APPROVED Bond Quantity Worksheet PLN2020-0009Site Improvement Bond Quantity WorksheetS15 Web date: 04/03/2015 Department of Permitting & Environmental Review35030 SE Douglas Street, Suite 210Snoqualmie, Washington 98065-9266206-296-6600 TTY Relay 711Project Name: Date: Location: Project No.: Activity No.: Note: All prices include labor, equipment, materials, overhead and Clearing greater than or equal to 5,000 board feet of timber? profit. Prices are from RS Means data adjusted for the Seattle area or from local sources if not included in the RS Means database._____________yesXno If yes, Forest Practice Permit Number: (RCW 76.09)Page 1 of 9Select Homes 8805 220th 3-Lot SP8805 220th St SWFor alternate formats, call 206-296-6600. __________________12/14/2020PLN 2020 000919-026 8805 220th St SW SP - Bond Quantity Worksheet 2020-12-14.xlsxUnit prices updated: 3/2/2015 Version: 3/2/2015Report Date: 12/14/2020
Site Improvement Bond Quantity WorksheetS15 Web date: 04/03/2015 Unit# ofReference #PriceUnitQuantity ApplicationsCostEROSION/SEDIMENT CONTROLNumberBackfill & compaction-embankmentESC-16.00$ CYCheck dams, 4" minus rockESC-2SWDM 5.4.6.3 80.00$ EachCrushed surfacing 1 1/4" minusESC-3WSDOT 9-03.9(3) 95.00$ CYDitchingESC-49.00$ CYExcavation-bulkESC-52.00$ CYFence, siltESC-6SWDM 5.4.3.1 1.50$ LF 65 198Fence, Temporary (NGPE)ESC-71.50$ LFHydroseedingESC-8SWDM 5.4.2.4 0.80$ SY 1000 1800Jute MeshESC-9SWDM 5.4.2.2 3.50$ SYMulch, by hand, straw, 3" deepESC-10SWDM 5.4.2.1 2.50$ SYMulch, by machine, straw, 2" deepESC-11SWDM 5.4.2.1 2.00$ SYPiping, temporary, CPP, 6"ESC-1212.00$ LFPiping, temporary, CPP, 8"ESC-1314.00$ LFPiping, temporary, CPP, 12"ESC-1418.00$ LFPlastic covering, 6mm thick, sandbaggedESC-15SWDM 5.4.2.3 4.00$ SY 200 1800Rip Rap, machine placed; slopesESC-16WSDOT 9-13.1(2) 45.00$ CYRock Construction Entrance, 50'x15'x1'ESC-17SWDM 5.4.4.1 1,800.00$ Each 1 11800Rock Construction Entrance, 100'x15'x1'ESC-18SWDM 5.4.4.1 3,200.00$ EachSediment pond riser assemblyESC-19SWDM 5.4.5.2 2,200.00$ EachSediment trap, 5' high berm ESC-20SWDM 5.4.5.1 19.00$ LFSed. trap, 5' high, riprapped spillway berm section ESC-21SWDM 5.4.5.1 70.00$ LFSeeding, by handESC-22SWDM 5.4.2.4 1.00$ SYSodding, 1" deep, level groundESC-23SWDM 5.4.2.5 8.00$ SYSodding, 1" deep, sloped groundESC-24SWDM 5.4.2.5 10.00$ SYTESC SupervisorESC-25110.00$ HR 40 14400Water truck, dust controlESC-26SWDM 5.4.7 140.00$ HRWRITE-IN-ITEMS **** (see page 9)150.00$ Each 9 11350ESC SUBTOTAL:9,247.50$ 30% CONTINGENCY & MOBILIZATION:2,774.25$ ESC TOTAL:12,021.75$ COLUMN:APage 2 of 9Catchbasin Protection19-026 8805 220th St SW SP - Bond Quantity Worksheet 2020-12-14.xlsxUnit prices updated: 3/2/2015 Version: 3/2/2015Report Date: 12/14/2020
