Loading...
Building Permit 2020BLDG Permit PERMITNUM- Ir'SIDENTIAL City of • • • . •:i 1 1 1 4 -. •. Type: RESIDENTIAL BLDG Owner/ Business: MADDEN MICHAEL & KRESE LINDA Status: ISSUED Subtype: ADDITION Parcel No: 00619400700701 Site Address: 1143 6TH AVE S EDMONDS,WA 98020-4677 Applied: 2/20/2020 Subdivision: 006194 Lot: 0 Issued: 6/1/2020 Fire Sprinklers: Lot Area: Zoning: RS-6 Final: Valuation: $1,800.00 Occupancy Type: R3 Construction Type: VB Expiration Date: 6/1/2021 Code Edition: 2015 No. Stories: 0 # of Dwelling Units: 1 Issued by: WAC Scope of Work: MADDEN -ROOF ADDITION AND DECK WA State Contractor L & I #: City of Edmonds Business License #: 602454996-001-0001 CONTACTS NAME TYPE NAME ADDRESS PHONE EMAIL APPLICANT MICHAEL A. GEORGE 922 1ST ST, SNOHOMISH WA (425)330-5505 MIKEAIA@YAHOO.COM ARCHITECT 98290 OWNER MADDEN MICHAEL & KRESE 1143 6TH AVE S, EDMONDS WA (206)683-2983 MMADDEN@BBLLAW.COM LI N DA 98020-4677 MEd FEE INFORMATION DESCRIPTION ACCOUNT AMOUNT PAID PAID DATE RECEIPT # CITY TECHNOLOGY FEE CHARGED 001.000.321.99.100.00 $40.00 $40.00 6/1/20 R5543 PER PERMIT PERMIT FEE - RESIDENTIAL 001.000.322.10.000.00 $169.00 $169.00 6/1/20 R5543 PLAN REVIEW FEE - RESIDENTIAL 001.000.345.83.000.00 $143.65 $143.65 2/20/20 R3696 RESIDENTIAL STATE SURCHARGE 001.000.237.150 $6.50 $6.50 6/1/20 R5543 TOTALS: $359.15 $359.15 CONDITIONS CONDITION TYPE STATUS NOTES Printed: Monday, June 01, 2020 10:11:08 AM 1 of 2 MIDENTIAL BLDG PermitCity • • • • PERMITNUM 1215th Ave N, Edmonds WA98020 24, www.edmondswa.gov • 66 1- HOLD HARMLESS - Applicant on behalf of his or her spouse heirs assigns and successors in interests, agrees to indemnify defend and hold harmless the City of Edmonds, Washington, its officials, employees, and agents from any and all claims for damages of whatever nature, arising directly or indirectly from the issuance of this permit. Issuance of this permit shall not be deemed to modify, waive or reduce any requirements of any City ordinance nor limit in any way the City's ability to enforce any ordinance provision. 2 - PERMIT DISCLOSURE - Any request for alternate design, modification, variance or other administrative deviation from adopted codes ordinances or policies must be specifically requested in writing and be called out and identified. Processing fees for such requests FOR shall be established by Council and shall be paid upon submittal and are nonrefundable. ALL BUILDING PERMITS INFORMATION 3- SOUND OR NOISE - Sound/Noise originating from temporary construction sites as a result of construction activity are exempt from the noise limits of ECC Chapter 5.30 only during the hours of 7:00am to 6:00pm on weekdays and 10:00am to 6:00pm on Saturdays, excluding Sundays and Federal Holidays. At all other times the noise originating from construction sites/activities must comply with the noise limits of Chapter 5.30, unless a variance has been granted pursuant to ECC 5.30.120. 4 - OCCUPANCY - Final approval on a project or final occupancy approval must be granted by the Building Official prior to use or occupancy of the building or structure. Check the job card for all required City inspections including final project approval and final occupancy inspections. Work approved under this permit may or may not qualify as an essential or allowed activity per the Governors Stay Home, Stay Healthy Order. Refer to the Order and the FOR Citys website for up-to-date information related to development activities during COVID- COVID-19 NOTICE INFORMATION 19. Issuance of this permit does not certify that construction is allowed to immediately occur, and inspections may or may not be granted accordingly. Construction activities and all required inspections will resume when the Order has been lifted. INSPECTIONS - Schedule Online at: https://Inspection.MyBuildingPermit.com COMPLETED RESULT SEQID INSPECTION TYPE INSPECTOR NOTES DATE B-1 SETBACKS B-2 FOOTINGS B-2 ROOF TEAR OFF B-3 EXT WALL SHEATHING B-3 ROOF SHEATHING B-4 DRYWALL FASTENING B-4 FIRESTOPPING B-4 FRAMING B-5 INSULATION ENERGY B-5 TEAR OFF OR SHEATHING B-7 BUILDING OTHER INSP X-3 BUILDING FINAL Printed: Monday, June 01, 2020 10:11:08 AM 2 of 2