Loading...
Water Availability Certification - 614 5th Ave`y OF F;Y 0� Un WATER AVAILABILITY CERTIFICATE tkcjv 4C. IS PERMITTING & DEVELOPMENI ENGINEERING DIVISION 123.5th Avenue N P: 425.771.0220 www.edmondswa.aov ITEMS IN THIS BOX TO BE FILLED IN BY APPLICANT ® Building Permit ❑ Preliminary Plat or PUD ❑ Subdivision ❑ Rezone or Other Applicant's name: Citizen Design Proposed Use: Six live/work townhouses and eight residential townhouses Location (attach map and legal description if necessary): 614 51h Ave Updated on 811412018 Page I or2 ITEMS IN THIS BOX TO BE FILLED IN BY EDMONDS DEVELOPMENT SERVICES DEPARTMENT Permit Number Project Name PLN2020-0053 Pine Park 614 INFORMATION PROVIDED BY WATER AGENCY 1. X a. Water will be provided by service connection only to an existing 8-inch (size) water main that is adjacent to the site. OR ❑ b. Water service will require an improvement to the water system of: ❑ (i). feet of water main to reach the site; and/or ❑ (2). The construction of a distribution system on the site; and/or ❑ (3). Other (describe): 2. X a. The water system is in conformance with a City approved water comprehensive plan. OR ❑ b. The water system improvement will require a water comprehensive plan amendment. (This will cause a delay in permit issuance and approval.) 3. X a. The proposed project is within the corporate limits of the City, or has been granted Boundary Review board approval for extension of service outside the City, or is within the City approved service area of a private water purveyor. OR ❑ b. Annexation or Boundary Review Board approval will be necessary to provide service. q. X a. Water is/or will be available at the rate of flow and duration indicated below at no less than 20 psi Measured at the nearest fire hydrant 188 feet from the building/property (or as marked on attached map) Rate of Flow Duration ❑ Less than Soo gpm. (approximately gpm) ❑ Less than one (i) hour ❑ 5oo to 999 gpm ❑ One (1) to two (2) hours ❑ i5oo gpm or more X Two (2) hours or more ❑ Flow test of gpm ❑ Other X Calculation of 2831 gpm (Commercial building permits require flow test or calculation) OR ❑ b. Water will system is not capable of providing fire flow. WATER AGENCY CERTIFICATION COMMENTS/CONDITIONS: Per model Static Pressure is qq.og psi at 3.000 qpm, residual pressure is q7.3.o psi at max flow of 2833. gpm, residual pressure is 80.37 psi I hereby certify that the above water purveyor information is true. This certification shall be valid for one year from date of signature. City of Edmonds Russell Lynch (Agency Name) Signatory Printed Name Associate Engineer oc (Title) (Signature/Date) Updated on 811412018 Page 2 of 2