Site Improvement Bond Quantity WorksheetWeb date: 04/03/2015Existing Future Public PrivateRight-of-Way Right of Way ImprovementsUnit Price Unit Quant. Cost Quant. Cost Quant. CostGENERAL ITEMSNo.Backfill & Compaction- embankment GI - 1 6.00$ CY 20 120.00580 3,480.00Backfill & Compaction- trench GI - 2 9.00$ CYClear/Remove Brush, by hand GI - 3 1.00$ SYClearing/Grubbing/Tree Removal GI - 4 10,000.00$ Acre0.4 4,000.00Excavation - bulk GI - 5 2.00$ CY 20 40.00580 1,160.00Excavation - Trench GI - 6 5.00$ CYFencing, cedar, 6' high GI - 7 20.00$ LFFencing, chain link, vinyl coated, 6' high GI - 8 20.00$ LFFencing, chain link, gate, vinyl coated, 20' GI - 9 1,400.00$ EachFencing, split rail, 3' high GI - 10 15.00$ LFFill & compact - common barrow GI - 11 25.00$ CYFill & compact - gravel base GI - 12 27.00$ CYFill & compact - screened topsoil GI - 13 39.00$ CYGabion, 12" deep, stone filled mesh GI - 14 65.00$ SYGabion, 18" deep, stone filled mesh GI - 15 90.00$ SYGabion, 36" deep, stone filled mesh GI - 16 150.00$ SYGrading, fine, by hand GI - 17 2.50$ SYGrading, fine, with grader GI - 18 2.00$ SYMonuments, 3' long GI - 19 250.00$ EachSensitive Areas Sign GI - 20 7.00$ EachSodding, 1" deep, sloped ground GI - 21 8.00$ SYSurveying, line & grade GI - 22 850.00$ DaySurveying, lot location/lines GI - 23 1,800.00$ AcreTraffic control crew ( 2 flaggers ) GI - 24 120.00$ HRTrail, 4" chipped wood GI - 25 8.00$ SYTrail, 4" crushed cinder GI - 26 9.00$ SYTrail, 4" top course GI - 27 12.00$ SYWall, retaining, concrete GI - 28 55.00$ SFWall, rockery GI - 29 15.00$ SFPage 3 of 9SUBTOTAL160.008,640.00 & Drainage Facilities*KCC 27A authorizes only one bond reduction.19-026 8805 220th St SW SP - Bond Quantity Worksheet 2020-12-14.xlsxUnit prices updated: 03/02/2015Version: 03/02/2015Report Date: 12/14/2020
Site Improvement Bond Quantity WorksheetWeb date: 04/03/2015Existing Future PublicRight-of-way Right of Way ImprovementsUnit Price Unit Quant. Cost Quant. Cost Quant. CostROAD IMPROVEMENTNo.AC Grinding, 4' wide machine < 1000sy RI - 1 30.00$ SYAC Grinding, 4' wide machine 1000-2000syRI - 2 16.00$ SYAC Grinding, 4' wide machine > 2000sy RI - 3 10.00$ SYAC Removal/Disposal RI - 4 35.00$ SY 40 1,400.00480 16,800.00Barricade, type III ( Permanent ) RI - 6 56.00$ LFCurb & Gutter, rolled RI - 7 17.00$ LFCurb & Gutter, vertical RI - 8 12.50$ LF 122 1,525.00Curb and Gutter, demolition and disposal RI - 9 18.00$ LF 122 2,196.00Curb, extruded asphalt RI - 10 5.50$ LFCurb, extruded concrete RI - 11 7.00$ LFSawcut, asphalt, 3" depth RI - 12 1.85$ LF 106 196.10Sawcut, concrete, per 1" depth RI - 13 3.00$ LFSealant, asphalt RI - 14 2.00$ LF 106 212.00Shoulder, AC, ( see AC road unit price ) RI - 15 -$ SYShoulder, gravel, 4" thick RI - 16 15.00$ SYSidewalk, 4" thick RI - 17 38.00$ SYSidewalk, 4" thick, demolition and disposalRI - 18 32.00$ SYSidewalk, 5" thick RI - 19 41.00$ SY 94 3,854.00Sidewalk, 5" thick, demolition and disposalRI - 20 40.00$ SYSign, handicap RI - 21 85.00$ EachStriping, per stall RI - 22 7.00$ EachStriping, thermoplastic, ( for crosswalk ) RI - 23 3.00$ SFStriping, 4" reflectorized line RI - 24 0.50$ LFPage 4 of 9SUBTOTAL 9,383.1016,800.00Private & Drainage Facilities*KCC 27A authorizes only one bond reduction.19-026 8805 220th St SW SP - Bond Quantity Worksheet 2020-12-14.xlsxUnit prices updated: 03/02/2015Version: 03/02/2015Report Date: 12/14/2020
