Loading...
BLD2020.0370 APP AND ESTIMATESTO: Denise Nelson Permit Coordinator City of Edmonds 1215th Ave N, 2nd Floor Edmonds, WA 98020 425-771-0220 EXT 1336 FROM: Laurie Carter 22908 74th Ave West Edmonds, WA 98026 206-235-8498 SUBJECT: Building Permit Application 14 pages including this cover page BUILDING PERMIT APPLICATION PemJt#: Development Services Building Division 121 Sth Ave N / Edmonds, WA 98020 TYPE OF PERMIT (Provide Details on Page 2) 425.771.0220 For handouts, submittal requirements, permit status and inspection scheduling information go to: PLEASE NOTE: Intake appointments are required for New Single Family Residences, Large Additions, ADU's, New Commercial, and Major Tenant Improvement application submittals. If plans are prepared by a profession- al, electronic files are requested in addition to the hard copies. Please bring electronic files on a flash drive or coordinate for electronic transfer. Please call425-771-0220 to schedule an intake appointment! JOB SITE INFORMATION/LOCATION: (where the work is taking place) Job Site Address:a�41iy 14 /+V e W L7 S Parcel: OO y y 15 00J-0 P r)- DO Lot /Unit/Suite #: Subdivision: PROPERTY OWNER: Name: I_Al)'k-::- .: Mailing Address: �r; 'T sgclo -7c(, ye l,0�T City/State/Zip: C—O/ftA/ fJ S / LU A f'1 )- 6'y(0 Phone #: r7-b o -'m S -Ekt Cr 9 Email: ILLNMI}Le eL c OC .WIC OWNER INSTALLATION: 'if yes, read and sign' Will work be performed by the property owner? ❑Yes�No I own, reside in, or will reside in the completed structure. This installation is being made on property that I own which is not intended for sale, lease, rent, or exchange according to RCW 18.27.090. Owner Signature: APPLICANT/ CONTACT INFORMATION: Name of Applicant: L-%it)AZ Cf�':2 i t✓!V Mailing Address: r3a-ciu8 -74 fn rCy & w ieS-r City/State/Zip: C-O A'\O.1/ P f w c& A 7 Gl I) A ( Phone #: ; U-7 93 5-- O ��77`t (19 E-mail: IU Ajw\,orL O CDpt f , Lry-- GENERAL CONTRACTOR: (If different from applicant) General Contractor: Mailing Address: S c L city/State/Zip: 6 ✓ ( LOse-y %o/Zn'l Phone #-. E-mail- STATE UBI #: CITY OF EDMONDS BUSINESS LICENSE#: WA STATE CONTRACTOR L & I #: (CCB) & EXPIRATION DATE: ❑ Accessory Structure/ Detached Garage p Addition ❑ Demolition ❑ Mechanical ❑ New Single Family / Duplex ❑ Plumbing ❑ Fire Sprinkler t? Remodel ❑New Commercial/ Mixed Use ❑Re -Roof ❑ Signs ❑ Tank ❑ Tenant Improvement ❑ Other Remodel Permit fees are based on: The value of the work performed. Indicate the value (rounded to the nearest dollar) of all equipment, materials, labor, overhead, and The profit for the work indicated on this application. Valuation: 5 5 0@ O. 00 PROPOSED NEW SQUARE FOOTAGE FOR THIS APPLICATION Basement sq it: Finished Unfinished 1st Floor, sq it: 2nd Floor, sq it: Garage/Carport:, sq it: Deck/Covered Porch/Patio: Other sq it: PROJECT DESCRIPTION [.YQAL,DSU(sS-IOA-A(sL- CLOSE, Yr\7oPow ant aoomPA:96; AnD,ul LzGNiS a �2I=A- .s -vL/ tln�-treu now OEri- (1-oo Nl. 4((�O�}ii.Ul* ILTiLREfJ--I\eo hALI'Sel[Aj ",C-a,ikr1,Ltyhh A ? (Lznnu�l,� I wgLt ofciLertfockil l�4chpnCID16� }U O(1G-J shel�es.i�L+k 1�\icrow+rUe NEw i-t.00rs IU Ir_.