Loading...
Building Permit 2020PermitISCELLANEOUS PERMIT NUM of Edmonds EdmondsCity 98020BLD2020-13511 www.edmondswa.gov Type: MISCELLANEOUS Owner/ Business: PEDRO GERMANO Status: ISSUED Subtype: NON STANDARD PERMIT Parcel No: 00434401300101 Site Address: 101 MAIN ST EDMONII 98020-3131 Applied: 12/9/2020 Subdivision: 004344 Lot: 0 Issued: 12/15/2020 Fire Sprinklers: Lot Area: Zoning: BD2 Final: Valuation: $0.00 Occupancy Type: Construction Type: Expiration Date: 2/15/2021 Code Edition: 0 No. Stories: 0 # of Dwelling Units: 0 Issued by: NED Scope of Work: DEMETRIS- (3)TEMP TENTS OVER PART OF DECK- 2 mo permit WA State Contractor L & I #: City of Edmonds Business License #: 602454996-001-0001 CONTACTS NAME TYPE NAME ADDRESS PHONE EMAIL APPLICANT PEDRO GERMANO 101 MAIN STREET, EDMONDS (206)739-4279 PEDRO@KAFENEO.NET WA 98020 CONTACT DEMETRIS WOODSTONE 101 MAIN STREET, EDMONDS (206)739-4279 pedro@kafeneo.net TAVERNA WA 98020 CONTRACTOR CONTRACTOR UNKNOWN OWNER PEDRO GERMANO 101 MAIN STREET, EDMONDS (206)739-4279 WA 98020 FEE INFORMATION DESCRIPTION ACCOUNT AMOUNT PAID PAID DATE RECEIPT# BUILDING - ADDITIONAL REVIEW 001.000.345.83.000.00 $220.00 $220.00 12/14/20 R9085 HOURS CITY TECHNOLOGY FEE CHARGED 001.000.321.99.100.00 $40.00 $40.00 12/14/20 R9085 PER PERMIT ENGINEERING REVIEW FEE 001.000.341.82.000.00 $55.00 $55.00 12/14/20 R9085 FIRE - PLAN REVIEW HOURS 001.000.345.83.100.00 $110.00 $110.00 12/14/20 R9085 PLANNING FEE NOT CATEGORIZED 001.000.345.81.000.00 $55.00 $55.00 12/14/20 R9085 TOTALS: $480.00 $480.00 CONDITION TYPE STATUS NOTES Installation, use and maintenance of equipment and components shall be per EQUIPMENT USAGE FOR manufacturer's specifications, installation instructions, and applicable state codes. INFORMATION provide manufacture's installation instructions on site for Building Inspector. FIRE EXTINGUISHERS O Provide 2A 106C portable fire extinguishers at locations noted on approved plans. ORMATION Final approval on a project or final occupancy approval must be granted by the Building OCCUPANCY FOR Official prior to use or occupancy of the building or structure. Check the job card for all INFORMATION required City inspections including final project approval and final occupancy inspections. Printed: Tuesday, December 15, 2020 7:00:59 AM 1 of 2 PermitISCELLANEOUS NUM PERMITP70M'121 City • • • • 5th Ave N, Edmonds WA 98020 1 1 www.edmondswa.gov TENT PERMIT CONDITIONS 1. Occupant load shall comply with state regulations. 2. Tent structure is not to be occupied during heavy snow events. 3. Tent structure is not to be occupied during high wind events. 4. This permit is temporary and tent structure must be removed no later than 60 days FOR after permit is issued. OTHER CONDITION INFORMATION 5. Pre -occupancy inspections by Fire and Building inspectors required. 6. Post -removal inspection by Building inspector is required. 7. Installation, use and maintenance of equipment and components shall be per manufacturer's specifications, installation instructions, and applicable state codes. 8. Heating equipment must be approved by Fire Marshal. 9. All governor -issued orders and guidelines related to COVID 19 must be observed. ' •NS - Schedule •https://Inspection.MvBuildingPermit.com COMPLETED RESULT SEQID INSPECTION TYPE INSPECTOR NOTES DATE X-2 ENGINEERING FINAL X-1 FIRE FINAL X-3 BUILDING FINAL X-3 BUILDING FINAL" Printed: Tuesday, December 15, 2020 7:00:59 AM 2 of 2