Site Improvement Bond Quantity WorksheetWeb date: 04/03/2015Existing Future Public PrivateRight-of-way Right of Way ImprovementsUnit Price Unit Quant. Cost Quant. Cost Quant. CostROAD SURFACING No. (4" Rock = 2.5 base & 1.5" top course) 9 1/2" Rock= 8" base & 1.5" top course)Additional 2.5" Crushed Surfacing RS - 1 3.60$ SYHMA 1/2" Overlay, 1.5" RS - 2 14.00$ SY 22 308.00HMA 1/2" Overlay 2" RS - 3 18.00$ SYHMA Road, 2", 4" rock, First 2500 SY RS - 4 28.00$ SYHMA Road, 2", 4" rock, Qty. over 2500 SYRS - 5 21.00$ SYHMA Road, 3", 9 1/2" Rock, First 2500 SYRS - 6 35.00$ SY 220 7,700.00400 14,000.00HMA Road, 3", 9 1/2" Rock, Qty Over 2500 SYRS - 7 42.00$ SYNot Used RS - 8Not Used RS - 9HMA Road, 6" Depth, First 2500 SY RS - 10 33.10$ SYHMA Road, 6" Depth, Qty. Over 2500 SY RS - 11 30.00$ SYHMA 3/4" or 1", 4" Depth RS - 12 20.00$ SYGravel Road, 4" rock, First 2500 SY RS - 13 15.00$ SYGravel Road, 4" rock, Qty. over 2500 SY RS - 14 10.00$ SYPCC Road (Add Under Write-Ins w/Design) RS - 15Thickened Edge RS - 17 8.60$ LFPage 5 of 9SUBTOTAL 8,008.0014,000.00 & Drainage Facilities*KCC 27A authorizes only one bond reduction.19-026 8805 220th St SW SP - Bond Quantity Worksheet 2020-12-14.xlsxUnit prices updated: 03/02/2015Version: 03/02/2015Report Date: 12/14/2020
Site Improvement Bond Quantity WorksheetWeb date: 04/03/2015Existing Future Public PrivateRight-of-way Right of Way ImprovementsUnit Price Unit Quant. Cost Quant. Cost Quant. CostDRAINAGE (CPP = Corrugated Plastic Pipe, N12 or Equivalent)Access Road, R/D D - 1 21.00$ SYBollards - fixed D - 2 240.74$ EachBollards - removable D - 3 452.34$ Each* (CBs include frame and lid)CB Type I D - 4 1,500.00$ Each 1 1,500.001 1,500.00CB Type IL D - 5 1,750.00$ EachCB Type II, 48" diameter D - 6 2,300.00$ Each for additional depth over 4' D - 7 480.00$ FTCB Type II, 54" diameter D - 8 2,500.00$ Each1 2,500.00 for additional depth over 4' D - 9 495.00$ FT12 5,940.00CB Type II, 60" diameter D - 10 2,800.00$ Each for additional depth over 4' D - 11 600.00$ FTCB Type II, 72" diameter D - 12 3,600.00$ Each for additional depth over 4' D - 13 850.00$ FTThrough-curb Inlet Framework (Add) D - 14 400.00$ EachCleanout, PVC, 4" D - 15 150.00$ EachCleanout, PVC, 6" D - 16 170.00$ Each3 510.00Cleanout, PVC, 8" D - 17 200.00$ EachCulvert, PVC, 4" D - 18 10.00$ LFCulvert, PVC, 6" D - 19 13.00$ LF130 1,690.00Culvert, PVC, 8" D - 20 15.00$ LF 36 540.0038 570.00Culvert, PVC, 12" D - 21 23.00$ LF24 552.00Culvert, CMP, 8" D - 22 19.00$ LFCulvert, CMP, 12" D - 23 29.00$ LFCulvert, CMP, 15" D - 24 35.00$ LFCulvert, CMP, 18" D - 25 41.00$ LFCulvert, CMP, 24" D - 26 56.00$ LFCulvert, CMP, 30" D - 27 78.00$ LFCulvert, CMP, 36" D - 28 130.00$ LFCulvert, CMP, 48" D - 29 190.00$ LFCulvert, CMP, 60" D - 30 270.00$ LFCulvert, CMP, 72" D - 31 350.00$ LFPage 6 of 9SUBTOTAL 2,040.0013,262.00 & Drainage Facilities For Culvert prices, Average of 4' cover was assumed. Assume perforated PVC is same price as solid pipe.*KCC 27A authorizes only one bond reduction.19-026 8805 220th St SW SP - Bond Quantity Worksheet 2020-12-14.xlsxUnit prices updated: 03/02/2015Version: 03/02/2015Report Date: 12/14/2020