}LI.Q rL ilfw')C0Jen CitX1,, I certify that the information I have provided on this form application is true, comedt and complete, and that I am the property owner or duty authorized agent of the property owner to submit a permit application to the City of Edmonds. /� O Print Name: Lf4(%9L-L E `Q1L-!ei` Signature: Date 3 3/ 3v GENERAL COMMERCIAL DATA Occupancy Group(s): Occupant Load(s): Type(s) of Construction: Fire Sprinklers: Yes ❑ No ❑ WA STATE ENERGY CODE: If your project affects the building envelope, mechanical systems, and/or lighting, you must complete the appropriate WSECforms. DEFERRED SUBMITTALS: All commercial building permits that will require associated plumbing, mechanical, fire sprinkler, and/or fire alarm permits are applied for separately. TI / CHANGE OF USE / NEW BLDG: Include TRAFFIC IMPACT worksheet MECHANICAL EQUIPMENT COUNTS (New and Relocated) BTUs Gas /Elec/Other Qty A/C Unit /Compressor Air Handier/VAV Boiler Dryer Duct Exhaust Fans il c a Fireplace Furnace Heat Pump Unit Hydronic Heating Roof Top Unit (Provideeleva- tions if a Commercial Bldg) Other: PLUMBING FIXTURE COUNTS (New, Relocated or re -piped) Qty City Clothes Washer i Tub/Showers Dishwasher jBackflow Device (RPBA, DCDA, AVS , Drinking Fountain Pressure Reduction/ Regulator Valve Floor Drain/Sink Refrigerator Water Supply Hose Sibs Water Heater - Tankless?YorN Hydronic Heat Water Service Line Sinks ' Other: Toilets n ,, Other: Co f.X.X O — Ai0f SLLV 7 � BTUs Qty BTUs Qty A/C Unit Outdoor BBQ/ Fire pit Boiler Stove/Range/Oven Dryer Water Heater Fireplace/ Insert I I I other. I Furnace I I I Other: Carbon Dioxide Nitrous Oxide Helium Oxygen Medical Air Other: Medical -Surgical Vacuum Other: Type of structure to be demolished: O APO c•AE OA— 'SiW-)e c ji,S & Square footage of structure to be demolished: AHERA Surveydone? Y/N PSCAA Case#: Critical Areas Determination: Study Required ❑ Conditional Waiver ❑ Waiver ❑ I Fill in Place ❑ Fill Material: Removal ❑ I Size oil (Gallons) Critical Areas Determination: Study Required ❑ Conditional Waiver ❑ Waiver ❑ Grading: Cut cubic yards Fill cubicyards Cut / Fill in Critical Area: Yes ❑ No ❑ APPLICATIONS: Applications are valid for a maximum of 1 year. ESLHA Applications, 2 years. LICENSING: All contractors and subcontractors are required to be licensed with Washington State Department of labor & Industries and have a current City of Edmonds Business License. Home Owners Club PO Box 19073 Seattle, WA 98109-1073 American Environmental Construction LLC Steve Romero PO Box 81005 Seattle, WA 98108-1005 WA Contractor # AMERIEC996MB J & I Construction LLC lone] (Johnny) Hiticas 13025 NE 198th Ct Woodinville, WA 98072-5763 WA Contractor # JICONCL869B1 Quality Plumbing & Sewer Bryan Hutchison 1112 NW 53rd Street Seattle, WA 98107-3735 WA Contractor # QUALIP*181RN Current -Flo Electric LLC Florin Boicu 5020 Maltby Road Woodinville, WA 98072-8368 WA Contractor # CURREFE870L1 Lane Hardwood Floors LLC Brad Greco 14700 aurora Avenue North Seattle, WA 98133 Lifetime Heating & Air Conditioning Kevin Breiwick 2801 Bickford ave Suite 103 Snohomish, WA 98290 r 3,Y it -j O OviS oL- l�n 2 oJ2 , 6 l 9 � N / `Cb r Y� s Q a 5 t � N 3 0 00 22 M i�oo2 1 u 1C;-\CftEm N m �3 Jrz � `I aign poo2- ''- I v U�i-ssa; z o o rr <b 00 3� o c� � r n �z 3 �3 C J d cb o O 3 J pouR J Q-j LlfEU �. r qq '7 V O_ LIFETIME Lifetime Heating&Air Conditioning Estimate 6956918 2801 Bickford Ave Suite 103 Job 6920709 Snohomish,WA 98290 Estimate Date 3/9/2020 425-553-4328 Customer PO Billing Address Home Owners Club! 7334 19th Avenue Northwest Seattle, WA 98117 USA Estimate Details Duct modification Task# Description ! Install Install 5" heat supply run to new bathroom. Install 2 1 /4" x 10 floor grille. Install metal duct, seal and insulate. Provide and install new baseboard supply grille that feeds kitchen area. All labor and materials included. Thank you for choosing Lifetime Heating & Air Conditioning Job Address Laurie