Loading...
Water Availability Certification - 471 Admiral WayWATER AVAILABILITY CERTIFICATE Inc. i Rq0 PERMITTING & DEVELOPMENT ENGINEERING DIVISION 3.21 5th Avenue N P: 42S.77i.0220 www.edmondswa.aov ITEMS IN THIS BOX TO BE FILLED IN BY APPLICANT ® Building Permit ❑ Preliminary Plat or PUD ❑ Subdivision ❑ Rezone or Other Applicant's name: Jackson Main Architecture — Meghan Craig Proposed Use: Port of Edmonds Administration Building Location (attach map and legal description if necessary): 47i Admiral Way Updated on 811412018 Page I of 2 ITEMS IN THIS BOX TO BE FILLED IN BY EDMONDS DEVELOPMENT SERVICES DEPARTMENT Permit Number Project Name PLN2021-0012 Port of Edmonds Administration Building 1. N a. Water will be provided by service connection only to an existing 8-inch (size) water main that is adjacent to the site. OR ❑ b. Water service will require an improvement to the water system of: ❑ (1). feet of water main to reach the site; and/or ❑ (z). The construction of a distribution system on the site; and/or ❑ (-4). Other (describe): z. N a. The water system is in conformance with a City approved water comprehensive plan. OR ❑ b. The water system improvement will require a water comprehensive plan amendment. (This will cause a delay in permit issuance and approval.) I N a. The proposed project is within the corporate limits of the City, or has been granted Boundary Review board approval for extension of service outside the City, or is within the City approved service area of a private water purveyor. OR ❑ b. Annexation or Boundary Review Board approval will be necessary to provide service. ............... 4. Z a Water-is/or will be available at the rate of flow and duration indicated below at no less than 20 psi Measured at the nearest fire hydrant 6o feet from the building/property (or as marked on attached map) Rate of Flow Duration ❑ Lessthan Soo gpm. (approximately gpm) ❑ Less than one (i) hour ❑ 500 to 999 gpm ❑ One (1) to two (2) hours ❑ i5oo gpm or more N Two (2) hours or more ❑ Flow test of gpm ❑ Other N Calculation of 56o5 gpm (Commercial building permits require flow test or calculation) OR ❑ b. Water will system is not capable of providing fire flow. WATER AGENCY CERTIFICATION COMMENTS/CONDITIONS: Per model Static Pressure is i 0.20 Psi at i000 qpm, residual pressure is 12Psi at max flow Of 2185 qpm, residual pressure is 3.o6 psi I hereby certify that the above water purveyor information is true. This certification shall be valid for one year from date of signature. City of Edmonds Russell Lynch (Agency Name) Signatory Printed me Associate En ineer (Title) (Signature/Date) Updated on 811412018 Page 2 of 2