Site Improvement Bond Quantity WorksheetWeb date: 04/03/2015Existing Future Public PrivateRight-of-way Right of Way ImprovementsDRAINAGE CONTINUEDNo. Unit Price Unit Quant. Cost Quant. Cost Quant. CostCulvert, Concrete, 8" D - 32 25.00$ LFCulvert, Concrete, 12" D - 33 36.00$ LFCulvert, Concrete, 15" D - 34 42.00$ LFCulvert, Concrete, 18" D - 35 48.00$ LFCulvert, Concrete, 24" D - 36 78.00$ LFCulvert, Concrete, 30" D - 37 125.00$ LFCulvert, Concrete, 36" D - 38 150.00$ LFCulvert, Concrete, 42" D - 39 175.00$ LFCulvert, Concrete, 48" D - 40 205.00$ LFCulvert, CPP, 6" D - 41 14.00$ LFCulvert, CPP, 8" D - 42 16.00$ LFCulvert, CPP, 12" D - 43 24.00$ LFCulvert, CPP, 15" D - 44 35.00$ LFCulvert, CPP, 18" D - 45 41.00$ LFCulvert, CPP, 24" D - 46 56.00$ LFCulvert, CPP, 30" D - 47 78.00$ LFCulvert, CPP, 36" D - 48 130.00$ LFDitching D - 49 9.50$ CYFlow Dispersal Trench (1,436 base+) D - 50 28.00$ LFFrench Drain (3' depth) D - 51 26.00$ LFGeotextile, laid in trench, polypropylene D - 52 3.00$ SYMid-tank Access Riser, 48" dia, 6' deep D - 54 2,000.00$ EachPond Overflow Spillway D - 55 16.00$ SYRestrictor/Oil Separator, 12" D - 56 1,150.00$ Each1 1150Restrictor/Oil Separator, 15" D - 57 1,350.00$ EachRestrictor/Oil Separator, 18" D - 58 1,700.00$ EachRiprap, placed D - 59 42.00$ CYTank End Reducer (36" diameter) D - 60 1,200.00$ EachTrash Rack, 12" D - 61 350.00$ EachTrash Rack, 15" D - 62 410.00$ EachTrash Rack, 18" D - 63 480.00$ EachTrash Rack, 21" D - 64 550.00$ EachPage 7 of 9SUBTOTAL1150 & Drainage Facilities*KCC 27A authorizes only one bond reduction.19-026 8805 220th St SW SP - Bond Quantity Worksheet 2020-12-14.xlsxUnit prices updated: 03/02/2015Version: 03/02/2015Report Date: 12/14/2020
Site Improvement Bond Quantity WorksheetWeb date: 04/03/2015Existing Future Public PrivateRight-of-way Right of Way ImprovementsUnit Price Unit Quant. Price Quant. Cost Quant. CostPARKING LOT SURFACINGNo.2" AC, 2" top course rock & 4" borrow PL - 1 21.00$ SY NA NA2" AC, 1.5" top course & 2.5" base coursePL - 2 28.00$ SY NA NA4" select borrow PL - 3 5.00$ SY NA NA1.5" top course rock & 2.5" base course PL - 4 14.00$ SY NA NAUTILITY POLES & STREET LIGHTINGUtility pole relocation costs must be accompanied by Franchise Utility's Cost EstimateUtility Pole(s) Relocation UP-1Street Light Poles w/Luminaires UP-2 8,000.00$ EachWRITE-IN-ITEMS(Such as detention/water quality vaults.)No.Traffic Control WI - 1 2,200.00$ Lump 1 2200Water Service WI - 2 1,200.00$ Ea. 3 36001-1/2" Water Service