Carter 22908 74th Avenue West Edmonds, WA 98026 USA Quantity Your Price Your Total 1.00 $1,125.00 $1,125.00 Sub -Total $1,125.00 Tax $117.00 Total $1,242.00 Est. Financing $14.78 THIS IS AN ESTIMATE, NOTA CONTRACT FOR SERVICES. The summary above is furnished by Kevin Breiwick as a good faith estimate of work to be performed at Laurie Carter and is based on our evaluation and does not include material price increases or additional labor and materials which may be required should unforeseen problems arise after the work has started. I understand that the final cost of the work may differ from the estimate, perhaps materially. THIS IS NOT A GUARANTEE OF THE FINAL PRICE OF WORK TO BE PERFORMED. 1 agree to the estimate and authorize Kevin Breiwick to perform the work as summarized and on these estimated terms, and I agree to pay the full amount for all work performed. ffiP : c - H'ER PO Box 19073 • Seattle, WA 98109-1073 phone:206-622-3500 fax:206-622-3503 emafL staff@homeownersclub.org FOR: Laurie Carter 22908 74th Ave W Edmonds WA 98026 2062358498 kinmal@peoplepc.com (Member) LABOR, MATERIALS and SPECIAL PROVISIONS: ESTIMATE BY: Current -Flo Electric LLC 5020 Maltby Rd Woodinville, WA 98072-8368 CURREFE870Ll (Authorized Contractor) March 10, 2020 A. Phase 1 work. $1280.00 1. Provide material and install a new 30Amp 240Volt 4 wire dryer circuit. Install at new location. 2. Relocate existing washer circuit. 3. Provide and install a 120cfm Panasonic fan in laundry area. Includes a programmable timer for control. 4. Rough in a new light location and install 2 owner supplied light fixtures. B. Phase 2 work. $3400.00 1. Rough in a new circuit for microwave. 2. Rough in a new circuit for kitchen receptacles. 3. Install new receptacles on kitchen counter where code requires. 4. Provide and install new LED tape light at under cabinets. 5. Install new switch for under cabinet lights. 6. Install new owner supplied light fixtures at existing locations at kitchen. 7. Install wiring for hood fan if required. 8. Provide and install new receptacles and switches at kitchen. 9. Provide dedicated circuit for new bathroom. 10_ Provide and install new fan at new bathroom. 11. Install new owner supplied vanity light. 12. Install code required outlet and switches at new bathroom. Exclusions: 1. Patching of drywall. 2. Light fixtures. Page 1 of>< I HOME OWNERS CzLUB. PO Box 19073 • Seattle, WA 98109-1073 phone:206-622-3500 fax:206-622-3503 email• staff@homeownersclub.org FOR: Carter, Laurie HOC # 564892 22908 74th Ave West Edmonds,. WA 98026 kinmal@peoplepc.com (Member) LABOR, MATERIALS and SPECIAL PROVISIONS: ESTIMATE February 22, 2020 BY: Quality Plumbing&Sewer 1112 NW 53rd St Seattle, WA 98107-3735 QUALIP*181 RN (Authorized Contractor) Quality Plumbing is pleased to quote the following prices to perform the work described below: I. Rough -in Plumbing Phase 1 1. Cut-out the existing plumbing utility sink $ 1,583.43, plus tax. Cap the old vent line or connect the new vent line to the vent in the attic. What can be done will be determined once we open things up. We may need to drill the roof and install a new vent for the clothes washer. 2. Install new plumbing for a clothes washer on the exterior wall to have the top of the water outlet box at 36-inches. II. Rough -in Plumbing Phase 2 $ 1,341.16, plus tax. 1. Cut-out the existing plumbing for the kitchen sink. 2. Clean-up and move the plumbing for the kitchen sink as needed. 