Loading...
BLD2021-0449+Job Description+3.29.2021_10.19.58_AM+2115605Demolition Plan     All work will be completed by homeowner over a maximum 3‐day period.   No heavy equipment will be required.    Structures will be removed with hand tools (socket wrench, demo bar), and small electric saws  (circular saw, Sawzall).    All demolished materials will be hauled away and disposed at county waste transfer station.   Demolition of these structures will not require the clearing of any vegetation and will not result  in ground disturbance.    No grading is required for this project.