Line WI - 3 9.00$ LF380 3,420.00Sewer- 6" Cleanout WI - 4 170.00$ Ea. 1 1703 510.00Sewer- 6" PVC WI - 5 25.00$ LF235 5,875.00Stormwater Filter Catch Basin WI - 6 8,000.00$ Lump1 8,000.006" Dutile Iron Pipe WI - 7 40.00$ LF40 1,600.00Detention Tank System with Risers WI - 8 48,000.00$ LS1 48,000.00Street Tree with Grate WI - 9 600.00$ Ea. 1 600WI - 10SUBTOTAL 6,570.0067,405.00SUBTOTAL (SUM ALL PAGES):26,161.10121,257.0030% CONTINGENCY & MOBILIZATION:7,848.3336,377.10 GRANDTOTAL: 34,009.43157,634.10COLUMN: B C DPage 8 of 9Lump Sum & Drainage FacilitiesNot To Be Used For Roads Or Shoulders*KCC 27A authorizes only one bond reduction.19-026 8805 220th St SW SP - Bond Quantity Worksheet 2020-12-14.xlsxUnit prices updated: 03/02/2015Version: 03/02/2015Report Date: 12/14/2020
Site Improvement Bond Quantity WorksheetWeb date: 04/03/2015Original bond computations prepared by:Name:Date:PE Registration Number:Tel. #:Firm Name:Address:Project No: Stabilization/Erosion Sediment Control (ESC) (A)Existing Right-of-Way Improvements (B)Future Public Right of Way & Drainage Facilities (C)Private Improvements (D)Calculated Quantity CompletedTotal Right-of Way and/or Site Restoration Bond*/** (A+B)(First $7,500 of bond* shall be cash.)Performance Bond* Amount (A+B+C+D) = TOTAL (T)T x 0.30Minimum is $2000. Minimum is $2000.Maintenance/Defect Bond* TotalMinimum is $2000.NAME OF PERSON PREPARING BOND* REDUCTION:Date:* NOTE:The word "bond" as used in this document means a financial guarantee acceptable to King County.** NOTE: KCC 27A authorizes right of way and site restoration bonds to be combined when both are required. The restoration requirement shall include the total cost for all TESC as a minimum, not a maximum. In addition, corrective work, both on- and off-site needs to be included. Quantities shall reflect worse case scenarios not just minimum requirements. For example, if a salmonid stream may be damaged, some estimated costs for restoration needs to be reflected in this amount. The 30% contingency and mobilization costs are computed in this quantity.*** NOTE: Per KCC 27A, total bond amounts remaining after reduction shall not be less than 30% of the original amount (T) or as revised by major design changes.REQUIRED BOND* AMOUNTS ARE SUBJECT TO REVIEW AND MODIFICATION BY KING COUNTY12/14/2020(425) 678-6960 FINANCIAL GUARANTEE REQUIREMENTSPUBLIC ROAD & DRAINAGE MAINTENANCE/DEFECT BOND*Rob Long, PERAM Engineering, Inc.16531 13th Ave W, Suite A108 Lynnwood WA 98037PERFORMANCE BOND*AMOUNT36508MINIMUM BOND* AMOUNT REQUIRED FOR RECORDING ORTEMPORARY OCCUPANCY AT SUBSTANTIAL COMPLETION ***12/14/2020PLN 2020 00098,502.4$ Rob Long, PE12,021.8$ 34,009.4$ -$ 61,099.6$ (B+C) x 0.25 =46,031.2$ 157,634.1$ 203,665.3$ Page 9 of 919-026 8805 220th St SW SP - Bond Quantity Worksheet 2020-12-14.xlsxCheck out the DDES Web site at www.kingcounty.gov/permitsUnit prices updated: 03/02/2015Version: 03/02/2015Report Date: 12/14/2020