4. Install a new hose bib inside the kitchen sink cabinet facing the backyard. Please add, $ 1,117.04, plus tax, to make the final drain and water connections to the kitcher. sink, faucet and basket strainer. Make the final drain and water connections to the dishwasher. Connect the water supply line to the refrigerator. III. Rough -in Plumbing Phase 3 $ 2,334.17, plus tax. 1. Install new rough -in plumbing for one toilet and one lav sink in the laundry area. Please add, $ 663.52, plus tax, to make the final drain and water connections to the bathroom sink and toilet at trim time. Page 1 of& Job Notes: a. All new waste and vents will be PVC and/or ABS DWV. All water piping will be Pex with areas of type °M" copper and with copper terminations. b. All work will be performed to local codes and inspected. The cost of the plumbing permits has been included, c_ The owner may need to hire a roofer to make the final water tight seals to the new roof flashings installed for the plumbing. d. The final connections and installation of the clothes washer is not included in the above pricing. This estimate shall remain in force for 45 days. Acceptance creates a contract between the parties. When accepted, please return a signed copy to Club or email SUBTOTAL.• $ 6 , 039.3 2 acceptance along with a forwarded copy of the estimate. 10.4% TAX: $628. 09 Payment shall be made to Home Owners Club upon receipt of Club billing after satisfactory completion of work Accepted: x (Member Signature) TOTAL: $6,667.41 Quality Plumbing • 206-789-7676 (Authorized Contractor) Page 2 of 3 AMER/CAN Environmental Construction LLC Asbestos - Lead - Mold - Demolition P.O. Box 81005 Seattle, WA 98108-1005 Phone: (206) 267-0746 Fax: (206) 267-0753 Billing Address Laurie Carter 22908 - 74th Ave W Edmonds, WA 98026 Job Address Single Family Residence 22908 - 74th Ave W Edmonds, WA 98026 Invoice Date 3/17/2020 Invoice # AEC Job # Terms Due Date P.O No. Estimator 200129 20076 Net 15 Days 4/1/2020 SDR Description Amount ASBESTOS ABATEMENT PER PROPOSAL & CONTRACT DATED 02/10/2020. WORK COMPLETED 03/12/2020. 3,270.00 Subtotal $3,270.00 Please make all checks payable to: American Environmental Construction, LLC., and send to: P.O Box 81005 Seattle, WA 98108-1005 Questions? Office: 206-267-0746 Fax: 206-267-0753 WA Contractor # AMERIEC996MB Member of the Better Business Bureau Sales Tax (10.4n ) $340.08 Total $3,610.08 Payments/Credits $0.00 Balance Due $3,610.08 THANK YOU FOR YOUR BUSINESS ffMER/CAN nvironmental Construction LLC Asbestos - Lead - Mold - Demolition Name: Laurie Carter 22908 74th Ave W Edmonds, WA 98026 Completion Date: 3/12/2020 Email: kinmal@peoplepc.com --- Letter of Comp!etion --- (20076) P.O. Box 81005 Seattle, WA 98108 - 1005 Phone: (206) 267-0746 Fax: (206) 267-0753 March 17, 2020 Re: Asbestos Abatement Services at: 22908 74th Ave E Edmonds, WA 98026 This is to certify that American Environmental Construction LLC has removed the asbestos containing material from the above referenced address per our Proposal and Contract dated February 10, 2020. Clearance Air Monitoring (Sample Type=CL) as reported on the Air Sample Data Sheet (available upon request) indicates that the airborne asbestos level is below the EPA established standard of .01 fibers/cubic centimeter for clean air after an abatement project. Accordingly, the work area is safe, regarding asbestos exposure, for re - occupancy. Please call me at 206-267-0746 if you have any questions or comments regarding this Letter of Completion. Respectfully submitted, American Environmental Construction, LLC I Dee Surface -Office Manager