APPROVED ENG PLN BLD2021-0326+Site_Plan+3.4.2021_10.52.49_AM+2075956RECEIVED
Mar 04 2021
CITY OF EDMONDS
DEVELOPMENT SERVICES
DEPARTMENT
BLD2021-0326
BLD2021-0326
ENGINEERING DIVISION
APPROVED AS NOTED
__________________03/12/2021Jeff Whatmore OWNER/CONTRACTOR IS RESPONSIBLE FOR
EROSION CONTROL AND DRAINAGE
OWNER/CONTRACTOR RESPONSIBLE FOR LOCATING
ALL ON SITE UTILITIES. RELOCATION/REVISION TO ANY
UTILITIES MAY REQUIRE A SEPERATE PERMIT.
Zone __________ Corner ____ Flag ____
Setbacks: Required Actual
Front _______ _______
Sides _______ _______
Rear _______ _______
Other _______ _______
Height _______ _______
RS-8
25'
25'
7.5'13.3,
26.6'
15'17'
APPROVED BY PLANNING
Mar 12 2021