate insulation over new ice and water shield. New insulation will be extended just
past outside heated wall (no insulation planned at exposed soffit areas, similar to current design)
Flashings: All (lashings used will be 26 gauge enamel coated flashings. The color of the flashing used will closely match the product color
chosen.
Clad metals: When appropriate. 26 gauge steel with a membrane coating will be installed.
Fasteners: Galvanized screws and plates will be used to secure roofing to roof deck.
Cap Metal: 26 gauge cap metal will be installed around perimeter of roof. Screws with grommets will be used to secure cap metal.
Attic Ventilation: No attic ventilation planned (compact roof system. no air venting)
Plumbing Vents: Replace all existing pipe flashings with new pipe boots.
Scuppers: Tekline will enlarge all scuppers/drains to 3'. New X stainless steel scuppers will be used to join roof drains and downspouts.
Scupper liners: Scupper inserts will be used over scupper liners and will be adhered to roof.
Membrane Breathers: Vents will be installed to eliminate condensation between membrane and roof deck.
Fan Vents: Replace all existing exhaust vents with new vents.
Corner pieces: Specially manufactured inside and outside corner pieces will be used on all corners.
Tekline Roofing
Print Name Date rjs Hage February 22, 2021