Loading...
Building Permit•M MERCIAL BLDG PermitCity NUM PERMITJ[M • • • • 121 5th Ave N, Edmonds WA 98020 ww.edmondswa.gov Type: COMMERCIAL BLDG Owner/ Business: CHARLES WRIGHT Status: ISSUED Subtype: COM ALTERATION OR REPAIR Parcel No: 27032500306000 Site Address: 728 EDMONDS WAY EDMONDS,WA 98020-5126 Applied: 7/16/2020 Subdivision: 006104, BLA LL-2000-134 Lot: 0 Issued: 5/5/2021 Fire Sprinklers: Yes Lot Area: 72,805 Zoning: BP Final: Valuation: $245,523.00 Occupancy Type: 11/A2 Construction Type: VB Expiration Date: 4/30/2022 Code Edition: 2015 No. Stories: 1 # of Dwelling Units: 0 Issued by: NED Scope of Work: ROSEWOOD COURTS- ADD 4 BED/4 BATH P&M SEP. WA State Contractor L & I #: City of Edmonds Business License #: 602454996-001-0001 CONTACTS NAME TYPE NAME ADDRESS PHONE EMAIL APPLICANT CHARLES WRIGHT 3802 29TH AVE W, SEATTLE WA (206)285-7167 CHARLES@WRIGHTARCH.COM 98199 CONTACT WRIGHT ARCHITECTURE 3802 29TH AVE W, SEATTLE WA (206)285-7167 charles@wrightarch.com 98199 CONTRACTOR CONTRACTOR UNKNOWN OWNER NORTHWEST CARE SENIOR 18887 STATE HWY 305 700, (206)842-0929 LIVING POULSBO WA 98370 FEE INFORMATION DESCRIPTION ACCOUNT AMOUNT PAID PAID DATE RECEIPT # 2020 TRANSPORTATION IMPACT 112.502.345.86.000.00 $10,175.60 $10,175.60 5/5/21 R12178 FEE ADB REVIEW TYPE 1 001.000.345.81.000.00 $275.00 $275.00 5/5/21 R12178 CITY TECHNOLOGY FEE CHARGED 001.000.321.99.100.00 $40.00 $40.00 5/5/21 R12178 PER PERMIT COMMERCIAL STATE SURCHARGE 001.000.237.150 $25.00 $25.00 5/5/21 R12178 ENGINEERING INSPECTION FEE 001.000.341.82.000.00 $660.00 $660.00 5/5/21 R12178 PERMIT FEE - COMMERCIAL 001.000.322.10.000.00 $1,851.20 $1,851.20 5/5/21 R12178 PLAN REVIEW FEE - COMMERCIAL 001.000.345.83.000.00 $1,998.52 $1,998.52 7/17/20 R6524 STORMWATER ENGINEER REVIEW 001.000.341.82.000.00 $390.00 $390.00 5/5/21 R12178 FEE TRANSPORTATION IMPACT ADMIN 001.000.341.82.000.00 $100.00 $100.00 5/5/21 R12178 FEE - MF COMM TOTALS: $15,515.32 $15,515.32 CONDITIONS CONDITION TYPE STATUS NOTES Printed: Wednesday, May 05, 2021 12:40:36 PM 1 of 3 WMERCIAL BLDG Permit M PERMIT NUM of Edmonds ILF EdmondsCity 121 5th Ave N, ••� i0AL 1 1 1 www-. •. • 1- HOLD HARMLESS - Applicant on behalf of his or her spouse heirs assigns and successors in interests, agrees to indemnify defend and hold harmless the City of Edmonds, Washington, its officials, employees, and agents from any and all claims for damages of whatever nature, arising directly or indirectly from the issuance of this permit. Issuance of this permit shall not be deemed to modify, waive or reduce any requirements of any City ordinance nor limit in any way the City's ability to enforce any ordinance provision. 2 - PERMIT DISCLOSURE - Any request for alternate design, modification, variance or other administrative deviation from adopted codes ordinances or policies must be specifically requested in writing and be called out and identified. Processing fees for such requests FOR shall be established by Council and shall be paid upon submittal and are nonrefundable. ALL BUILDING PERMITS INFORMATION 3- SOUND OR NOISE - Sound/Noise originating from temporary construction sites as a result of construction activity are exempt from the noise limits of ECC Chapter 5.30 only during the hours of 7:OOam to 6:OOpm on weekdays and 10:OOam to 6:OOpm on Saturdays, excluding Sundays and Federal Holidays. At all other times the noise originating from construction sites/activities must comply with the noise limits of Chapter 5.30, unless a variance has been granted pursuant to ECC 5.30.120. 