Building PermitDTMO Permit
PERMIT NU
City of Edmonds
:�
' 1 1
-. •.
Type: DEMO Owner/ Business: TIM THOMAS Status: ISSUED
Subtype: COM SECONDARY DEMO
Parcel No: 00566900500600 Site Address: 7315 212TH ST SW EDMONDS,WA 98026-7610
Applied: 4/16/2021
Subdivision: 005669 Lot: 0
Issued: 5/3/2021
Fire Sprinklers: Lot Area: Zoning:
Final:
Valuation: $0.00 Occupancy Type: Construction Type:
Expiration Date: 11/3/2021
Code Edition: 0 No. Stories: 0 # of Dwelling Units: 0
Issued by: WAC
Scope of Work: DEMO -INTERIOR 2 OFFICES
WA State Contractor L & I #: City of Edmonds Business License #: 602454996-001-0001
CONTACTS.Ida j
NAME TYPE
NAME
ADDRESS
PHONE
EMAIL
APPLICANT
TIM THOMAS
4220 132ND ST SE, 202, MILL
(425)417-0583
TIM.THOMAS@IRGPT.COM
CREEK WA 98012
CONTACT
IRG PHYSICAL THERAPY
4220 132ND ST SE„ MILL CREEK
(425)417-0583
tim.thomas@irgpt.com
WA 98012
CONTRACTOR
CONTRACTOR UNKNOWN
INTEGRATED
REHABILITATION GROUP-
18191 VON KARMAN AVE,
OWNER
GAHC4 EDMONDS WA MOB
IRVINE CA 92612
LLC
•' •
DESCRIPTION
ACCOUNT
AMOUNT
r PAID
PAID DATE
RECEIPT #
CITY TECHNOLOGY FEE CHARGED
001.000.321.99.100.00
$40.00 $40.00
4/16/21
R11751
PER PERMIT
COMMERCIAL STATE SURCHARGE
001.000.237.150
$25.00 $25.00
4/16/21
R11751
DEMO - INTERIOR OR SECONDARY
001.000.322.10.000.00
$150.00 $150.00
4/16/21
R11751
STRUCTURE
TOTALS: $215.00 $215.00
CONDITIONS
CONDITION TYPE STATUS NOTES
Printed: Monday, May 03, 2021 8:37:27 AM 1 of 2
DTMO Permit
PERMIT NU
of Edmonds
I
EdmondsCity
•:0BLD2021-0558,
www.edmondswa.gov
•
1- HOLD HARMLESS - Applicant on behalf of his or her spouse heirs assigns and successors
in interests, agrees to indemnify defend and hold harmless the City of Edmonds,
Washington, its officials, employees, and agents from any and all claims for damages of
whatever nature, arising directly or indirectly from the issuance of this permit. Issuance
of this permit shall not be deemed to modify, waive or reduce any requirements of any
City ordinance nor limit in any way the City's ability to enforce any ordinance provision. 2
- PERMIT DISCLOSURE - Any request for alternate design, modification, variance or other
administrative deviation from adopted codes ordinances or policies must be specifically
requested in writing and be called out and identified. Processing fees for such requests
shall be established by Council and shall be paid upon submittal and are nonrefundable.
3- SOUND OR NOISE - Sound/Noise originating from temporary construction sites as a
ALL BUILDING PERMITS
FOR
result of construction activity are exempt from the noise limits of ECC Chapter 5.30 only
INFORMATION
during the hours of 7:00am to 6:00pm on weekdays and 10:00am to 6:00pm on
Saturdays, excluding Sundays and Federal Holidays. At all other times the noise
originating from construction sites/activities must comply with the noise limits of
Chapter 5.30, unless a variance has been granted pursuant to ECC 5.30.120. 4 -
OCCUPANCY - Final approval on a project or final occupancy approval must be granted by
the Building Official prior to use or occupancy of the building or structure. Check the job
card for all required City inspections including final project approval and final occupancy
inspections. 5 - PLUMBING - Plumbing contractor license laws are regulated by Chapter
18.106 RCW. Property owners who hire an unlicensed plumber may assume the risks and
potential monetary liability for work performed by unlicensed plumbing contractors. For
more information contact L&I Department of Licensing at 1-800-647-0982.
Nothing in this permit approval process shall be interpreted as allowing or permitting the
maintenance of any currently existing illegal, nonconforming or unpermitted building,
FOR
structure or site condition which is outside the scope of the permit application, regardless
NONCONFORMING DISCLAIMER
INFORMATION
of whether such building, structure or condition is shown on the site plan or drawing.
Such building, structure or condition may be the subject of a separate enforcement
action.
COMPLETED RESULT WN70TES
SEQID INSPECTION TYPE INSPECTOR
DATE
X-3 BUILDING FINAL**
Printed: Monday, May 03, 2021 8:37:27 AM 2 of 2