Loading...
Building Permit 2020PLUMBING Permit PERMIT NU City of Edmonds www.edmondswa.gov Type: PLUMBING Owner/ Business: SCOTT BROOKS Status: ISSUED Subtype: COMMERCIAL PLUMBING Parcel No: 00451900100401 Site Address: 23632 HIGHWAY 99EDMONDS,WA98026-9211 Applied: 8/14/2020 Subdivision: 004519, LLA LL-2001-101 Lot: 0 Issued: 9/1/2020 Fire Sprinklers: Lot Area: Zoning: Final: Valuation: $0.00 Occupancy Type: Construction Type: Expiration Date: 2/28/2021 Code Edition: 0 No. Stories: 0 # of Dwelling Units: 0 Issued by: NED Scope of Work: SAFEWAY FLORAL DEPT PLUMBING- OVWSD WA State Contractor L & I #: City of Edmonds Business License #: 602454996-001-0001 CONTACTS NAME TYPE NAME ADDRESS PHONE EMAIL APPLICANT SCOTT BROOKS 3903 SMITH AVE, EVERETT WA (425)303-0828 INFO@WILLIAMS-MECHANICAL.COM 98201 CONTACT WILLIAMS MECHANICAL INC 3903 SMITH AVE, EVERETT WA (425)303-0828 scott@williams-mechanical.com 98201 CONTRACTOR WILLIAMS MECHANICAL, INC. 3903 SMITH AVE, EVERETT WA (425)303-0828 info@williams-mechanical.com 98201 FW WA -AURORA PO BOX 790830, SAN ANTONIO OWNER MARKETPLACE LLC TX 78279 Iq •' • DESCRIPTION ACCOUNT AMOUNT PAID PAID DATE RECEIPT # 1 -BASE FEE FOR PLUMBING 001.000.322.10.000.00 $50.00 $50.00 9/1/20 R7372 PERMITS BUILDING PERMIT FEE 001.000.322.10.000.00 $110.00 $110.00 9/1/20 R7372 CITY TECHNOLOGY FEE CHARGED 001.000.321.99.100.00 $40.00 $40.00 9/1/20 R7372 PER PERMIT EACH PLUMBING FIXTURE ON ONE 001.000.322.10.000.00 $90.00 $90.00 9/1/20 R7372 TRAP TOTALS: $290.00 $290.00 77 CONDITION TYPE STATUS NOTES Printed: Tuesday, September 01, 2020 12:34:06 PM 1 of 2 PLUMBING Permit PERMIT NUM City of • • • www.edmondswa.gov • 1- HOLD HARMLESS - Applicant on behalf of his or her spouse heirs assigns and successors in interests, agrees to indemnify defend and hold harmless the City of Edmonds, Washington, its officials, employees, and agents from any and all claims for damages of whatever nature, arising directly or indirectly from the issuance of this permit. Issuance of this permit shall not be deemed to modify, waive or reduce any requirements of any City ordinance nor limit in any way the City's ability to enforce any ordinance provision. 2 - PERMIT DISCLOSURE - Any request for alternate design, modification, variance or other administrative deviation from adopted codes ordinances or policies must be specifically requested in writing and be called out and identified. Processing fees for such requests ALL BUILDING PERMITS FOR shall be established by Council and shall be paid upon submittal and are nonrefundable. INFORMATION 3- SOUND OR NOISE - Sound/Noise originating from temporary construction sites as a result of construction activity are exempt from the noise limits of ECC Chapter 5.30 only during the hours of 7:00am to 6:00pm on weekdays and 10:00am to 6:00pm on Saturdays, excluding Sundays and Federal Holidays. At all other times the noise originating from construction sites/activities must comply with the noise limits of Chapter 5.30, unless a variance has been granted pursuant to ECC 5.30.120. 4 - OCCUPANCY - Final approval on a project or final occupancy approval must be granted by the Building Official prior to use or occupancy of the building or structure. Check the job card for all required City inspections including final project approval and final occupancy inspections. Applicant on behalf of his or her spouse heirs assigns and successors in interests, agrees to indemnify defend and hold harmless the City of Edmonds, Washington, its officials, FOR employees, and agents from any and all claims for damages of whatever nature, arising HOLD HARMLESS INFORMATION directly or indirectly from the issuance of this permit. Issuance of this permit shall not be deemed to modify, waive or reduce any requirements of any City ordinance nor limit in any way the City's ability to enforce any ordinance provision. Installation, use and maintenance of equipment and components shall be per MANUFACTURER SPECS FOR manufacturers specifications, installation instructions, and applicable state codes. INFORMATION provide manufactures installation instructions on site for Building Inspector. The issuance of this permit in no way constitutes approval from any other agencies REGULATING AGENCIES FOR having regulatory authority over the facility and this construction activity. It is the INFORMATION responsibility of the property owner to obtain any and all such required approvals. • •NS - Schedule •nline at: https://Inspection.MVBuildingPermit.co COMPLETED RESULT SEQID INSPECTION TYPE INSPECTOR NOTES DATE X-0 PLUMBING FINAL" B-3 PLUMB GROUND WK B-3 PLUMB ROUGH IN B-5 CROSS CONN FINAL B-7 BUILDING OTHER INSP X-3 BUILDING FINAL" Printed: Tuesday, September 01, 2020 12:34:06 PM 2 of 2