4 - OCCUPANCY - Final approval on a project or final occupancy approval must be granted by the Building Official prior to use or occupancy of the building or structure. Check the job card for all required City inspections including final project approval and final occupancy inspections. It is the owner's responsibility to repair/replace all damage of utilities or frontage DAMAGE TO FRONTAGE FOR improvements in City right of Ways or Easements to City Standards caused by or IMPROVEMENTS INFORMATION occurring during the permitted project. ELECTRICAL PERMIT FOR Obtain Electrical Permit from State Department of Labor and Industries 425-290-1309. NFORMATION FOR Maintain erosion and sedimentation control per City and SWMMW standard ESC REQ INFORMATION requirements. EXIT SIGNAGE AND EMERGENCY FOR Final locations of illuminated exit signs and emergency lighting subject to field inspection LIGHTING INFORMATION by the Fire Marshal. INSP PRIOR TO BACKFILL FOR Call for all required inspections. All work shall be inspected prior to backfill. NFORMATION Installation, use and maintenance of equipment and components shall be per MANUFACTURER SPECS FOR manufacturers specifications, installation instructions, and applicable state codes. INFORMATION provide manufactures installation instructions on site for Building Inspector. Nothing in this permit approval process shall be interpreted as allowing or permitting the maintenance of any currently existing illegal, nonconforming or unpermitted building, FOR structure or site condition which is outside the scope of the permit application, regardless NONCONFORMING DISCLAIMER INFORMATION of whether such building, structure or condition is shown on the site plan or drawing. Such building, structure or condition may be the subject of a separate enforcement action. Final approval on a project or final occupancy approval must be granted by the Building OCCUPANCY FOR Official prior to use or occupancy of the building or structure. Check the job card for all INFORMATION required City inspections including final project approval and final occupancy inspections. The issuance of this permit in no way constitutes approval from any other agencies REGULATING AGENCIES FOR having regulatory authority over the facility and this construction activity. It is the INFORMATION responsibility of the property owner to obtain any and all such required approvals. Special inspections have been called for on this project and are noted on the approved SPECIAL INSPECTION BUILDING FOR construction plans. It is the owner and or contractors responsibility to ensure that reports DIVISION INFORMATION are provided to the City on a weekly basis. STORM COVENANT FOR A stormwater covenant shall be approved for recording prior to project final approval. NFORMATION FOR All utilities shall be located prior to any excavation. New locates shall be called for if at UTILITY LOCATES INFORMATION time of excavation, original locates are no longer identifiable. Printed: Wednesday, May 05, 2021 12:40:36 PM 2 of 3 SEQID INSPECTION TYPE INSPECTOR COMPLETED DATE RESULT NOTES A-1 BUILDING PRECON B-2 FOOTINGS B-2 FOUNDATION WALL B-3 EXT GYP SHEATHING B-3 EXT WALL SHEATHING B-3 ROOF SHEATHING B-4 DRYWALL FASTENING B-4 FIRESTOPPING B-4 FRAMING B-5 BLDG SPECIAL INSPECTION B-5 INSULATION ENERGY B-7 BUILDING OTHER INSP X-3 BUILDING FINAL" B-3 PRE ROCK SHAFTS ETC A-1 TESC AND MOBILIZE E-3 STRM CONVEYANCE E-3 STRM COVENANT E-3 STRM FOOTING DRAIN E-3 STRM PERVIOUS SURFACES E-3 STRM TIGHTLINE E-9 COMPOST AMEND X-2 ENGINEERING FINAL A-1 ENGINEERING PRECON Printed: Wednesday, May 05, 2021 12:40:36 PM 3 of 3